OFFICE OF DIRECTOR (REVENUE)
DELHI JAL BOARD: GOVT OF NCT OF DELHI
VARUNALAYA PH-Il, KAROL BAGH, NEW DELHI-110005.
“STOP CORONA: Wear Mask, Follow Physical Distancing, Maintain Hand Hygiene”
NO, DJB/DOR/IFC/10/2021/523 Lo 637
CIRCULAR
DATED: 22-01-2021
Subject: Clarifications regarding Levy of Infrastructure Charges.
In reference to Circular No.DJB/DOR//Infra. Charges/2020/4957 to 5063 dated
06-10-2020, a number of queries/ representations are being received for clarification
from Revenue Offices as well as Engineering Divisions to Revenue Head Quarter. The
following clarifications are issued for guidance and properly levy Infrastructure Charges
[S.No
1
|
Query
Tf property is few years old having no
water connection and consumer
applies for new water connection will
Infrastructure Charges be applicable?
Clarifications |
For every new water/ sewer connection
Infrastructure Charges is applicable
on the existing buildings as |
well as new addition/ construction, if
plot size is above 200 Sq. Mtr.
What does the “Built up area” mean?
Whether it includes sum of areas of
all built up floors or only ground floor.
Whether Infrastructure Charges in @
multiple dwelling apartment/building
- Domestic or Commercial, is to be
paid by the applicant only for built-up
area of his property?
Is Infrastructure Charges applicable
on applied dwelling unit/ floor or
whole building?
Whether Infrastructure Charges is
payable at the time of re-opening of
existing connection?
Built up area is the sum total of carpet
area, area of wall and area of Balcony.
If owned by single owner, then it is
sum of built up area of all the floors, in
the entire building, otherwise portion/
built up area of unit of the individual
owner. |
Tn all cases where bulk connection is
not granted and individual connection
is provided, owner of that individual
property is required to pay
Infrastructure. Charges only for his
portion of property. In case whole
building is owned by single owner, |
Infrastructure Charges for all unit need
to be paid bythe owner of whole
property. Further, if there is already
connection in existence —_ for
any portion of building, Infrastructure
Charges for new connection (8) only for |
rest of the portion of the building will
be payable. a
Infrastructure Charges on re-opening |
of the existing connection is not
applicable However, Infrastructure |
Charges for additional connection(s) is
payable for rest of the portion of the
at property.
3. | What will happen, if a property is| Infrastructure Charges is not
having one water connection at| chargeable for already —_ existing
ground floor (Building is old) and now | connection.
apply water connection for first floor | However, for additional connection for
| or other (which is also old and area|1* Floor or other, Infrastructure |
more than 200 sq.mt.)? Charges is payable.Jou st soBreyo amonysexyuy sSeppng
Tenpipur ur ams poe juowoseq
{yu epssum0s 30 Suyamp
{OU St axsqn o8v0 uy “Addns rope yo
HonwiuswEne 10 amonneeyur Burkey
30} _pawas] st salirwyo - amonnseauy
evere dn aq Sujoq Supped
HAS _pue yuowreseq uo aiquondde
S{ saBreyo amonnsesuy uy OMIM.
“eT |
“pred 8} Iq sa8reyp uopoouuos yr
Atuo pasea[a: se poursep st uoq2auU0D
vere dnaimq Zunsp oy 103
Peses[ar useq Apeasre sey uonsomu0>
Joaos /iayen way ATUO afqeondde
yous} se8reyo _ amonyseguy
“0c0z
“01-90 a1ojoq poydde uoposuuocs wo
siqeondde s soBreyo armgonnsexuy sy
"er
‘staqvortdde oq pmnom vare soqz38
| HONS 30 %OT ® seBreyD amyonyseguy
ord ays uri Suppeg jo ware aortas
205 ‘oxoyersyy, “ajquondde 5 Supyred
Toaay-pqnut yo 98eo ut eaze dn aq pei}
| 9m] Jo %OT @ se yam se qooy punard
Wo vary uado ou Jo ofr @ saftey
“Burqreg 01 uonppe ur sy wry
Bupyred Jo “wore soraros soy quaurean,
Sh 2q Tas Jeym “roneMores eafizey3
ampnnsexuy jo ssodmd oy} rot
GI
| Satseneeiy ‘preog Jo worsjoep tad sy
“Aroyepueur
you st ued = Supimq —‘tonysod
SIS Tengoe Jo siseq ay) wo poyemnopeo
oq Seu soBreyp, amonyseyuy
esaareyo ompongseguy
40 qusurssosse xo pasmbex s} 0 10
Uonoues some weld Suprng somaqM
tr}
j veare dn-ymq umo
| S¥ JO s1seq om uo yom Sumjmp Araaa
Wo aiqeondde sy saBreyD amionysequy
<200}} oures ye syey Buyupwurar roy
siqvordde oq sefireyg amonnsexuy
Mas ‘sis woRosutia T YoIa Jo
Wo JOOG auo ye syey azour 10 Z Suraey
“wbs 00% weys axoOMT st ware r014 jf
‘or
“wbs 00z 240g st agrs joTd 1 saseo
We Ur aqeded sy saftey amonnsexu]
ou 10
Pardde 2q Tus oat zemaym aseo yone
ur “uibs 00g temp sso] 6} ware dn-qqinq
aq "whs OOg weEA azou sf ware 101d 3
i ‘(suonosuuco Suysrxo 30 Sujuado
“84 wo ydooxo (s)uonoouu0> mou qe
29) siqeked st safreyo ammonnseyuy
20014 of PUB pug, “wT TOF
WoRNAUTIOO MAT | 9 Wi) Je ONO QUUOD
Jajam Sunspa jo Suruadoos soy saydde
puv (wibs 00 < ear) faroys moy
wim Psjonnsuoces wy poysyoulsp st
Go 19) uonssmuos r;em auO ZuLey
Supnng Sunsme ‘uaddey ma 3eqm
} ‘paemopes Apayeredas aq jeys
pure aiqeded ATy sy vars uodo Jo %OT
Yo seBreyD amonnswyuy ‘axoyaroqy,
ware uado uo jou ware dn yfnq
Ho siderreae st yunoosrp %Sz_/ _%OG
gar wade uo sa8reyo amyongseyuy
‘WOT Surppe soyge 10 aroyaq paydde aq
21 $1 %SE 10 %OS JO yuNOOSIp ZO~aTLN
“mum /1009 Aza49 Jo vare dn mq 107
etqva8reyo st saBreyD amionyseyuy
gare dn mq punoss
20} £(wo 10 2004 Ateaa 0; payetnoteo 9q
OF 8} saBiwyD ommonseYM] soMayA] 1
| applicable for Basement/stilt. In case
of existence of any unit Domestic/
Commercial in Basement and Parking,
Infrastructure Charges will be levied |
j | according to build up area of such
| i units. |
2 _ i
| 15. | Water Demand and sewage quantities | Water demand and sewerage discharge |
| to be checked out by Planning Wing or quantity is to be calculated as per
| | Maintenance Divisions. existing guidelines of Planning
| | | Department by Maintenance Division,
| i : Only OBPS cases will be processed by
| Planning Wing,
Further, old cases where Infrastructure Charges have been paid will not be re-
opened,
This issues with the approval of Competent Authority for strict compliance of
implementation by all concerned,
y
(Akriti
Director (Revenue)
Copy for Information / necessary action to:
PS to Chairman, DJB for kind information,
Vice Chairman, DJB for kind information.
Secy, to CEO for kind information of CEO.
Members of the Board for kind information.
Member(A)/ Member(F)/ Member{W)/ Member(Dr.)
All Chief Engineers.
Director(F&A) /Director(A&P) /Secretary, DJB
Dy. Director(Vigilance)/Jt. Director(F&A)-I &l
All area Jt. Directors (Reventie)/ All Dy. Director (Revenue).
10. All SEs (Maintenance) / All EBs (W/S/R)
11. All ZROs are directed to take action accordingly.
12. AO(Revenue}HQ/ AAO(RevenuejHQ
13, EE(EDP): for uploading on DJB Website.
14. Project Director, M/s. Wipro Ltd., 6% Floor Varunalaya Building, Phase-II for
necessary modification in application software.
15. Guard file.