You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

A A
B B
C C
D D
E E
F F
G G
CHECKED ISSUED FOR
REVISION DESCRIPTION
INITS DATE
CLIENT PROJECT MANAGEMENT CONSULTING ENGINEERS SECURITY ARCHITECT CONTRACTOR SUBCONTRACTOR KEY-PLAN
SHOP DRAWING SIGN DATE PROJECT TITLE
A FOR REVIEW AE 04-15
..\47_Suspended Ceiling\FORM DWG A3\JKT05-Piling-T&T-2032566.png ..\47_Suspended Ceiling\FORM DWG A3\JKT05-Piling-AURECON(2)-2032568.png
..\47_Suspended Ceiling\FORM DWG A3\JKT05-Piling-CUNDAL(3)-2032570.png
DRAWN BY
JKT05-Data Centre Project
H SP
H
..\47_Suspended C eiling\FOR M D WG A3\JKT05-Piling-AWP(2)-2032572.png
..\47_Suspended Ceiling\FORM DWG A3\JKT05-Piling-Microsoft-2032544.png
PT. Leighton Contractors Indonesia ARCHITECT ENGINEER DRAWING TITLE DRAWING REF.
TOMI HENDRAWAN
DETAIL COVER JKT05-C-F-71-0
STRUCTURE ENGINEER
WATER METER CHAMBER
..\12_Drainage CKG\Reff\24082022_From Mba nisa\JKT05-PLCI-SW-CV-NE-External-tempsnip-317334.png
SUNARDI
PT MICROSOFT INDONESIA Date Recived:
Date Returned
:
Received by :
Commented by:
Date Recived:
Date Returned
:
Received by :
Commented by:
Date Recived:
Date Returned
:
Received by :
Commented by:
Date Recived:
Date Returned
:
Received by :
Commented by:
MEP ENGINEER DRAWING No. SCALE REVISION
No exception taken Approved with Comments No exception taken Approved with Comments No exception taken Approved with Comments No exception taken Approved with Comments DENI UMBARA AS SHOWN
Rejected see Marks
For Record Purposed
Revised & Resubmit
Submit Specified Detail
Rejected see Marks
For Record Purposed
Revised & Resubmit
Submit Specified Detail
Rejected see Marks
For Record Purposed
Revised & Resubmit
Submit Specified Detail
Rejected see Marks
For Record Purposed
Revised & Resubmit
Submit Specified Detail ENGINEERING MANAGER JKT05-LCI-SHD-CIV-532 SIZE PROJECT No. A
Signature: Date : Signature: Date : Signature: Date : Signature: Date : BESLINTON PARDEDE A3
1 2 3 4 5 6 7 8 9 10 11 12

You might also like