You are on page 1of 5

AUTHOR NAME

Street Name, Suite Number


City, State Zip Code
123.456.7890
you@email.com TPS
DENAH DENAH PONDASI
2.50 m

POT. A

2.50 m
2.50 m

BAK
LIMBAH
CAIR
BAK LIMBAH
POT B POT B
PADAT

AUTHOR NAME
2.50 m

PIPA SALURAN PEMBUANGAN

DETAIL PONDASI

0.15 m

PAS HEBEL FINISH PLESTER ACI

VALET

0.20 m
LANTAI PLESTERAN

POT. A

TANAH URUG
0.60 m
PONDASI BATU KALI

0.65 m 1.20 m 0.65 m


0.50 m

May 22, 2023 Project Location TPS A 01


TAMPAK KANAN TAMPAK DEPAN

KANAL C
RENG

SPANDEK

AUTHOR NAME
3.00 m
2.75 m

2.75 m
2.50 m 2.50 m

May 22, 2023 Project Location TPS A 02


POTONGAN B
POTONGAN A

AUTHOR NAME
BAK
BAK LIMBAH PADAT LIMBAH
CAIR
BAK LIMBAH
BAK LIMBAH PADAT
CAIR

VALET

LANTAI PLESTER

PIPA
PEMBUANGAN
PIPA
PEMBUANGAN

May 22, 2023 Project Location TPS A 03


RANGKA ATAP

KANAL C

RENG KANAL C

RENG

AUTHOR NAME
SPANDEK
5
3.00 m

0.48 m

0.82 m

3.00 m

May 22, 2023 Project Location TPS A 04

You might also like