Report R3MMP B1 SMO Upload
Report R3MMP B1 SMO Upload
Agustus 2015
SMO BLOCK B1
Remain Reserve
SMO BLOCK B1
SPO
NO DESCRIPTION Sep-15 Oct-15 Nov-15 TOTAL
1 Calendar Day 30 31 30 122
2 Holiday Day 1.5 0 0 3
3 Available Day 29 31 30 119
4 Hour per day 720 744 720 2928
5 Available Hour 24.00 684 744 720 2856
6 Standby hour per day 7.19 197 224 218 856
S1 Rain/Smog/Fog 1.46 39 45 45 174
S2 Slippery 0.82 17 27 27 98
S3 Flood - - - - -
S4 Dust - - - - -
S5 Rest & meal 1.54 45 47 46 183
S6 Daily shift change 1.86 53 58 56 221
S7 Weekly Over Shift - - - - -
S8 Holiday 0.14 4 5 4 17
S9 No Operator - - - - -
S10 Operator Absen (Sakit, ijin, alpha) - - - - -
S11 No loader/No Hauler 0.53 16 16 16 63
S12 Hopper/Crusher shutdown - - - - -
S13 Stoppage - - - - -
S14 Front, Road, Disposal Maintenance - - - - -
S15 Wait for Blasting 0.53 15 16 16 64
S16 P5M, Safety Talk 0.15 4 5 5 18
S17 Production Re-schedulling - - - - -
S18 Pit, Front, Disposal Movement - - - - -
S19 Pre Use Check, Greasing, Refueling, Washing 0.15 4 5 5 18
S20 No Order, No Material (OB & Coal), No Area - - - - -
7 Breakdown Hour per day 3.12 89 97 94 371
8 Schedule Hour 13.69 487 520 502 1,629
SMO BLOCK B1
Production Detail
2015
Land Clearing Sept Oct Nov
(Ha) (Ha) (Ha)
Blok B1
-Pit C2 - - -
-IPD C - - -
-OPD B14 - - -
2015
Soil Removal Sept Oct Nov
BCM BCM BCM
Blok B1
OPD B14 & OPD OPD B14 & OPD OPD B14 & OPD
Lokasi Penimbunan
B3 B4 B5
• Proses land compensation untuk area radius blasting di Enau harus sudah selesai pada awal tahun 2015 untuk menghindari
terjadinya issue masalah blasting dan menghindari turunnya productivity unit karena ketidaktersediaan material blasting.
(aktual blasting maks 50 hole)
• Performa slurry pump tidak maksimal pada pit G1 sehingga mengharuskan adanya manual handling, impactnya ada
kenaikan SR karena perhitungan material blending 1:1.5
• Start Pumping di Sed Pond WMP 29 ( Slurry pump ) dan kontinyu pembentukan WMP 33
PT. SIS - Pit C2
PT. SIS - Pit C2