You are on page 1of 26

TRAINING REPORT

8TH SEMESTER- 2022


SUNNY JAIN 18SA02AR010
ADOBE AND BAMBOO RESEARCH INSTITUTE

F O U N D E R - N R I PA L A D H I K A RY
O F F I C E - K AT H M A N D U, N E PA L

Abari is a socially and environmentally comitted reasearch, design


and constrcution firm that examines, encourages and celebrates the
vernacular architectural tradition of Nepal. As Nepal poses sophisticated
traditional knowledge of natural materials like adobes, bamboo, stone
and reed, ABARI as a research and design firm tries to promulgate
these materials into contemporary design practices.

VISION-
Instigated by environmental consciousness, health, aesthetic, and
economical reasons that people are showing a reinvigorated interest
to go back to natural building materials like earth, wood, stone and
bamboo. We are seeing a modest institutionalized effort to rediscover
traditional natural materials so that they can be re- appropriated to
cater to the modern requirements in Nepal.
OFFICE AND STAY IMAGES
OFFICE STRUCTURE
OPERATIONS

• Age: 16 Years (since 2006)

• Project Type: Public Buildings, Residential,


Interiors, Furnitures

• Office Hours: 9:00 am to 6:00 pm


(Weekdays)

• Lunch Break: 1:00 pm to 2:00 pm

• Holidays: Saturdays and Sundays

• People: 2 Staff, 2-4 Interns


200 In- house craftsmen

ORGANIZATION
• Nripal Adhikary • Asmita Sigdel • Prateek Kakri
Founder Architect Accountant
Conceptual Development Conceptual Development Financial Management
Design Supervision Design Development
Client Meetings Working Drawings
Site Visits Construction Coordination

• Radhika Bhakkar • Sunny Jain • Craftsmen


Intern Intern In House skilled workers
Physical Models Physical Models Earth Construction
Digital Models Digital Models Bamboo Construction
Design Development Design Development Furniture Making
Working Drawings Working Drawings
Site Supervision Site Supervision
Site Presentation Site Presentation
EXPERIENCE LETTER....
MADI GLAMPING TOWER
MADI, CHITWAN

• Client: Nripal Adhikary

• Estimated Cost: -

• Project Status: Ongoing

• Project Timeline: 2-3 Month

• Program: Hospitality

• Project Team: Design


Working Drawing
Render
Physicial model
3
2
1
200mm Dia.

3
2
1000 1725 200 2550 200
100
150 2300

TRUSS TOP G
131
A

A
+8060 LVL
3

314

26°
3

15

14

13

12

11

10

9
636
F F

712
2209

8
7
3650 x 1950
4000 x 1000
VERANDAH

ENTRANCE
3650 x 2350

2815
6
TOILET

3796
5

2223
4
100
GROUND FLOOR PLAN

1683
2340

2
1
3172

564

UP
D1
F.F BELOW
J J J J

+5080 LVL 1311


B

887
13
11 11
13
200 825 1724 200 225 950 1374 200

3
2
1

2500
7185

1614
GROUND FLOOR PLAN
3311

1075 1165 1075


1

3
2

G.F BELOW
K K

+2500 LVL 1311

887
13
11 11
13
A

A
15

14

13

12

11

10

DN

2500
8

1533
7
BEDROOM
4650 x 3450

3653
5

PLINTH +00 LVL


4

K K K
3
FIRST FLOOR PLAN

2270

FRONT ELEVATION WITH WOOD


1

TRUSS A1
UP
B

1377 1372 1373 1275 200


3
2
1

FIRST FLOOR PLAN FRONT ELEVATION WITH WOOD


200mm Dia.

3
2

1000 1725 200 2550 200


100
150 2300
7
PLAN 83
JOINTS QUANTITY 4


180 81 180
81





81
9295 853 81
83 3 81 170
180 32 81 101
95 85 33 170
81

PLAN
81

JOINTS QUANTITY
180 32 81

4
 128

E B I
81

81
C

97
83 92

A LB G


F C

39
A

57
80

95

95
84

84
80
C

84

120

95
4

95

95
84 10

84
E

80
C

84

95
8


6


85
85
92

80
48
85
83 10
83 81 8

1



180 170  83 81

PLAN JOINTS

QUANTITY


81


K
96 71
180 81


170 81

85

85
81


83 81 92
101
83 92 85
81 81 101
 80
128
 81 81


87  128


E B-I 16

81
85

E
85
G A- 4 C-I 4



81
85

39
80
G
4 4

120
4
F *ALL DIMENSIONS
E- OF
4 THE
F-BAMBOO

39
80

7
10

54
10 G- 7

12

120
J
8

K
10
97

ARE IN 3D ACTUAL SCALE. 92


104

85
143

85
8
L
80

48
M

114
83

85

85

85
57

85
92

48
H J-IS12

6
170 *HIGHLIGHTED I- 7
MODULE K-
MIRRORED21

84
96 71

69
170
96 ALONG BOTH71 AXES.

70
80

6
83 83
81 85 82
85 89
87

PLAN 87
JOINTS BAMBOO DIMENSIONS
QUANTITY
BRACKET DIMENSION
87
85
A- 4 B- 16 C- 4
80 85
A- 4 B- 16 C- 4
J K E- 4 F- 10 G- 7
E- 4 F- 108080MMG-DIA.
7BAMBOO TOTAL
104

J K
83

83 85

85
104

MMTHK. BAMBOO
I- 7 J- 12 K- 21
4
5MM THK. M.S. SHEET
85

85

5MM THK. M.S. SHEET


7
12

I- 7 J- 122020MM
10 MM DIA. M.S. NUT MMK- 21
THK.M.S.M.S.
ROD ROD
89
143

80 10MM DIA. M.S. NUT THK.


M
101

6
85

16
85
85 1010MM
MMTHK.
THK.M.S.M.S.
THREADED ROD
10 MM DIA.THREADED
M.S. ROD

7
85
10MMTHK. M.S.
THREADED ROD
I THREADED ROD
81

70

83

1010MM
MMDIA.
DIA.
M.S.M.S.
NUT NUT
39

87
20 MM DIA. M.S. ROD
20MM THK. M.S. ROD

80 MM DIA. BAMBOO
80MM THK. BAMBOO 5MM THK.M.S.
5MM THK. M.S. SHEET
SHEET
92

CONCRETE PLINTH
CONCRETE PLINTH

TOTALJOINT
BRACKET & BAMBOO
TOP RING DETAIL FOOTING BRACKET DETAIL
87
89 8
J 5MM
5MM THK.
THK. M.S.SHEET
M.S. SHEET
6
104

83

One face of the brackets remains


ŽƉĞŶĚƵƌŝŶŐĐŽŶƐƚƌƵĐƟŽŶƚŽĂůůŽǁ
ƚŚĞďĂŵƚŽďĞĮdžĞĚ͘/ƚŝƐǁĞůĚĞĚ
85
ĂŌĞƌǁĂƌĚƐ͘

10MM THK.
10 MM M.S.
THK. THREADED
M.S. THREADED ROD
ROD

80MM THK.
80 MM BAMBOO
DIA. BAMBOO
The joinery should always include the
strongest part of the bamboo which is
the node.
6
20MM THK.
20 MM M.S.
THK. ROD
M.S. ROD
The rod is inserted above the bamboo
ŶŽĚĞĂŶĚƚŚƌĞĂĚĞĚƌŽĚŝƐĮdžĞĚŝŶŝƚ͘

32
95 33 EXPLODED BRACKET
JOINERYDETAIL
DETAIL EXPLODED VIEW

B
8
3D VISUALIZATION
PHYSICAL MODEL
PARADISE GARDEN
KATHMANDU,NEPAL

• Client: -

• Estimated Cost: -

• Project Status: Ongoing

• Project Timeline: 3-4 weeks

• Program: Hospitality

• Project Team: Design and Render


FIREPLACE

UP

CONCEPTUAL PLAN

3D VISUALIZATION
PRESPECTIVE SECTION
COLLABORATIVE SPACE
KATHMANDU,NEPAL

• Client: -

• Estimated Cost: -

• Project Status: Ongoing

• Project Timeline: 3-4 weeks

• Program: Office

• Project Team: Design and Render


CONCEPTUAL PLAN G.F

CONCEPTUAL PLAN F.F 3D VISUALIZATION


3D VISUALIZATION
SAURAH RESTAURANT
SAURAH,CHITWAN - NEPAL

• Client: Jungle Resort

• Estimated Cost: -

• Project Status: Ongoing

• Project Timeline: 1-2 Years

• Program: Hospitality

• Project Team: Design


Working
Render
J I H G F E D C B A

LVL +7330 MM
LVL +7510 MM LVL +6800 MM

2' 1"
LVL 6800MM

10'5"

8' 2"

5100
LVL +4270 MM

14'5"
LVL +4270 MM

16' 4"
8' 2"
LVL +2400

9'11"
LVL +2045 LVL 2400MM
LVL +1700MM

14"
14"
LVL +1165 MM

21"
LVL +1165 MM

4'1"
ROAD LVL 00 MM

J I H G F E D C B A

SECTION AA’

630 450
j I H G F E D C B A

100
1 1

2360 1000 395 1125 1500 1125 1200 1900 300 1900 1200

2 2
150
1025

925
WASH
800

LVL +1700 MM
SHOP

1100
900

KITCHEN
1550

STORE 1200 870 800 640 640 800 870 800 640 640 800 870 800 640
1025

925
3 3

3300
1025

925
A RECEPTION
RESTAURANT LVL +2050 MM LOUNGE
A'
1100
900

LVL +1165 MM LVL +1700 MM LVL +2400


UP
UP
1025

925

4 1200 2550 4
1025

925
1100
900

530

100
1025

925

5 UP
5
1125 1500 1125 1125 1500 1125 640 800 870 800 640 640 800 870 800 640 640 800 870 1440 640 800 870 800 640

560
UP

SEATING 70 PEOPLE

j I H G F E D C B A

GROUND FLOOR
WINDOW SECTION

J I H G F E D C B A

LVL +9460 MM

LVL +7510 MM
450

LVL +6800 MM
450
630
2640

2080

LVL +4270 MM
450

450
3500
550

560

2160
2630

2630

2630
1520

1510

LVL +2400 MM
560
560

560

LVL +1165 MM
1190

ROAD LVL 00 MM ROAD LVL 00 MM

J I H G F E D C B A

FRONT ELEVATION SITE IMAGE


PHARPHING MONASTRY
KATHMANDU,NEPAL

• Client: -

• Estimated Cost: -

• Project Status: Ongoing

• Project Timeline: 8-10 Months

• Program: Hospitality

• Project Team: Working Drawing


3D Model
Physical Model
X
P 18 P
UP
LVL 1350 cm
300 600
600
B4 B4

16 17 16
1
LVL 1250 cm

PHASE 4
(pju 4 )
W1 D1 W1
J J
UP
300 600
300 600
B3 B3

C4 C4
1

600

600
W1 D1 W1

2
M LVL 1065 cm
300

270

819
Existing structure
600

600
2

PHASE 3
3 D 14 15 14 D

(pju 3 )
LVL 970 cm
W1 W1
270

B2 B2
819
12 13 12
C3 C3
D1 D1
400

819
300

300
UP +300.0 UP
3
A A'
W1 W1

W1 W1

10 J 11 N 11 J 10 D
4 D1 D1 D LVL 769 cm
400

819
300

300
UP +300.0 UP

PHASE 2
250
A A'

(pju 2 )
270

W1 W1
C2
B1 A1 A1
B1
D1 D1
C2
4 310 310

450
5 237 287 237
600

600
7 8 K 8' 9 8'
K 8 7
I I LVL 597 cm
270

310

310
300

40 40
210 310 310 210 4 J 5 5' J2 6 J2 5' 5 J 4
5 237 287 237
C1
LVL 527 cm
600

600
560 W1 D1 W1
560 C1

PHASE 1
310

310
D

(pju 1 )
600 D 1 2 2' 3 2' 2 1
LVL 437 cm
300

EXCAVATION LEVELING DRAWING


40 40
210 210
300
600
560 40 UP 560
W1 D1 W1
C
PARIKRAMA PATH +0.0
A
6 B
B
600 C A
D D
300
600
40 UP
PARIKRAMA PATH 300 270 +0.0 400 270 300

A B C D E F
1 2 3 A B C C B A 3 2 1
LVL 185 cm
300 270 400 270 300
X rYyks lh<hckV
A B C D E F P 18 P

B4 B4

16 17 16

J J

B3 B3

C4 C4

BASE PLAN
D1 14 15 14

OUTER TRUSS ELEVATION


B2 B2

D1 12 13 12
D1

C3 C3

10 J 11 N 11 J 10 D
D

C2
B1 B1
D1 D1
C2

7 8 9 8 7
I I

J J2 J2 J D1
D1 4 5 6 5 4

C1

C1

1 2 3 2 1 D1
D1
P P
B
B
C
LVL 1375 cm
C
D D

1 2 A B C C B A 2 1

PHASE 8
(pju 8 )
UP
300 600
600
Y

C4 C4
W1 D1 W1

A2 A2

ROOF DETAIL DRAWING


nw'; iqIB ua 8
600

600

3 3
LVL 967 cm

PHASE 7
(pju 7 )
C3 C3

W1 W1

C2 C2
2 NN 2

PHASE 6
8 9 9 8
LVL 769 cm

(pju 6 )
D1 D1 +16000.0
2 2
300

300

UP UP

C1 C1

W1 W1

+13800.0 A1 A1
B1 B1

I
I 6' 6 7 6 6'
LVL 597 cm

J3 J2 J2 J3
J3
4' 4 5 4 4'
J3 LVL 527 cm
600

+9300.0

PHASE 5
(pju 5 )
1' 1 2 3 2 1 1'
LVL 437 cm
40 40
210
B B

W1 D1 W1

A A

+5100.0
C C

300
600
40 UP
PARIKRAMA PATH +0.0

LVL 185 cm
+600.0

+0.0
rYyks lh<hckV

TOP VIEW ROOF ELEVATION

INNER TRUSS ELEVATION


OUTER TRUSS ELEVATION

ISOMERTIC VIEW

INNER TRUSS ELEVATION


1

3
1-OUTER TRUSS
2-INNER TRUSS
3-ISO-MODEL

2
PHYSICAL MODEL
SITE INSPECTION,PHARPHING
SITE INSPECTION,POKHRA(BAL ASHARAM) 
WORKSHOP,RAMNAGAR
A rope suspend between two point not on the same vertical an cantenary To maintain moisture a good quality tiles soaked into the water,
curve is drawn

Plaster of paris and mortar (3:1:0.5) to make the settinig process fast Starting the vault from side.

Catalan stair vault In the beginning for side arch was made The Final result.

CATALAN VAULT WORKSHOP


ORGANIZED BY ABARI

You might also like