. Fecha :
MANO DE OBRA
470103 OFICIAL HH 12.54 45.56 571.32 570.66
470023 OPERADOR DE EQUIPO PESADO HH 14.29 103.89 1,484.59 1,484.12
470041 OPERADOR DE PLANTA HH 14.29 1.45 20.72 20.68
470102 OPERARIO HH 14.29 73.15 1,045.31 1,038.57
470104 PEON HH 11.33 1,198.75 13,581.84 13,554.16
470032 TOPOGRAFO HH 14.29 46.77 668.34 668.09
17,372.13 17,336.28
MATERIALES
050100 AFIRMADO M3 26.00 763.53 19,851.78 19,851.87
390500 AGUA M3 10.00 152.74 1,527.40 1,527.32
040000 ARENA FINA M3 36.00 3.18 114.48 127.26
050104 ARENA GRUESA M3 26.00 115.03 2,990.78 2,990.79
130166 ASFALTO LIQUIDO RC-250 GLN 9.00 759.08 6,831.72 6,839.99
399095 BANNER GIGANTOGRAFIA SEGUN MODELO M2 24.00 30.60 734.40 734.40
200101 CEMENTO ASFALTICO PEN 60/70 Y 85/100 GLN 12.50 4,772.10 59,651.25 59,651.25
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 17.80 7.50 133.50 133.50
021094 CLAVOS DE ALAMBRE PARA MADERA C/C DE 4" KG 4.50 2.00 9.00 9.43
375373 CORDEL ROLLO DE 50 M. PZA 17.50 6.36 111.30 127.26
544480 DISOLVENTE XILOL GLN 27.50 0.57 15.68 15.55
030348 FIERRO CO. FY=4200 KG/CM2 (GRADO 60) KG 3.50 50.00 175.00 175.00
539002 KEROSENE INDUSTRIAL GLN 12.00 143.16 1,717.92 1,717.95
430103 MADERA TORNILLO P2 4.50 33.25 149.63 149.63
530002 PETROLEO DIESEL # 2 GLN 12.50 774.67 9,683.38 9,684.18
050003 PIEDRA CHANCADA DE 1/2" M3 50.00 74.36 3,718.00 3,717.92
544570 PINTURA DE TRAFICO GLN 44.50 30.83 1,371.94 1,371.71
301430 REP. Y MANT. DE CONEX DOM. DE AGUA Y DESAGUE (3% C.D.
GLB ASF. 3,247.64 1.00 3,247.64 3,258.64
490534 SEGURIDAD EN OBRA MES 600.00 1.50 900.00 900.00
320198 TRANSPORTE MEZCLA ASFÁLTICA DE PLANTA - OBRA M3 25.00 190.88 4,772.00 4,772.09
370247 WINCHA DE 50M. UND 85.00 1.28 108.80 127.26
300201 YESO DE 28 Kg BOL 14.00 15.90 222.60 254.52
118,038.18 118,137.52
S10 Página : 1
. Fecha :
53,554.68 53,616.47
0.00
SUB-TOTAL 0.00
189,818.22
La columna parcial es el producto del precio por la cantidad requerida; y en la última columna se muestra el Monto Real que se está util
izando