PROJECT GENERAL AND DEMOLITION NOTES

THE FOLLOWING PROJECT GENERAL NOTES SHALL APPLY TO THESE DRAWINGS:


1. THE WORK IS NEW UNLESS OTHERWISE INDICATED.
2. THE CONTRACTOR SHALL PERFORM WORK IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES AND REGULATIONS OF

LEGEND
AUTHORITIES HAVING JURISDICTION.
3. THE CONTRACTOR SHALL CONDUCT A COMPREHENSIVE FIELD SURVEY TO VERIFY EXISTING CONDITIONS. THE PURPOSE OF THE
SURVEY IS TO INTIMATELY FAMILIARIZE THE CONTRACTOR WITH THE SYSTEMS AND THE CONDITIONS OF THE WORK. THE SURVEY
SHALL BE CONDUCTED IN SUFFICIENT DETAIL TO ENSURE THAT DISCREPANCIES BETWEEN ACTUAL CONDITIONS AND THE DRAWINGS
ARE IDENTIFIED AND OTHER CONDITIONS AFFECTING THE TERMS OF THIS CONTRACT ARE ALSO IDENTIFIED.
4. FOR ARCHITECTURAL CONFIGURATION OF THE WORK AREA AND MATERIAL COMPOSITION OF THE WALLS, CEILING, FLOORS,
ROOF AND OTHER COMPONENTS, SEE ARCHITECTURAL

DRAWINGS.
Demolition, Repair

N.I.C. or Replace
5. HVAC, PLUMBING, ELECTRICAL AND OTHER ITEMS SHOWN ON THE ARCHITECTURAL INTENT ONLY. THE CONTRACTOR SHALL
CONSULT THE APPROPRIATE MECHANICAL, PLUMBING, ELECTRICAL, ETC.
6. DRAWING/PERSONNEL FOR THE COMPLETE AND DETAILED WORK REQUIRED.
7. NEW EQUIPMENT SHIPPED TO SITE SHALL BE PROTECTED FROM DUST AND DAMAGE. COVER WITH POLYETHYLENE PLASTIC
SHEETS AND TAPE CLOSED.
8. VENTILATE WORK AREA DURING PERIODS OF WORK.
LOW LEVEL
9. PROVIDE OPENINGS IN WALLS AND FLOOR SLABS REQUIRED TO ACCOMMODATE DUCTS PIPES, CONDUITS AND ACCESSORIES,
WHERE APPLICABLE.
10. WHERE ITEMS ARE INDICATED FOR REMOVAL, REMOVE ENTIRE SYSTEM AND RELATED CONSTRUCTION, ACCESSORIES AND
RESIDUE. THOROUGHLY CLEAN, REPAIR, INFILL AND PREPARE SUBSTRATES TO RECEIVE NEW FINISH OR SYSTEM AS SPECIFIED AND IN

ACCORDANCE WITH MANUFACTURER'S PRINTED INSTRUCTIONS.


11. EXISTING FLOOR-CEILING PENETRATIONS OPENED DURING CONSTRUCTION SHALL BE PLUGGED WATERTIGHT TO PREVENT
FLOODING OF THE FLOORS BELOW.
12. WHERE CUTTING OF SURFACES OR REMOVAL OF FINISHES IS REQUIRED TO PERFORM THE

WORK, FILL RESULTING OPENINGS, PATCH THE SURFACES AND FINISH TO MATCH ADJACENT SURFACES.
13. THE CONTRACTOR SHALL REPAIR OR REPLACE DAMAGE TO EXISTING CONDITIONS CAUSED BY CONTRACTOR'S ACTIONS.
REPAIR OR REPLACEMENT OF DAMAGED CONDITIONS SHALL MATCH THE INTEGRITY OF THE ADJACENT AREA OR SURFACE.
14. THE WORK AREA SHALL BE CLEANED AND DEBRIS REMOVED IN SEALED COVERED CONTAINERS OR POLYETHYLENE BAGS EACH
DAY. FINES ASSESSED AGAINST THE OWNER FOR THE EXCESSIVE ACCUMULATION OF DEBRIS SHALL BE PAID FOR THE CONTRACTOR.
15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL CLEAN UP AND TOUCH-UP PAINT WORK.
16. REMAINING SUBSTRATES FROM WHICH EXISTING FINISHES ARE REMOVED SHALL BE MADE SUITABLE FOR APPLICATION OF NEW
FINISH. DAMAGED SURFACES SHALL BE REPAIRED TO RECEIVE NEW FINISHES
17. PIPES AND CONDUITS SHALL BE CONCEALED IN CEILING AND WALL SPACES, UNLESS NOTED OTHERWISE.
18. SPACE BETWEEN THE UNDERSIDE OF BEAMS AND CEILING IS LIMITED. COORDINATE DUCTWORK, CEILING DIFFUSERS AND
REGISTERS WITH OTHER TRADES TO PREVENT CONFLICT AMONG TRADES AND THE UNNECESSARY WASTE OF USABLE SPACE.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING THE PROPERTY AND MATERIALS AT THE END OF EACH WORK DAY.
20. FLAMMABLE MATERIALS SUCH AS GASOLINE SHALL NOT BE STORED ON PROPERTY.
21. THE CONTRACTOR SHALL OBTAIN AND DISPLAY ON EXTERIOR OF PROPERTY, ALL REQUIRED PERMITS PRIOR TO THE
COMMENCEMENT OF THE WORK.
22. PERMIT SHALL REMAIN CURRENT AND BE DISPLAYED FOR THE ENTIRE DURATION OF THE PROJECT. FINES ASSESSED OR LIENS
PLACED UPON THE PROPERTY BY THE CITY DUE TO EXPIRE ON UN-DISPLAYED PERMITS SHALL BE PAID BY THE CONTRACTOR. ALL
DISPLAYED PERMITS SHALL BE AFFIXED TO THE BUILDING IN A CLEAR PLASTIC ENVELOPE.
23. HAZARDOUS MATERIALS SUCH AS ASBESTOS SHALL BE REMOVED IN ACCORDANCE WITH

APPLICABLE CODES, ORDINANCES AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION.


24. THE CONTRACTOR SHALL PROTECT THE WORK AT ALL TIMES AND SHALL TAKE REASONABLE PRECAUTIONS SUCH AS COVERING
AND TAPING WINDOW OPENINGS WITH POLYETHYLENE PLASTIC OR TEMPORARILY CLOSING ROOF OPENINGS TO PREVENT WATER
DAMAGE FORM RAIN THE COST OF REPAIRS TO EXISTING OR NEW WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
25. THE WORK CONSISTS OF FURNISHING OF ALL LABOR. MATERIAL, EQUIPMENT, SERVICE,

SUPERVISING ON AND PERFORMING ALL WORK CALLED FOR IN THE COMPLETION OF THE REHABILITATION OF INCLUDING SITE
IMPROVEMENTS AS SET FORTH IN THE ARCHITECTURAL, STRUCTURAL, HEATING, VENTILATION, AIR CONDITIONING, PLUMBING AND Note: Drywall will be repaired
ELECTRICAL AND
THE ACCOMPANYING WARRANTY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR READING THE ABOVE DRAWINGS AND THE or replaced throughout the
SPECIFICATIONS BOOK AS BEING INTEGRATED DOCUMENTS.
26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LICENSED TRADE PERMITS AND SCHEDULING ALL INSPECTIONS home along with windows,
INCLUDING FINIAL OCCUPANCY AS REQUIRED BY THE DISTRICT OF COLUMBIA CONSUMER AND REGULATORY AFFAIRS, PEPCO,
WASHINGTON GAS COMPANY, AT&T AND OTHER AFFECTED UTILITY COMPANY.
27. ALL CHARGES, CONTRIBUTIONS, COSTS AND OTHER MEANS OF REIMBURSEMENT ASSOCIATED WITH THE INSULATION AND
SERVICE BY LOCAL AUTHORITIES AND UTILITY COMPANIES SHALL BE INCLUDED IN THE CONTRACTOR'S BASE BID AND FINAL
FIRST FLOOR bathrooms, closets and
cabinets

N.I.C.
CONTRACT PRICE. THE CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR THE COST OF ALL UTILITIES USED IN THE

PERFORMANCE OF THE WORK.


28. THE CONTRACTOR SHALL FURNISH TO THE OWNER ALL WARRANTIES AND BONDS OF AFFIDAVIT FROM SUPPLIERS AND
MANUFACTURERS ON THE NEW, ALL MECHANICAL

EQUIPMENT, APPLIANCES AND OTHER ITEMS AS MAY BE REQUESTED IN THE BODY OF


SPECIFICATIONS. THE CONTRACTOR SHALL ALSO FURNISH TO THE OWNER A 3-RING LOOSE LEAF NOTEBOOK OF ALL OPERATING AND
MAINTENANCE MANUALS OF ANY AND ALL
EQUIPMENT PROVIDED AND INSTALLED UNDER THE CONTRACT.
29. ITEMS TO BE SALVAGED FOR RE-USE SHALL SHALL BE STORED IN A SAFE AND SECURE LOCATION AS DIRECTED THE
CONTRACTING OFFICER UNTIL REINSTALLATION.
30. PROTECT FROM DAMAGE ALL EXISTING SURFACES AND FINISHES TO REMAIN. CAREFULLY PERFORM DEMOLITION OPERATIONS
SO AS NOT TO DAMAGE ADJACENT SURFACES TO REMAIN.
31. REMOVE ALL INTERIOR PARTITIONS AND INTERIOR DOORS AS INDICATED ON ARCHITECTURAL PLANS.
32. REMOVE ALL EQUIPMENT AND MACHINERY INCLUDING APPURTENANCES, STUDS, HANGERS AND FASTENERS LOCATED IN
CEILINGS, WALL, AND FLOORS THAT IS LOCATED IN THE

AFFECTED AREA.
33. EXISTING DRAWINGS ARE FOR GENERAL REFERENCE AND MAY NOT ALWAYS NECESSARILY REPRESENT EXISTING CONDITIONS
ACCURATELY.
34. THESE NOTES ARE GENERAL IN NATURE AND APPLY TO THE ENTIRE BUILDING WHETHER OR NOT SPECIFICALLY NOTED OR
REFERENCED ON EACH FLOOR. THE DRAWINGS INDICATED

ONLY THE GENERAL EXTENT OF DEMOLITION WORK AND MAY NOT INCLUDE ALL DEMOLITION WHICH WILL BE REQUIRED FOR NEW
CONSTRUCTION. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO STARTING THE WORK. CONTRACTOR'S PRE-BID SITE VISIT SHALL
VERIFY ALL
EXISTING CONDITIONS AND SHALL BE RESPONSIBLE FOR THE INCLUSION OF ALL REQUIRED DEMOLITION IN AREAS UNDERGOING
MODIFICATION WHETHER SUCH WORK IS OR IS NOT
INDICATED ON THE DRAWINGS. REFER TO ALL DRAWINGS AND SPECIFICATION TO DETERMINE THE FULL EXTENT OF ITEMS TO BE
DEMOLISHED, REMOVED AND SALVAGED FOR RE-USE. DEMOLITION SHALL GENERALLY BE ARRANGED TO AGREE WITH THE
ACCOMPLISHMENT OF
WORK UNDER THE VARIOUS PHASES AND IN COORDINATION WITH THE WORK OF OTHER
TRADES. CONTRACTOR SHALL EXAMINE ALL DRAWINGS FOR ADDITIONAL REQUIREMENTS.
35. ALL WORK SHALL BE DONE IN A LEGAL MANNER. THE CONTRACTOR SHALL ABIDE BY ALL
Kvar
APPLICABLE CODES, REGULATIONS AND LAWS OF THE DISTRICT OF COLUMBIA CONSUMER AND REGULATOR AFFAIRS WHEN THE
DRAWINGS OR SPECIFICATIONS OMIT AN Y
PARTICULARS AREA GOVERNED BY CODES, THOSE CODES SHALL BE USED AS BEING THE MINIMUM IN CASE WHERE THE DRAWINGS
OR SPECIFICATIONS INDICATE LESSER REQUIREMENTS.
36. DIMENSIONS SHOWN IN NOMINAL SIZES ARE FOR THE PURPOSE OF DESCRIBING THE CONSTRUCTION AND ARE NOT TO BE 1.3031
TAKEN AS THE ACTUAL SIZE OF THE COMPONENT.
37. DEMOLITION SHALL GENERALLY BE ARRANGED TO AGREE WITH THE ACCOMPLISHMENT OF 3.0050

W/D
15'5'' 2.4040
THE WORK AND COORDINATED WITH THE WORK OF THE OTHER TRADES. CONTRACTOR SHALL EXAMINE ALL DRAWINGS FOR
ADDITIONAL REQUIREMENTS.
38. CONTRACTOR SHALL BE PATCH ALL HOLES IN WALLS, FLOORS, AND CEILINGS AND REPAIR OR REPLACE ALL EXISTING ITEMS
DAMAGED BY THE WORK WHETHER OR NOT SPECIFICALLY NOTED ON THE DRAWINGS T TO BE REPAIRED IN THE AREAS AFFECTED BY
THE WORK.
39. CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING THE PLUMBING, MECHANICAL, AND ELECTRICAL SYSTEMS FULLY
OPERATIONAL PROVIDE ADDITIONAL LIGHTING FIXTURES,
29.4489

ELECTRICAL OUTLETS AND SWITCHES, AND PLUMBING AS SHOWN ON THE DRAWINGS OR AS IN 18.4306
NECESSARY TO PROVIDE A COMPLETE INSTALLATION FOR THE INTENDED OCCUPAN

BASEMENT
9.0150
3.0050

PROYECT NUMBER 00

DATE: 07 MAY 2023

4.4687
A001
LOW LEVEL N.I.C.

FIRST FLOOR
N.I.C.

Kvar

1.3031

3.0050

2.4040

29.4489
18.4306

BASEMENT Proposed
3.0050
9.0150
architectural
plans
PROYECT NUMBER 00

DATE: 07 MAY 2023

4.4687
A002
LOW LEVEL N.I.C.
LEGEND

RECESSED LIGHTING
s HARDWIRE
SMOKE/CARBON
DIOXIDE WITH
BATTERY BACKUP AND
FIRST FLOOR
UNTERCONNECTED
BATHROOM FAN/LIGHT
N.I.C.
S SWITCH

SS 2-WAY SWITCH
GFI
RECEPTICAL
S

J UNCTION BOX Kvar J


s
1.3031

S
3.0050

2.4040
S

BASEMENT

S
s s
29.4489
18.4306

ELECTRICAL PLANS
9.0150
3.0050

S SS
S
S

PROYECT NUMBER 00
J
DATE: 07 MAY 2023
J SS

E001
ELECTRICAL NOTES

ELECTRICAL NOTES ELECTRICAL RISER DIAGRAM


A:
A:
GENERAL NOTES
1. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
2. CIRCUIT NUMBERS SHOWN ARE FOR IDENTIFICATION ONLY. IT SHALL BE LEGEND
THE CONTRACTORS RESPONSIBILITY TO BALANCE ALL PHASES IN THE PANEL
BOARD. ( BALANCE LOAD).
3. SEE MECHANICAL PLANS FOR EXACT LOCATIONS OFF ALL MOTORS AND
240 V
OTHER EQUIPMENT BEFORE ROUGH-IN.
4. WHERE WIRE SIZES ARE INDICATED ON PLANS FOR INDIVIDUAL CIRCUITS,
RECESSED LIGHTING M #1 CU 1 PH 3W
THE INDICATED WIRE SIZE SHALL APPLY TO THE COMPLETE CIRCUIT UNLESS
PANEL L1
OTHERWISE NOTED.
5. THE CONTRACTOR SHALL VERIFY ALL EQUIPMENT NOT FURNISHED UNDER
THE SECTION BEFORE ROUGH-IN.
6. SEE ARCHITECTURAL PLANS FOR EXACT LOCATION OF BUILDING
s HARDWIRE 200 A
METER L1
EQUIPMENT BEFORE ROUGH-IN.
7. CONDUIT AND/OR CABLE RUNS ARE SHOWN SCHEMATICALLY. BUILDING
SMOKE/CARBON 240 V

CONDITION WILL DETERMINE ACTUAL RUNS.


8. MODULAR METERING EQUIPMENT WHEN USED IN CONJUNCTION WITH
STANDARD 10K CIRCUIT BREAKER IN BUILDING LOAD CENTERS. SHALL BE SERIES
DIOXIDE WITH
RATED FOR MINIMUM 22K RMS SYMMETRICAL AMPERES.
9. ALL JUNCTION BOXES SHALL BE OF CODED GAUGE AND OF THE SIZE BATTERY BACKUP AND
REQUIRED TO ACCOMMODATE CONSTRUCTION SHOWN.
10. THE CONTRACTOR SHALL VERIFY LOCATION OF ALL EQUIPMENT
REQUIRING ELECTRICAL CONNECTION BEFORE ROUGH-IN. UNTERCONNECTED
11. THE CONTRACTOR SHALL VERIFY WITH THE MANUFACTURER THE EXACT
LOCATION OF CONNECTION BOX TO MECHANICAL EQUIPMENT BEFORE
ROUGH-IN. BATHROOM FAN/LIGHT
12. THE CONTRACTOR SHALL EXTEND WIRING FROM THE JUNCTION BOX,
RECEPTACLES, ETC., AND MAKE FINAL CONNECTION TO ALL BUILDING
ELECTRICAL CONNECTIONS.
S SWITCH
13. ALL WORKMANSHIP, MATERIALS AND EQUIPMENT SHALL BE GUARANTEED
FOR PERIOD OF ONE YEAR AFTER THE ACCEPTANCE OF CONSTRUCTION BY THE
OWNER. SS 2-WAY SWITCH Copper encased electrode
14. LOAD CENTER SHALL BE THE CIRCUIT BREAKER TYPE AS MANUFACTURED
SQUARED CO., CUTTLER HAMMER OR EQUAL.
GFI
to grounding bars
15. THE CONTRACTOR SHALL VISIT EXISTING SITE AND DETERMINE WHICH
MATERIALS EFFECTS HIS BID. to cu water pipe
16. THE CONTRACTOR SHALL RESTORE ALL SYSTEMS AND AREAS DISTURBED
BY HIS WORK TO THE SATISFACTION OF THE OWNER AND THE DEVELOPER.
RECEPTICAL
17. THE CONTRACTOR SHALL OBTAIN ALL PERMITS AND CERTIFICATIONS OF
INSPECTIONS INCLUDING THE COST OF SAME IN HIS CONTRACT.
18. ALL NEW MATERIALS FURNISHED FOR THIS PROJECT SHALL BE LISTED BY
J UNCTION BOX
THE UNDERWRITER'S LAVATORIES, INC.
19. ALL PHOTOCELLS SHALL BE WEATHERPROOFED, SURFACED MOUNTED
WITH CORROSION PROOF PALTE AND SHALL BE MANUFACTURED BY TORK OR
SIMILAR.
20. THE CONTRACTOR MUST ASSURE EQUIPMENT GROUNDING SYSTEM
CONTINUITY.
21. THERMOSTAT WIRING SHALL BE AS PER DIAGRAM BY UNIT
MANUFACTURER, SEE MECHANICAL PLANS FOR EXACT LOCATION.
22. ALL ELECTRICAL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE
NATIONAL ELECTRICAL CODE, AND OTHER RULES AND REGULATIONS OF THE
LOCAL ELECTRICAL AND BUILDING CODES.
23. ALL WIRING SHALL BE "BX' WITH COPPER GROUND.
24. OUTLETS MOUNTED ON COMMON WALL SHALL NOT BE MOUNTED BACK TO
BACK. THEY SHALL BE STAGGERED TO PREVENT SOUND TRANSMISSION.
25. NUMBER AND SIZE OF CONNECTORS, CONDUIT, CONTROL PANEL AND
ANNUNCIATOR FOR FIRE ALARM PANEL SHALL BE RECOMMENDED BY
MANUFACTURER TO PERFORM WORK AS REQUIRED BY LOCAL AUTHORITY
HAVING JURISDICTION.
26. UNIT SHALL BE PRE-WIRED WITH A MINIMUM OF 2 PAIR OF 24 AWG
TELEPHONE CABLES

BY C & P TELEPHONE COMPANY.


27. THE CONTRACTOR SHALL COORDINATE DOOR ENTRY SYSTEM
REQUIREMENTS WITH OWNER PRIOR ROUGH-IN AND PROVIDE ALL NECESSARY
COMPONENTS TO ENSURE THAT A COMPLETE OPERATING SYSTEM IS PROVIDED.
28. BRANCH CIRCUIT CONNECTORS SHALL BE MINIMUM NO. 12 AWG,
HOME-RUNS SHALL BE NO. 10 AWG = TW INSULATION +/- LARGER = THW
INSULATION +/- OUTSIDE OR UNDERGROUND FEEDERS = THWN INSULATION.
29. AFCI OUTLETS IN ALL HABITABLE ROOMS. ELECTRICAL PLANS
30. CARBON MONOXIDE ALARMS ARE REQUIRED FOR DWELLING UNIT WHERE
FUEL FIRED APPLIANCES ARE INSTALLED. [2013 DCBC 908.7]
31. BATHROOMS REQUIRE ONE DEDICATED 20 AMPERE CIRCUIT FOR THE
OUTLETS TO LIGHTING, RECEPTACLES IN EACH BATHROOM [2013 DCEC 210.11 9
(C)(3)]
32. THE WATER HEATER MUST HAVE A CODED COMPLIANT DISCONNECTING PROYECT NUMBER 00
MEANS UNLESS IT IS FUEL=FIRED. [2013 DCEC 422.30 & 422.31 (B)]

DATE: MAY

E002
MECANICAL NOTES
1. FURNISH ALL LABOR MATERIALS FIXTURES EQUIPMENT AND SERVICES NECESSARY FOR THE INSTALLATION OF COMPLETE
AND POPERY FUNCTIONING HVAC SYSTEM, PLUMBING SYSTEM AND ELECTRICAL SYSTEM.

2. ALL WORK SHALL BE IN ACCORDANCE WITH LOCAL CODES AND REGULATIONS CONSIDERED AS MINIMUM REQUIREMENTS.

3. CONTRACTOR TO APPLY FOR AND PAY FOR ALL PERMITS AND CONNECTION FEES REQUIRED FOR THE WORK.

4. THE CONTRACTOR SHALL FAMILIARIZE HIMSELF WITH THE WORK TO BE DONE AND SHALL EXAMINE THE SITE AND
CONSIDER THE CONDITIONS UNDER WHICH HE WILL BE OBLIGED TO

OPERATE IN THE PERFORMANCE OF THE CONTRACTED WORK. NO ALLOWANCES SHALL BE


MADE SUBSEQUENTLY IN THIS CONNECTION FOR ANY ERRORS THROUGH NEGLIGENCE ON
HIS PART. THE CONTRACTOR IS HERE BY ADVISED THAT HE WILL BE REQUIRED TO
OBSERVE ALL RECOMMENDED PRACTICES FOR FIRE AND SAFETY PRECAUTIONS FOR THE PROTECTION OF THE FACILITY. THE

N.I.C.
CONTRACTOR SHALL VERIFY ALL DIMENSIONS,
LOCATIONS AND CLEARANCES AND COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO STARTING OF WORK.
5. FOR OTHER DETAILS, THE ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING AND

ELECTRICAL PLANS AND EXISTING CONSTRUCTION SHALL BE FOLLOWED AND ALL WORK LOW LEVEL
PERFORMED UNDER THIS SPECIFICATION SHALL BE NEATLY FITTED THERETO.
6. ALL DUCTWORK SHALL BE FABRICATED FROM FIELD TAKEN DIMENSIONS AND NOT FROM DRAWINGS. PRIOR TO DUCT
FABRICATION CEILING CLEARANCE SHALL BE VERIFIED WITH

ALL ELECTRICAL, PLUMBING AND ARCHITECTURAL MATERIALS.


7. SUBMIT SIX COPIES OF EACH SHOP DRAWINGS FOR THE FOLLOWING: HIGH EFFICIENCY FURNACE, SPLIT SYSTEM COOLING
COILS, AIR COOLED CONDENSING UNIT, THERMOSTATS,

GRILLES, REGISTERS. DUCTS, TRIMS PIPES, JOINING METHODS, WATER HEATER. BUY GRAY UNIT. FLOOR DRAINS, BREAKER
PANEL, CIRCUIT BREAKERS, SWITCHES LUMINARIES, MOTION DETECTORS. DISCONNECT SWITCHES AND OUTLETS.
8. ELECTRICAL CONTRACTOR SHALL FURNISH ALL MOTOR CONTROLLERS PILOT OTHER DEVICES AND SHALL DO ALL WIRING
REQUIRED EXCEPT A.T.C. WIRING.

9. DUCTWORK SHALL BE SHEET METAL GALVANIZED CONSTRUCTED BRACED AND

SUPPORTED IN ACCORDANCE WITH SMACNA LOW PRESSURE GUIDES UNLESS OTHERWISE NOTED IN THE DRAWINGS. SEAL ALL
JOINTS TO BE AIR TIGHT USING HARDCAST AM-401
TAPE APPLIED OVER CLEAN DRY DUCT.
10. ALL SUPPLY AND RETURN DUCTS IN UNCONDITIONED SPACES SHALL BE INSULATED WITH 1/2" FIBERGLASS INSULATION
WITH ASI VAPOR BARRIER.

11. GRILLES, REGISTERS AND DIFFUSERS SHALL BE OF CAPACITIES INDICATED SIZED IN ACCORDANCE WITH MANUFACTURES
PRINTED LITERATURE FOR RESIDENTIAL SOUND LEVELS AND THROWS. MOUNT TIGHT TO CONSTRUCTION USING NEOPRENE
GASKET TO PREVENT AIR LEAKAGE AND STREAKING. BRANCHES FROM MAIN TO OUTLETS SHALL BE

MADE USING ADJUSTABLE DEFLECTORS POSITIONED AND SECURED TO PROVIDE SPECIFIED AIR QUANTITIES. REGISTERS AND
GRILLES SHALL BE MDF BY LIMA OR APPROVED EQUAL
AND SHALL MATCH COLOR OF ADJACENT CEILING OR WALL, COORDINATE LOCATION OF CEILING REGISTER WITH LIGHT.
12. CUTTING OF FLOORS, WALLS, AND CEILINGS REQUIRED FOR INSTALLATION OF PIPES, CONDUITS, DUCTS, WIRING,
SLEEVES AND SEALS OF THEM SHALL BE DIRECTED BY THE
ARCHITECT AND STRUCTURAL ENGINEERS.
13. ALL SYSTEMS SHALL BE ADJUSTED AND BALANCED WITH AIR QUALITIES NOTED OR AS DIRECTED. TOLERANCE SHALL BE
FORM MINUS 5 PERCENT TO PLUS 25 PERCENT.
14. ALL EQUIPMENT SHALL BE CLEANED AND ADJUSTED AS REQUIRED TO PROVIDE SATISFACTORY OPERATION.
15, ASSEMBLE PRINTED INSTRUCTION FOR THE OPERATION AND MAINTENANCE OF EACH MAJOR ITEM. BIND TOGETHER WITH
EQUIPMENT CUT SHEETS AND CONTROL WIRING DIAGRAMS. DELIVER THREE COPIES TO ARCHITECT.
16. FINAL INSPECTION AND TEST SHALL BE MADE BY THE CONTRACTOR IN THE PRESENCE OF ARCHITECT. THE CONTRACTOR

N.I.C.
SHALL SUPPLY ALL LABOR, MATERIALS INSTRUMENTS

AND MISCELLANEOUS EQUIPMENT REQUIRED FOR THE TESTS. FINAL PAYMENT SHALL HELD PENDING SATISFACTORY OUTCOME
OF THE FINAL INSPECTION. PROVIDE ALL INSPECTION REPORTS AND APPROVALS BY UTILITIES . GOVERNMENT OR AUTHORITIES
AS REQUIRED,
INCLUDING OCCUPANCY PERMIT.
17. PROVIDE TURNING VANES, SPLITTER DAMPERS AND VOLUME DAMPERS AS NECESSARY TO BALANCE WITH AIR QUALITIES
AS SHOWN ON DRAWINGS BY INDEPENDENT BALANCING COMPANY OR PROFESSIONAL ENGINEER.

18. DUCTS THAT PENETRATE CEILING MEMBRANE WILL COMPLY WITH IBC 2012 717.6.2. FIRST FLOOR
19. PROTECT HVAC PIPING INSULATION PER IECC 403.3.1

20. ALL MECHANICAL VENT SYSTEM FANS NOT PART OF TESTED AND LISTED HVAC EQUIPMENT SHALL MEET EFFICIENCY AND
AIR FLOW REQUIREMENT

MECHANICAL SIMBOLS
Kvar
SUPPLY DUCT
RETURN DUCT 3.0050
1.3031

CR CEILING REGISTER 2.4040

FL FLOOR REGISTER
EXHAUST FAN 29.4489
18.4306

AFF ABOVE FINISHED FLOOR


HWR HIGHT WALL REGISTER 9.0150
3.0050
MECANICAL PLANS
LWR LOW HALL REGISTER
CFM
CUBIC FEET PER MIN
PROYECT NUMBER 00
BASEMENT
DATE: 07 MAY 2023
4.4687

M001