This project details were for a scrubber system delivered to Alcoa's site in Birmingham in 2010. The scrubber system included a V-Tex scrubber and plume suppression equipment to treat a gas flowrate of 14,400m3/hr. The client was Alcoa and the site was located in Birmingham, United Kingdom.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
43 views1 page
Alcoa Birmingham V-Tex Scrubber Project
This project details were for a scrubber system delivered to Alcoa's site in Birmingham in 2010. The scrubber system included a V-Tex scrubber and plume suppression equipment to treat a gas flowrate of 14,400m3/hr. The client was Alcoa and the site was located in Birmingham, United Kingdom.