You are on page 1of 1

ANALISA PERHITUNGAN BOX CULVERT

UKURAN 2000x2000mm

Beban Gandar = 21 ton


Beban Roda P = 10.5 ton
Beban Roda P = 102.9 kN
P

q1 h H := 2.0 m
S := 2.0 m
tA
tA = tB = tc := 0.2 m
h := 3 m
g := 18 kN
H f := 30 o
KA := 0.3

q1 := 54 kN/m
tC
tB q2 := 13.2 kN/m
q2
tC S

q H1 := 2.2 m
S1 := 2.2 m
A B H1=S1=L ; L=span
ii i
L := 2.2 m

H1 Tinjau bentang paling extreem:


S1
M (+) maks di bentang AB:
M(+) DL := (1/14).q1.L2
D C 18.67 kN.m
M(+) LL := (7/40).P.L
q' = q 39.62 kN.m

M (-) maks di bentang AB:


M(-) DL := (1/10).q1.L2
fc = 33 MPa 26.14 kN.m
fy = 500 MPa M(-) LL := (3/40).P.L
fy = 400 MPa 16.98 kN.m

Penampang di tengah bentang AB (pot i) Penampang di tumpuan bentang AB (pot ii)


Tebal pelat (t) = 140 mm Tebal pelat (t) = 140 mm
Diameter tulangan Utama = 8 mm Diameter tulangan Utama = 8 mm
Jarak tulangan = 150 mm Jarak tulangan = 150 mm
Diameter tulangan Exstra = 13 mm Diameter tulangan Exstra = 13 mm
Jarak tulangan = 200 mm Jarak tulangan = 200 mm
Diameter tulangan Ring = mm Diameter tulangan Ring = mm
Jarak tulangan = 1 mm Jarak tulangan = 1 mm
Selimut beton = 25 mm Selimut beton = 25 mm
d = 111 mm d = 111 mm

Mn = f As.fy.d.(1-Ast.fy/(1.7.b.d.fc)) Mn = f As.fy.d.(1-Ast.fy/(1.7.b.d.fc))
f = 0.8 f = 0.8
Mn := 43.43 kN.m Mn := 43.43 kN.m
M(+) ult = 1,2.M(+)DL + 1,6M(+)LL M(+) ult = 1,2.M(-)DL + 1,6M(-)LL
M(+) ult := 85.79 kN.m M(+) ult := 58.53 kN.m

You might also like