Project Title: “Construcción del Puente Carrozable Ivochote”
Designer: JLBP
Project Date: Monday, January 20, 2014
Notes:
Headwater Elevation (m) Total Discharge (cms) Culvert 1 Discharge (cms) Roadway Discharge (cms) Iterations
1
Site Data - Culvert 1
Site Data Option: Culvert Invert Data
Inlet Station: 0.00 m
Inlet Elevation: 506.55 m
Outlet Station: 14.80 m
Outlet Elevation: 506.10 m
Number of Barrels: 1
Flow (cms) Water Surface Elev (m) Depth (m) Velocity (m/s) Shear (Pa) Froude Number