DATA CURAH HUJAN (mm) TAHUN 2013

BULAN
TANGGAL
Jan Feb Mar Apr Mei Jun Jul Ags Sep Okt Nov Des
1 10.8335523 40.992728 6.5334339 38.888183 11.168293 20.668026 11.61632 8.2036973 12.867733 25.395591 13.253976 24.030876
2 12.3141301 13.897705 17.58156 7.5290694 5.2425389 16.494081 8.349611 0.5767828 8.0354701 10.567473 16.229733 25.445387
3 9.04226284 2.4890893 8.5058159 21.43879 5.6442252 31.274977 3.4795786 18.714523 9.5031714 17.124938 4.1542045 28.305241
4 4.51555164 6.536865 15.720746 49.376644 0.1441956 57.518548 17.562674 18.910219 3.6134721 10.546876 5.7609582 42.956558
5 2.31056269 0.0034332 8.6002336 14.402388 0 60.498733 28.78763 30.438997 2.3466138 13.106348 21.864511 6.3960993
6 5.07946039 0 6.0030008 20.134153 8.8268274 15.719042 81.254218 23.675537 15.868379 0.1836775 11.224938 24.492644
7 2.68821496 2.6538829 4.2640684 7.724764 6.0287489 19.3737 33.125517 8.2088495 13.93375 1.9466398 7.9582234 37.504555
8 0 34.201833 14.70623 15.940471 15.959357 21.461965 6.7188272 26.288226 7.1651486 10.680768 0.2969744 12.866016
9 0.44975304 99.930974 23.946761 9.8568011 43.493871 22.896191 23.236078 33.559801 1.9105913 14.443588 0.0411987 22.163182
10 0.64029685 59.11502 9.4207717 10.155485 20.389943 18.743703 19.971079 10.704798 0.0463485 7.2784436 10.50911 60.754383
11 1.84707724 22.990609 34.469585 16.908648 8.2088468 25.815292 5.0434147 11.988834 2.3311608 1.6685484 2.4796502 30.813231
12 4.02374348 33.782958 30.650152 14.38008 15.195467 5.978966 8.7169629 14.216991 12.517547 0.120163 32.55728 77.19606
13 2.16979953 37.367253 43.910974 27.747343 4.4391623 29.364414 17.73605 15.12336 10.721976 0.0274658 5.2803017 14.113997
14 5.1429784 35.35881 51.045252 28.24517 25.237667 73.031657 25.768097 27.967078 20.867156 9.1667125 1.4505395 33.564946
15 6.12659722 28.859691 19.54193 14.745716 20.963285 8.2654986 61.767188 24.605939 5.0004965 0.7656096 3.6254884 35.513285
16 23.5708266 1.7354969 16.494938 19.497299 50.138805 7.879263 44.000262 43.3651 35.925309 2.8736116 40.338724 12.217141
17 21.3134747 3.2684305 5.2150752 21.20018 17.293164 1.8633841 35.861763 5.6510965 42.879295 8.0543549 39.785105 5.4382313
18 13.7552263 2.3105622 14.385222 21.605294 14.635846 13.877103 10.128019 0 2.9216785 0.4909518 46.408654 107.46519
19 3.9216011 3.5739914 8.6173949 71.905578 25.95518 11.489295 5.3403848 0 0.5390166 0 26.130301 10.102274
20 4.63485506 11.109926 7.1239458 16.194532 12.21542 15.023804 21.001054 24.688311 1.0540007 0 4.3155669 9.2473958
21 0.32444028 4.3258683 6.9402726 20.589073 14.093396 1.4033316 10.58636 13.240239 0.0995636 7.3865883 22.25933 9.7417849
22 6.23302596 3.7061722 20.554729 19.178013 3.5860089 9.5632569 48.05317 9.9185975 7.2784448 32.474889 18.712798 5.5618318
23 6.20727775 6.2416105 56.880043 18.189236 21.440508 12.684066 12.093542 0.4051209 0.6282803 6.9351188 17.736061 3.7010188
24 9.97010064 13.945777 15.020367 28.344721 20.604506 18.219279 37.235065 0 0 0.3467563 23.191452 5.8708207
25 30.5368396 9.8928507 19.442371 18.498231 5.8639555 39.018627 68.432803 0 0 0.0343323 29.458796 12.275505
26 3.59716255 7.4071839 94.588859 9.5958699 25.577539 11.257553 15.013506 0.0068665 0 22.824099 16.903498 2.2247326
27 18.8758836 10.601806 23.194884 14.021302 4.5404444 23.004347 26.901062 18.463895 0 25.732034 24.617958 8.8302596
28 21.6894276 14.271923 94.798278 4.4408824 38.97228 32.689473 14.560319 19.778823 8.6173996 6.4390229 21.404459 5.4090523
29 34.097098 2.4805056 6.4235651 28.880301 12.654877 20.498089 12.500379 20.815664 10.33058 12.66174 3.0658706
30 10.1417562 5.8073037 5.3300833 39.85634 31.76421 23.933021 9.8121613 44.549564 17.794417 118.2095 10.581209
31 5.56697714 15.1783 52.401366 18.915363 3.6478049 22.044745 29.367831

Hujan Maks 34.0971 99.931 94.7983 71.9056 52.4014 73.0317 81.2542 43.3651 44.5496 32.4749 118.21 107.465
Jml. Curah Hujan 281.62 510.572 701.623 592.488 566.997 669.497 765.687 434.662 292.037 286.784 598.821 717.217
Jml. Hari Hujan 7 13 12 13 10 10 13 6 9 11 6 13
Jml. Data (1-15) 15 15 15 15 15 15 15 15 15 15 15 15
Jml. Hujan (1-15) 67.18398 418.181 294.901 297.474 190.942 427.105 353.133 273.184 126.729 123.023 136.687 476.116
Jml. Data (16-31) 16 14 16 15 16 15 16 16 15 16 15 16
Jml. Hujan (16-31) 214.436 92.3916 406.722 295.014 376.055 242.392 412.554 161.478 165.308 163.762 462.134 241.1

Hujan Maksimum Jumlah Curah Hujan Jumlah Hari Hujan Hujan Ekstrim
Tahunan
118 6418 123 59
1. METODE THEISSEN

TAHUN STASIUN
1 2 3
2003 107.7 127 105.1
2004 120.9 128.3 97.5
2005 149.7 139 123.9
2006 73.8 93 54.2
2007 105.3 102 85.3
2008 160.4 148 106.6
2009 81.4 81 70.7
2010 138.6 156 116.9
2011 132.6 125 103.9
2012 85.6 117 65.1
2013 107.3 118 108.1
Rata-rata 114.8 121.3 94.3
luas(km2) 32.749 12.649 17.849
Rerata
HUJAN PX
4 5
91.2 122.2 109.137
83.1 126.4 110.396
90.1 147.7 129.270
104 147.6 103.879
99.8 141.4 112.306
147 180.9 142.837
82.7 93.2 84.069
155.5 174.9 153.165
68.8 142.8 114.740
76 80.7 81.753
54.8 103.3 93.156
95.7 132.8 111.800
39.349 45.849 148.445
112.246
Tabel Metode Gumbel
No Xi (mm) (Xi - X) (Xi - X)2
1 109.137 -3.109 9.667
2 110.396 -1.850 3.423
3 129.270 17.024 289.810
4 103.879 -8.367 70.010
5 112.306 0.060 0.004
6 142.837 30.591 935.798
7 84.069 -28.177 793.954
8 153.165 40.919 1674.350
9 114.740 2.494 6.219
10 81.753 -30.493 929.834
11 93.156 -19.090 364.435
S 1234.708 5077.504
Rata2 112.246
Sx 22.533

Perhitungan Curah Hujan Rancangan Metode Gumbel

T YT Yn Sn KT
2 0.3665 0.4996 0.9697 -0.1372
5 1.4999 0.4996 0.9697 1.0316
10 2.2504 0.4996 0.9697 1.8055
20 2.9702 0.4996 0.9697 2.5478
25 3.1985 0.4996 0.9697 2.7833
50 3.4812 0.4996 0.9697 3.0747
100 3.5115 0.4996 0.9697 3.1060
200 5.2958 0.4996 0.9697 4.9461
Tabel Metode Log
No Xi (mm) Log Xi
1 109.137 2.0380
2 110.396 2.0430
3 129.270 2.1115
4 103.879 2.0165
5 112.306 2.0504
6 142.837 2.1548
7 84.069 1.9246
8 153.165 2.1852
9 114.740 2.0597
10 81.753 1.9125
11 93.156 1.9692
S 1234.708 22.4654
Rata2 112.246 2.0423
Slog X 0.087
Cs 0.085

X Sx XT
112.246 22.533 109.15
G
112.246 22.533 135.49 2 5
112.246 22.533 152.93
112.246 22.533 169.65642 0.1 -0.017 0.836
112.246 22.533 174.96242 0.085 -0.014 0.837
112.246 22.533 181.52994 0 0 0.842
112.246 22.533 182.23427
112.246 22.533 223.69773

Perhitungan Curah Hujan Ra

T KT X
0 -0.017 2.0423
5 0.836 2.0423
10 1.291 2.0423
20 1.617 2.0423
25 1.780 2.0423
50 2.099 2.0423
100 2.389 2.0423
200 2.656 2.0423
Tabel Metode Log Pearson III
Log X-Log Xi (Log X-Log Xi )2 (Log X-Log Xi)3
0.0043 0.0000 0.000000
-0.0006 0.0000 0.000000
-0.0692 0.0048 -0.000331
0.0258 0.0007 0.000017
-0.0081 0.0001 -0.000001
-0.1125 0.0127 -0.001425
0.1177 0.0138 0.001629
-0.1428 0.0204 -0.002915
-0.0174 0.0003 -0.000005
0.1298 0.0168 0.002187
0.0731 0.0053 0.000391
0.0749 -0.0005

Interpolasi Nilai KT Metode Log Pearson


Nilai K untuk Periode Ulang T
10 20 25 50

1.292 1.621 1.785 2.107


1.291 1.617 1.780 2.099
1.282 1.595 1.751 2.054

erhitungan Curah Hujan Rancangan Log Pearson

Slog X Log XT Xt
0.087 2.041 109.860
0.087 2.115 130.222
0.087 2.154 142.572
0.087 2.182 152.164
0.087 2.196 157.184
0.087 2.224 167.510
0.087 2.249 177.475
0.087 2.272 187.179
Tabel Metode Log Normal
No Xi (mm)
1 109.137
2 110.396
3 129.270
4 103.879
5 112.306
6 142.837
7 84.069
8 153.165
9 114.740
10 81.753
11 93.156
S 1234.708
Rata2 112.246
Slog X
Cs

n Int
T
G
100 200 2

2.400 2.670 0.05 -0.0250


2.389 2.656 0.042 -0.029
2.326 2.576 0.10 -0.0496

Perhitungan Curah Hujan

T KT
0 -0.029
5 0.832
10 1.298
20 1.747
25 1.722
50 2.146
100 2.471
200 2.633
Log Xi Log X-Log Xi (Log X-Log Xi )2
2.0380 0.0043 0.0000
2.0430 -0.0006 0.0000
2.1115 -0.0692 0.0048
2.0165 0.0258 0.0007
2.0504 -0.0081 0.0001
2.1548 -0.1125 0.0127
1.9246 0.1177 0.0138
2.1852 -0.1428 0.0204
2.0597 -0.0174 0.0003
1.9125 0.1298 0.0168
1.9692 0.0731 0.0053
22.4654 0.0749
2.0423
0.087
0.042

Interpolasi Nilai KT Metode Log Pearson


Nilai K untuk Periode Ulang T
5 10 20 25 50 100 200

0.8334 1.2965 1.6863 1.7069 2.1341 2.4570 2.6185


0.832 1.298 1.747 1.722 2.146 2.471 2.633
0.822 1.3078 1.7247 1.8061 2.2130 2.5489 2.7169

Perhitungan Curah Hujan Rancangan Log Pearson

X Slog X Log XT Xt
2.0423 0.087 2.040 109.605
2.0423 0.087 2.114 130.112
2.0423 0.087 2.155 142.790
2.0423 0.087 2.194 156.150
2.0423 0.087 2.191 155.365
2.0423 0.087 2.228 169.074
2.0423 0.087 2.256 180.384
2.0423 0.087 2.270 186.321
Parameter Statistik Metode Gumbel

No Xi Xi - X (Xi - X)2
1 109.137 -3.109 9.667
2 110.396 -1.850 3.423
3 129.270 17.024 289.810
4 103.879 -8.367 70.010
5 112.306 0.060 0.004
6 142.837 30.591 935.798
7 84.069 -28.177 793.954
8 153.165 40.919 1674.350
9 114.740 2.494 6.219
10 81.753 -30.493 929.834
11 93.156 -19.090 364.435
Jumlah 1234.708 5077.504
Rata-rata 112.246
Sx 22.533
Cv 0.2007
Cs 0.4677
Ck -0.3295

Perhitungan Curah Hujan Rancangan Metode Gumbel

T (Thn) YT Yn Sn KT X Sx
2 0.3665 0.4996 0.9697 -0.1372 112.246 22.533
5 1.4999 0.4996 0.9697 1.0316 112.246 22.533
10 2.2504 0.4996 0.9697 1.8055 112.246 22.533
20 2.9702 0.4996 0.9697 2.5478 112.246 22.533
25 3.1985 0.4996 0.9697 2.7833 112.246 22.533
50 3.9019 0.4996 0.9697 3.5087 112.246 22.533
100 4.6001 0.4996 0.9697 4.2287 112.246 22.533
200 5.2958 0.4996 0.9697 4.9461 112.246 22.533

Uji Kesesuaian Distribusi Metode Chi-Square

Pembagian kelas:
N (Jumlah data) = 11
K (Jumlah kelas) = 1 + 3,322 log N = 4.00
Peluang batas kelas (P) = 1/ K = 0.25 25%
Tabel Peluang dan Nilai Batas Kelas untuk Distribusi Gumbel Tipe I
P(%) T YT Sx Yn Sn K
20 5.0000 1.4999 22.5333 0.4996 0.9697 1.0316
40 2.5000 0.6717 22.5333 0.4996 0.9697 0.1775
60 1.6667 0.0874 22.5333 0.4996 0.9697 -0.4251
80 1.2500 -0.4759 22.5333 0.4996 0.9697 -1.0060

Perhitungan Uji Chi-Kuadrat Untuk Distribusi Gumbel Tipe I

Nilai Batas Jumlah Data


No. (ni - ei)2
Sub Kelas ni ei
1 X ≤ 89.578 2.000 2.750 0.563
2 89.578 < X ≤ 102.668 1.000 2.750 3.063
3 102.668 < X ≤ 116.246 5.000 2.750 5.063
4 116.246 < X ≤ 135.491 1.000 2.750 3.063
5 X > 135.491 2.000 2.750 0.563
Jumlah 11.000 13.750

c2hitung = 4.477
K (jumlah kelas) = = 4.000
P (parameter yang terikat dalam agihan frekuensi) = 2.000
DK = K - (P + 1) = 1.000
Untuk : DK = 2 dan a = 5% dari Tabel C.9 diperoleh c cr =2
5.991
Ternyata c hitung
2
< c 2
cr : Distribusi Frekuensi Diterima
89.58 102.67 116.25 135.49
89.58 102.67 116.25 135.49
1 0 0 1 0 0
2 0 0 1 0 0
3 0 0 0 1 0
4 0 0 1 0 0
5 0 0 1 0 0
6 0 0 0 0 1
7 1 0 0 0 0
8 0 0 0 0 1
9 0 0 1 0 0
10 1 0 0 0 0
11 0 1 0 0 0

XT
109.154
135.491
152.929
169.656
174.962
191.308
207.532
223.698
bel Tipe I
X (mm)
135.49
116.25
102.67
89.58

(ni - ei)2 / ei
0.205
1.114
1.841
1.114
0.205
4.477

uensi Diterima
Tabel Perhitungan Parameter Statistik Metode Log Pearson Tipe - 3
No Xi Log Xi Log Xi - Log X (Log Xi - Log X)2 (Log Xi - Log X)3
1 109.137 2.0380 -20.4274 417.280604 -8523.977555
2 110.396 2.0430 -20.4225 417.077117 -8517.743243
3 129.270 2.1115 -20.3539 414.282124 -8432.265860
4 103.879 2.0165 -20.4489 418.157166 -8550.850556
5 112.306 2.0504 -20.4150 416.772893 -8508.425443
6 142.837 2.1548 -20.3106 412.519603 -8378.511835
7 84.069 1.9246 -20.5408 421.923785 -8666.645094
8 153.165 2.1852 -20.2803 411.288937 -8341.046501
9 114.740 2.0597 -20.4057 416.392776 -8496.787927
10 81.753 1.9125 -20.5529 422.422341 -8682.010736
11 93.156 1.9692 -20.4962 420.094563 -8610.345749
Jumlah 22.4654 4588.211910 -93708.610499
Rata-rata 2.0423
Slog X 0.0866
Cv 0.0424
Cs 0.0852
Ck -0.5622

Tabel Perhitungan Curah Hujan Rancangan Metode Log Pearson


T (Thn) G KT Rerata Log X Slog X Log XT
2 0.0852 -0.014 2.0423 0.0866 2.0411
5 0.0852 0.847 2.0423 0.0866 2.1156
10 0.0852 1.292 2.0423 0.0866 2.1542
20 0.0852 1.699 2.0423 0.0866 2.1894
25 0.0852 1.781 2.0423 0.0866 2.1965
50 0.0852 2.100 2.0423 0.0866 2.2241
100 0.0852 2.389 2.0423 0.0866 2.2491
200 0.0852 2.656 2.0423 0.0866 2.2723
Uji Kesesuaian Distribusi

Pembagian kelas:
N (Jumlah data) = 11
K (Jumlah kelas) = 1 + 3,322 log N = 4
Peluang batas kelas (P) = 1/ K = 0.25

Tabel Peluang dan Nilai Batas Kelas untuk Distribusi Log Pearson Type III
P(%) Cs KT Rerata Log X Slog X Log X
20 0.0852 0.8471 2.0423 0.0866 2.1156
40 0.0852 0.2727 2.0423 0.0866 2.0659
60 0.0852 -0.2920 2.0423 0.0866 2.0170
80 0.0852 -0.8471 2.0423 0.0866 1.9690

Tabel Perhitungan Uji Chi-Kuadrat Untuk Distribusi Log Pearson

Nilai Batas Jumlah Data


No.
Sub Kelas ni ei
1 X ≤ 93.105 2.000 2.750
2 93.105 < X ≤ 103.999 4.000 2.750
3 103.999 < X ≤ 116.391 4.000 2.750
4 116.391 < X ≤ 130.511 1.000 2.750
5 X > 130.511 2.000 2.750
Jumlah 13.000 13.750

c2hitung = 2.659
K (jumlah kelas) = = 4.000
P (parameter yang terikat dalam agihan frekuensi) = 2.000
DK = K - (P + 1) = 1.000
Untuk : DK = 2 dan a = 5% dari Tabel C.9 diperoleh c2cr = 5.991
Ternyata c 2
hitung < c 2
cr : Distribusi Frekuensi Diterima
son Tipe - 3
(Log Xi - Log X)4 93.11 104.00 116.39
174123.102457 93.11 104.00
173953.321720 1 0 0 1
171629.678071 2 0 0 1
174855.415865 3 0 1 0
173699.644713 4 0 0 0
170172.423270 5 0 0 1
178019.680103 6 0 1 0
169158.590006 7 1 0 0
173382.943520 8 0 0 0
178440.634166 9 0 1 1
176479.441707 10 1 0 0
1913914.875598 11 0 1 0

g Pearson
XT Tabel 26. Interpolasi Nilai KT - Distribusi Log Pearson III untuk Koefis
110
Koefisien
131 1.01 1.05 1.11
143
G
155 99 95 90
157 -0.1 -2.400 -1.673 -1.292
168 0 -2.326 -1.645 -1.282
177
187 0.0852 -2.263 -1.621 -1.273

25%

X (mm)
130.51
116.39
104.00
93.11

(ni - ei)2 (ni - ei)2 /ei

0.563 0.205
1.563 0.568
1.563 0.568
3.063 1.114
0.563 0.205
2.659

usi Frekuensi Diterima


130.51
116.39 130.51
0 0
0 0
1 0
0 0
0 0
0 1
0 0
0 1
0 0
0 0
0 0

si Log Pearson III untuk Koefisien Kemencengan (Cs)


Waktu Balik (Tahun)
1.25 1.667 2 2.5 5 10 20 25 50
Peluang (%)
80 60 50 40 20 10 5 4 2
-0.836 -0.267 0.017 0.290 0.836 1.270 1.642 1.716 2.000
-0.842 -0.281 0.000 0.281 0.842 1.282 1.673 1.751 2.054

-0.847 -0.292 -0.014 0.273 0.847 1.292 1.699 1.781 2.100


100 200 1000

1 0.5 0.1
2.252 2.482 2.950
2.326 2.576 3.090

2.389 2.656 3.209


Tabel Perhitungan Parameter Statistik Metode Log Normal
No Xi Log Xi Log Xi - Log X (Log Xi - Log X)2 (Log Xi - Log X)3
1 109.137 2.0380 -20.4274 417.280604 -8523.977555
2 110.396 2.0430 -20.4225 417.077117 -8517.743243
3 129.270 2.1115 -20.3539 414.282124 -8432.265860
4 103.879 2.0165 -20.4489 418.157166 -8550.850556
5 112.306 2.0504 -20.4150 416.772893 -8508.425443
6 142.837 2.1548 -20.3106 412.519603 -8378.511835
7 84.069 1.9246 -20.5408 421.923785 -8666.645094
8 153.165 2.1852 -20.2803 411.288937 -8341.046501
9 114.740 2.0597 -20.4057 416.392776 -8496.787927
10 81.753 1.9125 -20.5529 422.422341 -8682.010736
11 93.156 1.9692 -20.4962 420.094563 -8610.345749
Jumlah 22.4654 4588.211910 -93708.610499
Rata-rata 2.0423
Slog X 0.0866
Cv 0.0424
Cs 0.1272
Ck 3.0288

Tabel Perhitungan Curah Hujan Rancangan Metode Log Normal


T p Kt Rerata Log X Slog X Log XT
2 0.5000 -0.0213 2.0423 0.0866 2.0405
5 0.2000 0.8351 2.0423 0.0866 2.1146
10 0.1000 1.2948 2.0423 0.0866 2.1544
20 0.0500 1.6805 2.0423 0.0866 2.1878
25 0.0400 1.8277 2.0423 0.0866 2.2005
50 0.0200 2.1221 2.0423 0.0866 2.2260
100 0.0100 2.4430 2.0423 0.0866 2.2538
200 0.0050 2.6035 2.0423 0.0866 2.2677

Uji Kesesuaian Distribusi

Pembagian kelas:
N (Jumlah data) = 11
K (Jumlah kelas) = 1 + 3,322 log N = 4
Peluang batas kelas (P) = 1/ K = 0.25

Tabel Peluang dan Nilai Batas Kelas untuk Distribusi Log Normal
P(%) Cv K Rerata Log X Slog X Log X
20 0.0424 0.8351 2.0423 0.0866 2.1146
40 0.0424 0.6629 2.0423 0.0866 2.0997
60 0.0424 0.5792 2.0423 0.0866 2.0925
80 0.0424 0.4955 2.0423 0.0866 2.0852

Tabel Perhitungan Uji Chi-Kuadrat Untuk Distribusi Log Normal

Nilai Batas Jumlah Data


No.
Sub Kelas ni ei
1 X ≤ 121.678 8.000 2.750
2 121.678 < X ≤ 123.725 0.000 2.750
3 123.725 < X ≤ 125.806 0.000 2.750
4 125.806 < X ≤ 130.199 1.000 2.750
5 X > 130.199 2.000 2.750
Jumlah 11.000 13.750

c2hitung = 16.841
K (jumlah kelas) = = 4.000
P (parameter yang terikat dalam agihan frekuensi) = 2.000
DK = K - (P + 1) = 1.000
Untuk : DK = 2 dan a = 5% dari Tabel C.9 diperoleh c2cr = 5.991
Ternyata c 2
hitung > c 2
cr : Distribusi Frekuensi Ditolak
(Log Xi - Log X)4 121.68 123.72
174123.102457 121.68
173953.321720 1 1 0
171629.678071 2 1 0
174855.415865 3 0 0
173699.644713 4 1 0
170172.423270 5 1 0
178019.680103 6 0 0
169158.590006 7 1 0
173382.943520 8 0 0
178440.634166 9 1 0
176479.441707 10 1 0
1913914.875598 11 1 0

Interpo
XT Koefisien
109.77 Variasi
130.20 (CV)
142.69
154.10 0.05
158.69 0.10
168.28
179.39 20% 40%
185.23 0.050 0.2081 0.4061
0.100 -1.6808 -0.7312

0.0424 0.4955 0.5792


25%

X (mm)
130.20
125.81
123.72
121.68

(ni - ei)2 (ni - ei)2 / ei


27.563 10.023
7.563 2.750
7.563 2.750
3.063 1.114
0.563 0.205
16.841

usi Frekuensi Ditolak


125.81 130.20
123.72 125.81 130.20
0 0 0
0 0 0
0 1 0
0 0 0
0 0 0
0 0 1
0 0 0
0 0 1
0 0 0
0 0 0
0 0 0

Interpolasi/Ekstrapolasi Nilai KT untuk Distribusi Log Normal


Peluang Kumulatif P(%) : P(X<=X)
50% 80% 90% 95% 96% 98% 99% 99.50%
Periode Ulang (Tahun)
2 5 10 20 25 50 100 200
-0.0250 0.8334 1.2965 1.6863 1.8356 2.1341 2.4570 2.6185
-0.0496 0.8222 1.3078 1.7247 1.8875 2.2130 2.5489 2.7169

50% 60% 80% 90% 95% 96% 98% 99% 99.50%


-0.0250 0.6042 0.8334 1.2965 1.6863 1.8356 2.1341 2.4570 2.6185
-0.0496 0.2184 0.8222 1.3078 1.7247 1.8875 2.2130 2.5489 2.7169

-0.0213 0.6629 0.8351 1.2948 1.6805 1.8277 2.1221 2.4430 2.6035


99.90%

1000
2.7476
2.8512

99.90%
2.7476
2.8512

2.7318
Durasi Hujan T= 9 jam

t (jam) It (mm/jam)

1 0.4807 R24
2 0.3029 R24
3 0.2311 R24
4 0.1908 R24
5 0.1644 R24
6 0.1456 R24
S 1.5155 R24

t (jam) Rt (mm/jam)
t (jam) Rt (mm/jam) T = 50 thn
181.53
1 0.4807 R24 1 87.27
2 0.1250 R24 2 22.68
3 0.0877 R24 3 15.91
4 0.0698 R24 4 12.67
5 0.0589 R24 5 10.70
6 0.0515 R24 6 9.35
S 0.8736 R24 S 158.58
0.550321208

Rt (mm/jam)
T = 100 thn
182.23
87.61
22.77 0.12495701
15.97
12.72
10.74
9.39
159.20

t (jam) 1 2 3 4 5
I (t) 87.27 22.68 15.91 12.67 10.70
6
9.35
Metode Rasional Jepang

Panjang sungai (L)=16754 m 16.745 km


Luas Das = 13963.8 ha 139.638 km2
Tinggi hulu 442.870
Tinggi hilir 330.001
112.869
1.Menghitung Kemiringan (S)
∆h S So
0.112869 0.007 0.000

Land Use Luas (ha) A C


Hutan laha kering kerapatan rendah 3449 0.5
Pemukiman 349.6 0.4
Pertambangan 749.2 0.7
Pertanian lahan kering 549.7 0.5
Pertanian lahan kering campur semak 5549.6 0.3
140.338
Sawah 449.8 0.15
Semak belukar 2249.2 0.7
Tambak 449.7 0.7
Tanah terbuka 169 0.3
Tubuh air 69 0.17
140.338

2. Menghitung C rata-rata menghitung nilai v dan menghitung waktu konsentrasi ( tc )

C V Tc Td
45.231 2.712 12.540 6.176

3.Menghitung debit periode ulang 50 tahun dan 100 tahun (Angka Xt dari uji metode log pearson 3)

T Xt I Q
2 109.915 7.06 9946.52
50 167.539 10.76 15161.05
100 177.475 11.40 16060.25
200 187.179 12.02 16938.34
LxC
1724.5
139.84
524.44
274.85
1664.88
67.47
1574.44
314.79
50.7
11.73
6347.64

waktu konsentrasi ( tc )

Cs
0.802
Metode Weduwen

Panjang sungai (L)=16754 m 16.745 km


Luas Das = 13963.8 ha 139.638 km2
Tinggi hulu 442.870
Tinggi hilir 330.001
112.869
1.Menghitung Kemiringan (S) dan taksir (t)
∆h S t
0.112869 0.007 0.975

2. Menghitung ß, R, C, dan Q
ß R C
272.439 27.897 7.580

3. Menghitung Nilai Taksir


tk
0.975

4. Menghitung Debit periode ulang (Angka r dari Xt dari uji metode log pearson
3)

T Xt r
2 109.915 54.262
50 167.539 82.709
100 177.475 87.614
200 187.179 92.405
Q
8044663.50129106

Xt dari uji metode log pearson

Q
1818825.63908164
2772356.26400759
2936784.74088549
3097352.15198313
Panjang sungai (L)=16754 m 16.745 km
Luas Das = 13963.8 ha 139.638 km2
Tinggi hulu 442.870
Tinggi hilir 330.001
112.869
1.Menghitung Kemiringan (S) dan taksir (t)
∆h S t
0.112869 0.007 4.138

2. Menghitung C dan ß
C ß
0.409 2.078

4. Menghitung Debit periode ulang (Angka r dari Xt dari uji metode log pearson
3)

T Xt r q
2 109.915 88.522 5.9425575039464
50 167.539 134.930 9.0579801418511
100 177.475 142.933 9.5952090318214
200 187.179 150.747 10.119822855821
Q
704.564333383
1073.936556138
1137.631743687
1199.831257776
A= 139.64 km2
L= 16.75 km
C= 0.80
a= 2.00
tg = 1.371 jam
tr = 1.028 jam qa = 1.3887
Tp = 2.194 jam qd1 = qp x 0.3^
T0.3 = 2.742 jam qd2 = qp x 0.3^
Tp + T0.3 = 4.936 jam qd3 = qp x 0.3^
Tp + 2.5 T0.3 = 9.050 jam
9.153 m /det 2.72241968
3
qp =

Waktu (jam) q (m3/detik)

0 0.000
1 1.389
2 7.330
2.194 9.153
3 6.425
4 4.142
5 2.695
6 2.011
7 1.501
8 1.120
9 0.836
10 0.669
11 0.537
12 0.431
13 0.346
14 0.278
15 0.223
16 0.179
17 0.144
18 0.115
19 0.093
20 0.074
21 0.060
22 0.048
23 0.039
24 0.031
Kala Ulang = 50 Tahun
Waktu q Curah Hujan Jam-jaman (mm)
1 2 3 4 5
(jam) m3/dt.mm-1 87.270 22.680 15.910 12.670 10.700
0 0.000 0.000
1 1.389 121.192 0.000
2 7.330 639.657 31.496 0.000
3 6.425 560.694 166.236 22.094 0.000
4 4.142 361.462 145.715 116.614 17.595 0.000
5 2.695 235.204 93.938 102.219 92.866 14.859
6 2.011 175.523 61.125 65.897 81.402 78.427
7 1.501 130.986 45.616 42.879 52.478 68.746
8 1.120 97.750 34.041 31.999 34.147 44.318
9 0.836 72.947 25.404 23.880 25.483 28.838
10 0.669 58.356 18.958 17.821 19.017 21.521
11 0.537 46.855 15.166 13.299 14.192 16.060
12 0.431 37.621 12.177 10.639 10.591 11.985
13 0.346 30.206 9.777 8.542 8.472 8.944
14 0.278 24.253 7.850 6.859 6.803 7.155
15 0.223 19.473 6.303 5.507 5.462 5.745
16 0.179 15.635 5.061 4.421 4.385 4.613
17 0.144 12.554 4.063 3.550 3.521 3.704
18 0.115 10.079 3.262 2.850 2.827 2.974
19 0.093 8.093 2.619 2.289 2.270 2.388
20 0.074 6.498 2.103 1.838 1.823 1.917
21 0.060 5.217 1.689 1.475 1.463 1.539
22 0.048 4.189 1.356 1.185 1.175 1.236
23 0.039 3.363 1.089 0.951 0.943 0.992
24 0.031 2.701 0.874 0.764 0.757 0.797

Kala Ulang = 100 Tahun


Waktu q Curah Hujan Jam-jaman (mm)
1 2 3 4 5
(jam) m3/dt.mm-1 87.610 22.770 15.970 12.720 10.740
0 0.000 0.000
1 1.389 121.664 0.000
2 7.330 642.149 31.621 0.000
3 6.425 562.878 166.896 22.178 0.000
4 4.142 362.870 146.293 117.054 17.664 0.000
5 2.695 236.120 94.311 102.604 93.233 14.915
6 2.011 176.207 61.368 66.146 81.724 78.720
7 1.501 131.497 45.797 43.041 52.685 69.003
8 1.120 98.131 34.176 32.120 34.282 44.484
9 0.836 73.231 25.504 23.970 25.583 28.946
10 0.669 58.584 19.033 17.888 19.092 21.601
11 0.537 47.038 15.226 13.349 14.248 16.120
12 0.431 37.767 12.225 10.679 10.632 12.030
13 0.346 30.324 9.816 8.574 8.506 8.977
14 0.278 24.347 7.881 6.884 6.829 7.182
15 0.223 19.549 6.328 5.528 5.483 5.766
16 0.179 15.696 5.081 4.438 4.403 4.630
17 0.144 12.602 4.079 3.563 3.535 3.717
18 0.115 10.119 3.275 2.861 2.838 2.985
19 0.093 8.124 2.630 2.297 2.279 2.396
20 0.074 6.523 2.112 1.844 1.830 1.924
21 0.060 5.238 1.695 1.481 1.469 1.545
22 0.048 4.205 1.361 1.189 1.180 1.240
23 0.039 3.376 1.093 0.955 0.947 0.996
24 0.031 2.711 0.878 0.767 0.760 0.800
x t^2.4
0.3646 t -0.800
0.2431 t -0.200
0.1823 t 0.350

HSS Nakayasu
9.20
8.80
8.40
8.00
7.60
7.20
6.80
6.40
Debit, q (m3/det)

6.00
5.60 qp = 2,518 m3/dt
5.20
4.80
4.40
4.00
3.60
3.20
2.80
2.40
2.00
1.60
1.20
0.80
0.40
0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Waktu, t (jam)
m) Total
800
6 Debit 775
750
9.350 m3/dt 725
700
0.000 675
121.192 650
625
671.153 600
575
749.024 550
Debit, q (m3/det)

641.386 525
500
0.000 539.086 475
450
12.984 475.360 425
400
68.532 409.237 375
60.072 302.328 350
325
38.727 215.278 300
275
25.199 160.872 250
18.805 124.377 225
200
14.034 97.046 175
150
10.473 76.414 125
7.815 60.734 100
75
6.252 48.741 50
25
5.020 39.135 0
4.031 31.422 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

3.236 25.229
2.598 20.257 Waktu, t (jam)
2.086 16.264
1.675 13.059
1.345 10.485
1.080 8.419
0.867 6.759

m) Total
6 Debit
9.390 m3/dt
0.000
121.664
673.770
751.951
643.882
0.000 541.182
13.040 477.205
68.825 410.847
60.329 303.522
38.892 216.127
25.307 161.505
18.886 124.866
14.094 97.427
10.518 76.714
7.849 60.973
6.279 48.933
5.041 39.289
4.048 31.545
3.250 25.328
2.610 20.336
2.095 16.328
1.682 13.110
1.351 10.526
1.085 8.452
0.871 6.786
Q50 Q100