You are on page 1of 3

QUOTATION

PO No.: 023-0000598 Valid Until: 30 Days


DATE: July 07, 2023
TO: Building J6 / J7 / J8
PROJECT LOCATION: Jolly Industrial Park, Parulan, Plaridel, Bulacan
TITLE: Installation of Wet Standpipe System
AMOUNT: One Million Four Hundred Fifty-One Thousand Five Hundred Pesos Only
(PHP 1,451,500.00)

I. SCOPE OF WORK

1. To supply and install a new AUTOMATIC FIRE SPRINKLER SYSTEM


complete with an alarm valve with trimmings, system pipes and supports,
testing, and flushing connection.

2. Supply, fabricate, and install piping, fittings, hangers, and supports to be


tapped to the nearest fire protection line indicated on the drawings.

3. To supply and install Indoor Fire Hose System complete with system
pipes, fittings, and supports fire hose cabinet with standard accessories,
and isolation/control valve.

4. To provide a full-time competent and trained project engineer and


technician to technically supervise and participate during all of the
adjustments and tests for the system.

5. To prepare and submit design drawings that locate all components of the
isolation valve, and fire hose cabinet, including piping sizes, supports, etc.

6. To conduct hydrostatic pressure tests of all new water-based system


pipes. Pipes shall be tested hydrostatically at not less than 150 psi of
pressure for two hours.

7. Prepare and submit a complete sequence of system operations detailing


all devices, valve functions, fire hose operation, and water discharge for
each system.
8. Conduct operational training prior to the final acceptance of each shift of
the owner’s personnel. Each training session will include system valve
and emergency procedures.

9. Sixty (90) – Ninety (120) Working Days

10. To warranty the system within one (1) year against defective workmanship

Summary of equipment to be installed


AUTOMATIC FIRE SPRINKLER SYSTEM
Item Particulars Qty Unit Price
1 Horizontal Fire Pump Non-UL driven by Electric Motor
delivering 250GPM against 100 PSI With 25HP, 230 1 Set 210,000.00
V, 3phase Including standard accessories
2 Control Panel 1 Set 30,000.00

BI Pipe 3” Schedule #40 32 Lot


3 BI Pipe 2” Schedule #40 28 Lot 132,500.00
BI Pipe 1 ½” Schedule #40 32 Lot
BI Pipe 1 ¼” Schedule #40 26 Lot
BI Pipe 1” Schedule #40 34 Lot

4 Sprinkler Heads ( Pendent) 90 Pcs 162,000.00


Fire Hose Cabinet complete with standard
accessories
 Angle Hose Valve
5  Adjustable Fire Fog Nozzle 3 Sets 105,000.00
 Lock Nipple
 Fire Hose 100 ft Single Jacket
 Fire Hose Rack
6 Brackets and supports (Angle Bar, Threaded Rod & 588 Sets 54,000.00
etc.. )
7 Fittings (Coupling, Elbow, Reducer, Tee & etc…) 262 Sets 68,000.00
8 Special Fittings (Gate Valve, Check Valve & OS & Y 6 Lot 58,000.00
Valve)
9 Fire Department Connection 1 Set 12,500.00
10 Consumables (Welding rod, Cutting Disc, Rigid Oil 1 Lot 35,000.00
etc…)
11 Mobilization and demobilization, safety and health 1 Lot 38,500.00
requirements, housing and accommodation
12 Engineering and design, Design Sign and Seal 1 Lot 60,000.00
Professional Mechanical Engineer
13 Labor, Tools, and Equipment 1 Lot 350,500.00
14 General Requirement Installation Clearance 1 Lot 30,000.00
15 Testing and commissioning 1 Lot 25,500.00
16 Water Tank 3,000 Gal. Galvanized 1 Lot 80,000,00
TOTAL AMOUNT AUTOMATIC FIRE SPRINKLER SYSTEM PHP 1,451,500.00

 Owner should provide a power supply in the Pump Room.


 Owner should provide a pump room or safe place for the pump.

Mode Of Payment
50% Down Payment upon signing of Contract
40% Progress Billing
10% Upon Turn Over

We will assist you until the release of your Fire Safety Inspection Certification (FSIC)

JITZMOEY FIRE PROTECTION

Ms. Michelle B. Delos Reyes


General Manager

Approved By: _______________________


Client

You might also like