Creer ass
Project COAT La Paz - Installation / Training
Visit 28. Sept. 2009 to 11.Oct. 2009
State of Project 10th Oct. 2009
‘Te flowing measurement sos have been Viste and put Ito operatonInduding dtaransmission
‘ohiOGt [Au Roma, pasarela desde Calsco
[Av Roma, Pasarela del Perodsta
chonivs | Costanera
cnoni0oé | Debs oe a pasarla averse jan
‘chni001 | 80 metos anes el puere ngreso a pa
‘nuahiodt [Anis de Confuencia con rio La Paz
ph00t_| Ro La Paz, Pusnte Amor ee Dios
‘The sation CHOHIO03 has boon exonded by 2 addioal radar sensors and now ncudes CHOHIOOS
and ACHHIODS
“The following sts have boon visted and put nto operation vou xing detatransmisson:
oni |Terava eis de x banco del estado
Tuani00s | Apa, comzleo aeprivs
ani0o2 | Puente ds Auausams
“The flowing ss have been vite and prepared for operation a far as poste, nal hese cases
eerie mainepower was missing, Some of them are nol equpped wiha sensor yet.
“apndoi_ [paw ara clo 166 a
phon: ipa, confuerca cone Soca x
iso | Anes de Gontvenca con eli a Paz ol
‘pnoot Ro Pas, Pueie Aor ge Die a
si002_[Bueie Patten a
38
Recommendations aa
1. The fate chica maintenance shouldbe done by Corinex covered by a maintenance
contact. This ershurs Tat and professional response incase of echnical rouble or case
‘ot esanges within the system
“This might nt conta requred frequent standard recedes ke cleaning of instruments or
recalbraton a wells keeping the ses Ing proper condition ‘or good measurement resus.Grey oi surs
‘3. The serv of the contra offco COAT needs tobe equipae wih an unntervotbe power
‘supply (UPS) a soon as possbie, The UPS needs be connected ithe compute ina way,
‘hat aulo-shutdoun pose
2 gamete toe netd be cre ts soe pope manera. Thestencosetiy EE |
Hai nin enetelsoatehegaserwaeen mrss ncceine Seed
‘She ane bere hasnt heel gigs On wih te cotans ner" "BBE
sia icine satpro aesee eet
Pa
i
4 The server shoud be used for dat-aequisiton ely. Teretoreal not necestary stare
Should be done
‘5. Witin the stat of COAT a person must be decided who wil beresponstie and abe for
Gealing wh the server and te softrare
8. The na wining at SEBA In Germany should be done ater flotation ef the nti and
‘maybe afer some aditona tne & weeks) or ealecing expeiences wth operating the
system. The persons sent to SEBA shoud have knowledge in database, processing Gata and
Inasieeectoncs fr Handing he equlpmant Good krawledgein Engi language
recorsary
tree ot 9/7 ere
/f ‘SEBA-Hydrometrie GmbH