Rab Adc Pltu Lotar
Rab Adc Pltu Lotar
XXX
Cash Flow Project Suply Batubara
CIF Sandar
(Dalam Rupiah Penuh)
Hari
Fase I Fase II Total
No Uraian Persen
Kontrak Sandar/Loading Sandar/Loading
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
1 Tongkang - 1 1 2 3 4 1 2 3
2 Tongkang - 2 1 2 3 4 1 2 3
I Pembelian
1 Kontrak
- DP Batubara 50% 3,399,277,061 3,399,277,061
- Shipping Instruction
- Tongkang Sandar (Pelabuhan Muat) 40% 1,359,710,825 1,359,710,825 2,719,421,649
- Loading Ke Tongkang
- Dokumen Full 10% 339,927,706 339,927,706 679,855,412
3 Transhipment
- DP 50% 367,200,000 367,200,000 734,400,000
- Tongkang Sandar (Pelabuhan Muat) 0%
- Tongkang Sandar (Selesai Bongkar) 50% 367,200,000 367,200,000 734,400,000
4 Bayar Surveyor 100% 22,275,000 22,275,000 44,550,000
5 Asuransi 100% 18,750,000 18,750,000 37,500,000
6 Bayar Oprasional 100% 18,750,000 18,750,000 37,500,000
Total Beli - 3,418,027,061 367,200,000 - 1,359,710,825 - 380,952,706 - - 385,950,000 1,359,710,825 - 380,952,706 367,200,000 - - - - - 367,200,000 - - - - - - - - - - - - - 8,386,904,123
II Penjualan
1 Invoice 100% 4,680,582,834 4,680,582,834 9,361,165,668
Laba Penjualan - (3,418,027,061) (367,200,000) - (1,359,710,825) - (380,952,706) - - (385,950,000) (1,359,710,825) - (380,952,706) (367,200,000) - - - - - (367,200,000) - - - - - - - - - - - - - 974,261,546