Application of Part M 2010 to existing buildings other than dwellings
Existing building
Y
Isitan
ontenson? Je! [is ean nstone butcing? }- Yella an onension?
hotel, hostel or guest
building, institutional
building, place of
assembly, shop’,
shopping centre?
Do the works involve a
Material Change of Use|
(MCU) to a day centre,
Building Regulations.
the extension i.e. people using the
extension.
N__ | approach and access or modify the
= The extension itself must comply with the
~ Adequate sanitary facilities complying with
Part M must be provided for people within
- Ist practicable" to provide an independent
existing approach and access to the
Is the building subject
to the National
Monuments Acts?
Building Regulations
do not apply
ry extension that complies with Part M? N
Does the MCU apply
the whole building?
N y Do the works or building involve N
Part M.
The building must comply with
Is it practicable to modify or
provide an approach and access
to the whole building that
complies with Part M?
a material alteration?
Y
The Building Regulations apply
to any alteration subject to the
requirements of Part A, B or M
Does the MCU apply
to only part of the
building?
ee
Is it practicable” to
apply Section 1 of
TGD M2010?
~ Sanitary facilities
provided in, or in
~ That part of the building
must comply with Part M.
connection with that part
‘Apply Section 1 of
TGD M2010
of the building must Explanation to be given in
comply with Part M DAC application to
Is it practicable* to modify or Building Control
provide an approach and ‘Subject to the outcome of
‘access to that part of the the DAC process a
building that complies with (partial) dispensation or
Part M? relaxation may be required
NoTES:
from Building Control"
There should be no
greater contravention
of the Building
Regulations
‘Apply Section 2 of
TGD M2010
y N
Dispensation or relaxation
(or partial dispensation or
relaxation) from Part M
required from Building
Controt
1. The adoption of an approach other than that outlined in the guidance is not precluded provided the relevant
Requirements of the Regulations are complied with.
be applied to the flowchart separately
Many projects may involve an extension, a material change of use and a material alteration. Each of the these should
Refer to 0.6 ‘Application of Part Mand 0.8 ‘Existing buildings’ in TGD M 2010 for further information,
Part M does not apply to the part(s) of a building used solely to enable inspection, repair or maintenance.
‘shop (which is not ancillary to the primary use of the building).
Refer to 0.7 for the determination of ‘practicability’ in TED M 2010
For clarity tis flowchart does not incorporate the DAC process. Refer to the Building Control Regulations,