0% found this document useful (0 votes)
43 views1 page

Alcoa Birmingham V-Tex Scrubber Project

This project details were for a scrubber system delivered to Alcoa's site in Birmingham in 2010. The scrubber system included a V-Tex scrubber and plume suppression equipment to treat a gas flowrate of 14,400m3/hr. The client was Alcoa and the site was located in Birmingham, United Kingdom.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Alcoa Birmingham V-Tex Scrubber Project

This project details were for a scrubber system delivered to Alcoa's site in Birmingham in 2010. The scrubber system included a V-Tex scrubber and plume suppression equipment to treat a gas flowrate of 14,400m3/hr. The client was Alcoa and the site was located in Birmingham, United Kingdom.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

PROJECT

PROJECT
DETAILS
Client:
Alcoa

Site:
Birmingham

Equipment:
V-Tex scrubber and
plume suppression

Gas flowrate:
14,400m3/hr

Year delivered:
2010

www.ergapc.co.uk

You might also like