You are on page 1of 24

KODE UNIT SERVIS RUTIN

Filter Solar
Filter Oli
Oli Mesin
Oli Swing

Oli Final Drive


HEXCAVATOR PC 330
(EX-007) KOBELCO Saringan Udara
Gomok/greas (30 liter)
water sparator
filter oli hidrolik

TOTAL
Filter Solar
Filter Oli
Oli Swing
Oli Mesin

HEXCAVATOR PC 200 Oli Final Drive


(EX-002) KOMATSU
Saringan Udara
Gomok/greas (30 liter)
water sparator
filter oli hidrolik

TOTAL
Filter Solar
Filter Oli
Oli Swing
Oli Mesin

Oli Final Drive


HEXCAVATOR PC 200
(EX-002) KOMATSU Saringan Udara
Gomok/greas (30 liter)
water sparator
filter oli hidrolik

TOTAL
Filter Solar
Filter Oli
Oli Mesin
Oli Gardan
Saringan Udara
WHEEL LOADER CAT
950 GC (LD- Gomok/greas (30 liter)
001)
WHEEL LOADER CAT
950 GC (LD-
001) water sparator

TOTAL
Fuel Filter
Oil Filter
Oli mesin
Saringan Udara

DOSSAN 625 Kva


(DS-001)

TOTAL

KARET KONVEYOR 4 PLY L.80CM X P.17M

Gomok/greas (360 liter)

CRUSHER SHANBAO
600 -900

TOTAL

TOTAL BIAYA
HARGA SPEARPART RUTIN WAKTU SERVIS RUTIN SERVIS ACCIDENTALLY

Rp 280,000 250 Hm (±1 Bulan) realy / Secring


Rp 190,000 250 Hm (±1 Bulan) Hose
Rp 800,000 250 Hm (±1 Bulan) Oring / Sel
Rp 1,130,000 250 Hm (±1 Bulan) Lampu

Rp 450,000 250 Hm (±1 Bulan) Kuku Bucket (5 pcs)

Rp 830,000 250 Hm (±1 Bulan) Pensil Breaker


Rp 600,000 1 bulan Bucket
Rp 970,000 250 Hm (±1 Bulan)
Rp 840,000 250 Hm (±1 Bulan)

Rp 6,090,000 TOTAL
Rp 230,000 250 Hm (±1 Bulan) realy / Secring
Rp 180,000 250 Hm (±1 Bulan) Hose
Rp 1,100,000 250 Hm (±1 Bulan) Oring / Sel
Rp 750,000 250 Hm (±1 Bulan) Lampu

Rp 400,000 250 Hm (±1 Bulan) Kuku Bucket (5 pcs)

Rp 800,000 250 Hm (±1 Bulan) Bucket


Rp 600,000 1 bulan
Rp 950,000 250 Hm (±1 Bulan)
Rp 800,000 250 Hm (±1 Bulan)

Rp 5,810,000 TOTAL
Rp 230,000 250 Hm (±1 Bulan) realy / Secring
Rp 180,000 250 Hm (±1 Bulan) Hose
Rp 1,100,000 250 Hm (±1 Bulan) Oring / Sel
Rp 750,000 250 Hm (±1 Bulan) Lampu

Rp 400,000 250 Hm (±1 Bulan) Kuku Bucket (5 pcs)

Rp 800,000 250 Hm (±1 Bulan) Bucket


Rp 600,000 1 bulan
Rp 950,000 250 Hm (±1 Bulan)
Rp 800,000 250 Hm (±1 Bulan)

Rp 5,810,000 TOTAL
Rp 187,300 250 Hm (±1 Bulan) Realy / Secring
Rp 180,000 250 Hm (±1 Bulan) Hose
Rp 750,000 250 Hm (±1 Bulan) Oring / Sel
Rp 400,000 250 Hm (±1 Bulan) Lampu
Rp 800,000 250 Hm (±1 Bulan) Ban 4 PCS
Rp 600,000 1 bulan Bucket
Rp 950,000 250 Hm (±1 Bulan) Pisau Cutting

Rp 2,917,300 TOTAL
Rp 208,711 250 Hm (±1 Bulan)
Rp 337,305 250 Hm (±1 Bulan)
Rp 700,000 250 Hm (±1 Bulan)
Rp 500,000 250 Hm (±1 Bulan)

Rp 1,746,016
KARET KONVEYOR 4PLY L.80CM X
Rp 14,880,000 1 tahun
P.6M

KARET KONVEYOR 4PLY L.80CM X


Rp 7,200,000 1 tahun P.18M

KARET KONVEYOR 4PLY L.60CM X


P.15M

KARET KONVEYOR 4PLY L.60CM X


P.7M

KARET KONVEYOR 4PLY L.50CM X


P.12M

KARET KONVEYOR 4PLY L.80CM X


P.15M

Rp 22,080,000 TOTAL

TOTAL BIAYA PENYUSUTAN & SERVIS RUTIN


ESTIMASI BIAYA STANDAR PRODUKSI

HARGA SPEARPART WAKTU SERVIS


HARGA UNIT
(ACCIDENTALLY) ACCIDENTALLY

Rp 300,000 1 tahun
Rp 850,000 1 tahun
Rp 450,000 1 tahun
Rp 270,000 1 tahun

Rp 1,300,000 1 tahun
Rp 1,400,000,000
Rp 13,000,000 1 tahun
Rp 27,000,000 1 tahun

Rp 43,170,000
Rp 250,000 1 tahun
Rp 800,000 1 tahun
Rp 400,000 1 tahun
Rp 250,000 1 tahun

Rp 1,250,000 1 tahun
Rp 1,250,000,000
Rp 26,000,000 1 tahun

Rp 28,950,000
Rp 250,000 1 tahun
Rp 800,000 1 tahun
Rp 400,000 1 tahun
Rp 250,000 1 tahun

Rp 1,250,000 1 tahun
Rp 1,250,000,000
Rp 26,000,000 1 tahun

Rp 28,950,000
Rp 250,000 1 tahun
Rp 800,000 1 tahun
Rp 400,000 1 tahun
Rp 250,000 1 tahun
Rp 11,000,000 1 tahun
Rp 32,000,000 1 tahun Rp 1,700,000,000
Rp 1,700,000,000
Rp 3,000,000 1 tahun

Rp 47,700,000

Rp 500,000,000

Rp 6,715,000 2 tahun

Rp 15,622,000 2 tahun

Rp 9,809,000 2 tahun

Rp 5,349,000 2 tahun

2 tahun
Rp 6,856,000

2 tahun Rp 2,500,000,000
Rp 13,396,000

Rp 57,747,000

RUTIN

Rp 8,600,000,000
DUKSI

PENYUSUTAN HARGA ALAT & SERVIS

TAHUN KE-1 TAHUN KE-2 TAHUN KE-3 TAHUN KE-4


Penyusutan Pertahun =
Rp 933,333,333 Rp 466,666,667 Rp -
Penyusutan Perbulan =
Penyusutan Perhari =

Penyusutan Perjam=

SERVIS
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
Total Penyusutan Alat dan Servis perjam =
Penyusutan Pertahun =

Penyusutan Perhari =

Penyusutan Perjam=

SERVIS
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
Total Penyusutan Alat dan Servis perjam =
Penyusutan Pertahun =
Rp 833,333,333 Rp 416,666,667 Rp -
Penyusutan Perbulan =
Penyusutan Perhari =

Penyusutan Perjam=

SERVIS
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
Total Penyusutan Alat dan Servis perjam =
Penyusutan Pertahun =
Rp 1,133,333,333 Rp 566,666,667 Rp -
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
SERVIS
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
Total Penyusutan Alat dan Servis perjam =
Penyusutan Pertahun =
Rp 333,333,333 Rp 166,666,667 Rp -
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=

SERVIS
Penyusutan Perbulan =
Penyusutan Perhari =
Penyusutan Perjam=
Total Penyusutan Alat dan Servis perjam =

Penyusutan Pertahun =

Rp 1,666,666,667 Rp 833,333,333 Rp -

Penyusutan Perbulan =

Penyusutan Perhari =

Penyusutan Perjam=

SERVIS

Penyusutan Perbulan =

Penyusutan Perhari =

Penyusutan Perjam=

Total Penyusutan Alat dan Servis perjam =


YUSUTAN HARGA ALAT & SERVIS

TAHUN KE-5 TAHUN KE-6 TAHUN KE-7 TAHUN KE-8


Rp 466,666,667

Rp 38,888,889
Rp 1,296,296

Rp 54,012

SERVIS
Rp 9,687,500
Rp 322,917
Rp 13,455
Rp 67,467
Rp 416,666,667

Rp -

Rp -

SERVIS
Rp 8,222,500
Rp 274,083
Rp 11,420
Rp 11,420
Rp 416,666,667

Rp 34,722,222
Rp 1,157,407

Rp 48,225

SERVIS
Rp 8,222,500
Rp 274,083
Rp 11,420
Rp 59,645
Rp 566,666,667

Rp 47,222,222
Rp 1,574,074
Rp 65,586
SERVIS
Rp 6,892,300
Rp 229,743
Rp 9,573
Rp 75,159
Rp 166,666,667

Rp 13,888,889
Rp 462,963
Rp 19,290

SERVIS
Rp 1,746,016
Rp 58,201
Rp 2,425
Rp 21,715

Rp 833,333,333

Rp 69,444,444

Rp 2,314,815

Rp 96,451

SERVIS

Rp 4,246,125

Rp 141,538

Rp 5,897

Rp 102,348

Rp337,755
BIAYA KARYAWAN PERJAM

NO NAMA JABATAN UPAH BULANAN

1 Yanuar Direktur Rp8,000,000


2 Andi Mulyono Pengawas Rp6,000,000
3 Bustang Administrasi Rp3,000,000
4 Andi arif Checker Rp3,000,000
5 Roy marten Oprt. Excavator Rp2,763,000
6 Budianto Oprt. Excavator Rp2,613,000
7 Harsadi Oprt. Excavator Rp2,613,000
8 A.Taufik Ibrahim Operator Loader Rp2,613,000
9 Fransiskus Doni Crew Crusher/Whelder Rp2,613,000
10 Igo saputra Oprt Crusher Rp3,000,000
11 Andi Crew Crusher Rp2,613,000
12 Riswan Crew Crusher Rp2,613,000
13 Suardi Rusli Crew Crusher Rp2,613,000
14 Ridwan Maintenance Rp2,613,000
15 Mahatir Abdullah Maintenance Rp2,613,000
TOTAL Rp49,280,000
TOTAL BIAYA PERJAM
TOTAL BIAYA BULANAN
RYAWAN PERJAM
BIAYA
UPAH HARIAN UPAH PERJAM MAKAN BIAYA
MAKAN/JAM
HARIAN
Rp266,667 Rp33,333 Rp30,000 Rp3,750
Rp200,000 Rp25,000 Rp15,000 Rp1,875
Rp100,000 Rp12,500 Rp15,000 Rp1,875
Rp100,000 Rp12,500 Rp15,000 Rp1,875
Rp92,100 Rp11,513 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp100,000 Rp12,500 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp87,100 Rp10,888 Rp15,000 Rp1,875
Rp1,642,667 Rp205,333 Rp240,000 Rp30,000
Rp235,333
Rp56,480,000
4 P001438 1 ROI

2 P001304 1 GOOD

4 P001512 1 ROI

6 P001512 2 ROI

8 P001441 2 ROI

9 P001304 2 GOOD

10 P001512 3 ROI

11 P001512 4 ROI

12 P001512 6 ROI

14 P002054 4 ROI

16 P001636 5 ROI

17 P001557 6 GOOD

21 P002219 10 ROI

30 P001634 1 ROI

1 P002071 1 GOOD

2 P002071 2 GOOD

3 P002071 3 GOOD

4 P002071 4 GOOD

5 P002071 5 GOOD

6 P002071 6 GOOD

7 P002071 7 GOOD

1 P002428 1 ROI

2 P001879 1 ROI

3 P001792 1 ROI

4 P001792 2 ROI

5 P002428 2 ROI

6 P001792 3 ROI

7 P002428 3 ROI

8 P002428 4 ROI

9 P001792 4 ROI
9 P001792 4 ROI

10 P001792 5 ROI

11 P001792 6 ROI

12 P001792 7 ROI

13 P001792 8 ROI

14 P001792 9 ROI

15 P001792 10 ROI

16 P001792 11 ROI

17 P001792 12 ROI

18 P001792 13 ROI

19 P002183 14 ROI

3 P002440 1 ROI

1 P002015 2 GOOD

1 P001356 4 GOOD

2 P001356 5 GOOD

3 P002416 ROI

29 P001926 1 GOOD

40 P002339 1 ROI

53 P001794 1 GOOD

67 P001460 1 ROI

170 P001403 2 ROI

275 P001663 4 GOOD

278 P001982 5 GOOD

10 P001977 1 SERV

11 P001812 1 SERV

12 P001461 1 ROI

13 P001654 1 SERV

14 P001977 2 SERV

15 P002229 2 SERV

10 P001477 1 ROI

11 P002097 1 ROI

17 P001477 2 ROI
17 P001477 2 ROI

18 P002097 2 ROI

30 P001600 3 ROI

31 P001615 4 ROI

37 P001477 4 ROI

47 P001477 6 ROI

17 P002165 3 ROI
Ahmad Eteng Sahido 7/6/2018 7/6/2018 7/6/2018

Ahmad Eteng Sahido 16/5/2018 16/5/2018 9/5/2018

Ahmad Eteng Sahido 3/7/2018 3/7/2018 2/7/2018

Ahmad Eteng Sahido 3/7/2018 3/7/2018 2/7/2018

I Komang Wiantara 8/6/2018 8/6/2018 6/6/2018

Ahmad Eteng Sahido 16/5/2018 16/5/2018 9/5/2018

Ahmad Eteng Sahido 3/7/2018 3/7/2018 2/7/2018

Ahmad Eteng Sahido 3/7/2018 3/7/2018 2/7/2018

Ahmad Eteng Sahido 3/7/2018 3/7/2018 2/7/2018

Ahmad Eteng Sahido 30/12/1899 22/9/2018 18/7/2018

Ahmad Eteng Sahido 23/7/2018 23/7/2018 18/7/2018

Mirdan 13/7/2018 12/7/2018 9/5/2018

Ahmad Eteng Sahido 12/10/2018 10/10/2018 3/10/2018

Ahmad Eteng Sahido 23/7/2018 23/7/2018 20/7/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

Mirdan 1/11/2018 25/9/2018 29/8/2018

M. Afif Mausili 8/11/2018 8/11/2018 6/11/2018

Ahmad Eteng Sahido 29/8/2018 29/8/2018 27/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

M. Afif Mausili 8/11/2018 8/11/2018 6/11/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

M. Afif Mausili 8/11/2018 8/11/2018 6/11/2018

M. Afif Mausili 8/11/2018 8/11/2018 6/11/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018


Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 21/8/2018 20/8/2018 16/8/2018

Ahmad Eteng Sahido 8/10/2018 8/10/2018 3/10/2018

M. Afif Mausili 12/11/2018 12/11/2018 6/11/2018

Ahmad Eteng Sahido 17/9/2018 17/9/2018 29/8/2018

Mirdan 22/5/2018 21/5/2018 9/5/2018

Mirdan 22/5/2018 21/5/2018 9/5/2018

M. Afif Mausili 7/11/2018 7/11/2018 26/10/2018

Ahmad Eteng Sahido 3/9/2018 3/9/2018 29/8/2018

Ahmad Eteng Sahido 23/10/2018 23/10/2018 19/10/2018

Mirdan 20/8/2018 20/8/2018 14/8/2018

Ahmad Eteng Sahido 9/6/2018 9/6/2018 8/6/2018

Ahmad Eteng Sahido 4/6/2018 4/6/2018 4/6/2018

Mirdan 31/7/2018 31/7/2018 19/7/2018

Mirdan 10/9/2018 10/9/2018 8/8/2018

Mirdan 8/9/2018 8/9/2018 29/8/2018

Ahmad Eteng Sahido 23/8/2018 23/8/2018 23/8/2018

Mirdan 9/6/2018 9/6/2018 9/6/2018

Ahmad Eteng Sahido 27/7/2018 27/7/2018 26/7/2018

Mirdan 8/9/2018 8/9/2018 29/8/2018

Ahmad Eteng Sahido 12/10/2018 12/10/2018 7/10/2018

Mirdan 26/6/2018 25/6/2018 7/6/2018

Ahmad Eteng Sahido 27/9/2018 27/9/2018 24/9/2018

Mirdan 26/6/2018 25/6/2018 7/6/2018


Mirdan 26/6/2018 25/6/2018 7/6/2018

Ahmad Eteng Sahido 27/9/2018 27/9/2018 24/9/2018

Ahmad Eteng Sahido 13/8/2018 17/7/2018 16/7/2018

Ahmad Eteng Sahido 23/7/2018 19/7/2018 18/7/2018

Mirdan 26/6/2018 25/6/2018 7/6/2018

Mirdan 26/6/2018 25/6/2018 7/6/2018

Ahmad Eteng Sahido 6/10/2018 6/10/2018 3/10/2018


LUBRICATING;OIL;DEO;15W40-20;LIT 3E-9848

16/5/2018 FUEL FILTER KOMATSU -

2/7/2018 FUEL;FILTER;FOR WHEEL LOADER 600-311-


9121
2/7/2018 AIR;CLEANER;INNER;FOR WHEEL LOADER 600-185-
3120
7/6/2018 LUBRICATING;KOMATSU;GENUINE;OIL;15W40 15W40

16/5/2018 FUEL FILTER KOMATSU -

2/7/2018 CARTRIDGE;FOR WHEEL LOADER 418-18-


34160
2/7/2018 AIR;CLEANER;OUTER;FOR WHEEL LOADER 600-185-
3110
2/7/2018 CARTRIDGE;FOR WHEEL LOADER 417-18-
34130
18/7/2018 FUEL;FILTER;FOR GENSET DOOSAN -

18/7/2018 OIL;FILTER;FOR GENSET DO0SAN -

16/5/2018 PENSIL BREAKER KAP 20 TON -

3/10/2018 OIL;FILTER;FOR GENSET DO0SAN -

21/7/2018 V.BELT;B62;POLOS B-62

4/9/2018 KARET KONVEYOR 4 PLY L.80CM X P.17M -

4/9/2018 KARET KONVEYOR 4PLY L.80CM X P.6M -

4/9/2018 KARET KONVEYOR 4PLY L.80CM X P.18M -

4/9/2018 KARET KONVEYOR 4PLY L.60CM X P.15M -

4/9/2018 KARET KONVEYOR 4PLY L.60CM X P.7M -

4/9/2018 KARET KONVEYOR 4PLY L.50CM X P.12M -

4/9/2018 KARET KONVEYOR 4PLY L.80CM X P.15M -

6/11/2018 FUEL;FILTER(2MICRO);FOR EXCA KOBELCO VH23390E00


20D1
28/8/2018 CONTROLLER;FOR EXCAVATOR KOBELCO YN22E00354
FS
16/8/2018 REPAIR;KIT;FOR EXCA KOBELCO SK330 LC52V01004
R100
16/8/2018 ELEMENT;FILTER;IN;FOR EXCA KOBELCO SK200 LC11P00029S
002D
6/11/2018 FUEL;FILTER;FOR EXCA KOBELCO SK200/SK330 YN21P01157
R100J1L
16/8/2018 ELEMENT;FILTER;OUT;FOR EXCA KOBELCO LC11P00029S
003D
6/11/2018 ELEMENT;FILTER;OUT;FOR EXCA KOBELCO LC11P00029S
003D
6/11/2018 OIL;FILTER;FOR EXCA KOBELCO SK200/SK330 VH15607219
0D
16/8/2018 FUEL;FILTER;FOR EXCA KOBELCO SK200/SK330 YN21P01157
R100J1L
16/8/2018 FUEL;FILTER;FOR EXCA KOBELCO SK200/SK330 YN21P01157
R100J1L
16/8/2018 FUEL;FILTER(2MICRO);FOR EXCA KOBELCO VH23390E00
20D1
16/8/2018 ELEMENT;FILTER;IN;FOR EXCA KOBELCO SK330 LC11P00018S
002D
16/8/2018 ELEMENT;FILTER;OUT;FOR EXCA KOBELCO LC11P00018S
003D
16/8/2018 LUBRICATING;OIL;ENGINE;DH1;15W40;FOR DKL-
EOILDHI-I22
16/8/2018 LUBRICATING;OIL;GEAR;90;FOR EXCA KOBELCO DKL-GOIL-
90-I5
16/8/2018 AIR;CONDITIONER;FILTER;INNER;FOR EXCA LQ50V01007
P1
16/8/2018 AIR;CONDITIONER;FILTER;OUTER;FOR EXCA LQ50V01009
P1
16/8/2018 ELEMENT;FILTER;FOR EXCA KOBELCO YN57V00012
S002
16/8/2018 REPAIR;KIT;FOR EXCA KOBELCO SK200 LC52V01025
R100
3/10/2018 OIL;FILTER;FOR EXCA KOBELCO SK200/SK330 VH15607219
0D
6/11/2018 GREASE;EPX;NLGI-2 HDX-2

30/8/2018 KARET KONVEYOR L:80 X 17 METER T:8MM 4 -

19/5/2018 KUKU BUCKET KOBELCO SK 200 -

19/5/2018 PIN KUKU BUCKET KOBELCO SK 200 -

29/10/2018 SARUNG;TANGAN;BINTIK BINTIK

30/8/2018 LED LAMPU SOROT 150W -

20/10/2018 V.BELT;A50;POLOS A-50

14/8/2018 BESI PLAT 10MM -

9/6/2018 GREASE;COBRA;@15KG GREASE;COB


RA;@15
4/6/2018 POMPA;GREASE;MANUAL -

19/7/2018 KABEL NYY 3X2,5MM -

9/8/2018 KABEL SERABUT HITAM (NYY 2x1,5) @100 MTR -

REPAIRE HOSE POWER STERING -

REPAIRE HOSE SWING GREADER -

9/6/2018 SEAL;ADJUSTER;FOR DOZER D85ESS 207-30-


54160
REPAIRE HOSE BRAKER 1 1/4 -

REPAIRE HOSE AC -

REPAIRE HOSE ARM DOZZER -

7/6/2018 BUSHING;FOR EXCAVATOR PC200 20Y-70-


32410
25/9/2018 CARTRIDGE;FOR EXCAVATOR PC200-8 6736-51-
5142
7/6/2018 SEAL,DUST;FOR EXCAVATOR PC200 20Y-70-
23230
7/6/2018 SEAL,DUST;FOR EXCAVATOR PC200 20Y-70-
23230
25/9/2018 FUEL;FILTER;FOR EXCAVATOR PC200-8 600-319-
3750
17/7/2018 SPACER;FOR EXCAVATOR PC200 205-70-
74381
18/7/2018 NUT;FOR DOZER KOMATSU D85E-SS -

7/6/2018 PIN;FOR EXCAVATOR PC200 205-70-


73270
7/6/2018 PLATE;FOR EXCAVATOR PC200 205-70-
02496
3/10/2018 FUEL;FILTER;FOR WHEEL LOADER 600-311-
9121
Gross Price Amount
L 18.00 20.00 20.00 47,934.00 886,779.00

EACH 2.00 2.00 2.00 1,222,000.00 2,444,000.00

EACH 4.00 4.00 4.00 187,300.00 599,360.00

EACH 2.00 2.00 2.00 1,251,900.00 2,003,040.00

L 836.00 836.00 836.00 27,272.73 22,800,002.28

EACH 2.00 2.00 2.00 290,000.00 580,000.00

EACH 4.00 4.00 4.00 1,028,900.00 3,292,480.00

EACH 2.00 2.00 2.00 1,635,600.00 2,616,960.00

EACH 4.00 4.00 4.00 977,900.00 3,129,280.00

EACH 4.00 4.00 0.00 208,711.00 834,844.00

EACH 4.00 2.00 2.00 337,305.00 674,610.00

UNIT 3.00 3.00 0.00 12,598,995.00 37,796,985.00

EACH 4.00 4.00 0.00 345,323.00 1,381,292.00

EACH 100.00 100.00 100.00 53,400.00 5,340,000.00

SET 1.00 1.00 1.00 14,880,000.00 14,880,000.00

SET 1.00 1.00 1.00 6,715,000.00 6,715,000.00

SET 1.00 1.00 1.00 15,622,000.00 15,622,000.00

SET 1.00 1.00 1.00 9,809,000.00 9,809,000.00

SET 1.00 1.00 1.00 5,349,000.00 5,349,000.00

SET 1.00 1.00 1.00 6,856,000.00 6,856,000.00

SET 1.00 1.00 1.00 13,396,000.00 13,396,000.00

EACH 3.00 3.00 0.00 178,000.00 373,800.00

EACH 1.00 1.00 1.00 30,963,000.00 21,674,100.00

EACH 2.00 2.00 2.00 1,594,000.00 2,231,600.00

EACH 2.00 2.00 2.00 530,000.00 742,000.00

EACH 3.00 3.00 0.00 350,000.00 735,000.00

EACH 4.00 4.00 4.00 627,000.00 1,755,600.00

EACH 2.00 2.00 0.00 890,000.00 1,246,000.00

EACH 2.00 2.00 0.00 178,000.00 249,200.00

EACH 4.00 4.00 4.00 350,000.00 980,000.00


EACH 4.00 4.00 4.00 350,000.00 980,000.00

EACH 4.00 4.00 4.00 178,000.00 498,400.00

EACH 2.00 2.00 2.00 377,000.00 527,800.00

EACH 6.00 6.00 6.00 890,000.00 3,738,000.00

PAIL 18.00 18.00 18.00 948,000.00 11,944,800.00

PAIL 4.00 4.00 4.00 350,000.00 980,000.00

EACH 4.00 4.00 4.00 726,000.00 2,032,800.00

EACH 4.00 4.00 4.00 373,000.00 1,044,400.00

EACH 2.00 2.00 2.00 657,200.00 920,080.00

EACH 2.00 2.00 2.00 1,980,000.00 2,772,000.00

EACH 4.00 4.00 4.00 178,000.00 498,400.00

DRUM 1.00 1.00 1.00 7,025,037.00 7,025,037.00

EACH 2.00 2.00 2.00 9,350,000.00 18,700,000.00

EACH 5.00 5.00 10.00 260,000.00 910,000.00

EACH 5.00 5.00 10.00 34,000.00 119,000.00

LUSIN 24.00 24.00 24.00 32,500.00 780,000.00

EACH 10.00 10.00 10.00 550,000.00 5,500,000.00

EACH 4.00 4.00 4.00 42,500.00 170,000.00

LBR 4.00 4.00 4.00 2,900,000.00 11,600,000.00

PAIL 40.00 40.00 40.00 490,000.00 19,600,000.00

EACH 20.00 20.00 20.00 200,000.00 4,000,000.00

ROLL 1.00 1.00 1.00 1,750,000.00 1,750,000.00

ROLL 1.00 1.00 1.00 900,000.00 900,000.00

EACH 1.00 1.00 1.00 145,000.00 145,000.00

EACH 1.00 1.00 1.00 2,595,000.00 2,595,000.00

EACH 2.00 4.00 4.00 350,000.00 1,400,000.00

SET 1.00 1.00 1.00 1,335,000.00 1,335,000.00

EACH 1.00 1.00 1.00 250,000.00 250,000.00

EACH 1.00 1.00 0.00 490,000.00 490,000.00

EACH 4.00 4.00 4.00 375,000.00 1,425,000.00

EACH 5.00 5.00 5.00 65,000.00 325,000.00

EACH 8.00 8.00 8.00 85,000.00 646,000.00


EACH 8.00 8.00 8.00 85,000.00 646,000.00

EACH 5.00 5.00 5.00 85,000.00 425,000.00

EACH 2.00 2.00 2.00 450,000.00 900,000.00

EACH 72.00 72.00 72.00 30,000.00 2,160,000.00

EACH 4.00 4.00 4.00 675,000.00 2,565,000.00

EACH 2.00 2.00 2.00 375,000.00 712,500.00

EACH 4.00 4.00 4.00 124,800.00 499,200.00