S
KERAJAAN MALAYSIA
BORNEO HIGHWAY
S PDP SDN. BHD.
PROJECT DELIVERY PARTNER
PELAKSANAAN PROJEK LEBUHRAYA
PAN BORNEO SABAH
MENAIKTARAF JALAN DARI
SEPANGGAR KE BULATAN BERUNGIS
(Tender No. : BHP/SBB/WP08/T11/2017)
TENDER DOCUMENT
VOLUME II OF IV
PROJECT DELIVERY PARTNER
BORNEO HIGHWAY PDP SDN. BHD.
RIVERSON SUITE, BLOCK B2,
NO. B2-8-1, LORONG RIVERSON @ SEMBULAN
OFF JALAN COASTAL,
88100 KOTA KINABALU, SABAH
TEL: 088-276750/088-27799 1/088-277992
FAX: 088-277993VOLUME II
CCOo8i900
oo
OQ
‘BORNEO HIGHWAY POP SON. BHO PACKAGE WOR: SEPANGGAR KE BULATAN BERUNGIS
PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH
MENAIKTARAF JALAN DARI SEPANGGAR KE BULATAN BERUNGIS
[TENDER NO. : BHP/SBB/WP08/T11/2017 ]
‘TABLE OF CONTENTS
VOLUME |
VOLUME IA
‘A Checklist for Essential/ Supporting Documents
(Technical Submission)
B Instructions to Tenderers
C Brief Description of Works
D Form of Contract Agreement
E Form of Letter of Acceptance (Draft)
F Conditions of Contract and Appendices to Conditions of Contract
Appendix1 - Particulars of Conditions of Contract
Appendix2 - Corporate Guarantee Form
Appendix3 - ‘Banker's Guarantee Form for Performance Bond
Appendix4 - Banker's Guarantee Form for Advance Repayment Bond
Appendix - Form of Sub-Contract between Works Package
Contractor and Nominated Sub-Contractor (Not Applicable)
Appendix6 - Form of Supply Contract between Works Package
Contractor and Nominated Supplier (Not Applicable)
Appendix7 - Risk Management Plan
Appendix8 - Environmental, Health and Safety Management Pian
Appendix - Quality Assurance Plan
‘Appendix 10 - Manufacturer's Warranty Form
Appendix 11 - Addendum to Conditions of Contract
Appendix 12 - _PDP’s Master Insurance Policy
- Contractors’ All Risks and Comprehensive General Liability
Insurance Policy and Terms
- Workmen's Compensation Policy and Terms
TABLE OF CONTENTS oc 114€00000
BORNEO HIGHWAY POP SDN. BHO PACKAGE WPOd:: SEPANGGAR KE BULATAN BERUNGIS
G Schedule of Particulars (Technical Submission): -
ScheduleA - Declaration by The Tenderer on Information and Documents
Provided
ScheduleB - General Particulars of Tenderer's Background
ScheduleC - Technical Personnel and Site Organization Chart
ScheduleD - Main Construction Plant/Equipment in Possession
ScheduleE - Overall Construction Schedule
ScheduleF - Method Statements
ScheduleG - Particulars of Proposed Sub-Contractors and
Manufacturers/Suppliers
Schedule HH - Declaration of Non-Collusion
Schedule! - Non-Disclosure Agreement
ScheduleJ - Statement of Compliance
ScheduleK - Integrity Pact
ScheduleL - Letter of Declaration on GST Registration Status
ScheduleM - Litigation Form
ScheduleN - Proposed Bumiputera Participation
SchéduleO - Quality Assurance and Quality Control Plan
ScheduleP - Health, Safety and Environmental Plan and Policy
VOLUME IB
A Checklist for Essential / Supporting Documents
(Financial Submission)
B Schedule of Particulars (Financial Submission): -
ScheduleS - Financial Data
C Schedule St - —_Letter from Bank / Financial Institution on Financial
Capacity of the Tenderer
VOLUME IC
A Checklist for Essential / Supporting Documents
(Commercial Submission)
B Form of Tender
C Summary of Tender Sum
D _Preambles to Bills of Quantities,
“TABLE OF CONTENTS toc-20BORNEO HIGHWAY POP SON. BHD PACKAGE WPOB : SEPANGGAR KE BULATA,
amo300
A
B
Bills of Quantities: -
BillNo.1 = General Conditions and Preliminaries
BillNo2 - _Environmental Protection and Enhancement
BillNo.3 = ~—_—_Traffic Management and Control
Bill No.4 - Site Investigation Works |
Bil|No.5 = Demolition and Site Clearance
Bill No.6 * Earthworks
Bill No.7 : Geotechnical Works
BillNo8 Drainage Works
Bill No.9 : Roads and Pavings
BillNo.10 = —_Bridge Works
Bill No.11 : Interchange Works
BillNo12 - Street Lighting
Bil|No.13 - Miscellaneous Works
Bill N14 = Provisional Sums
‘Schedule of Daywork Rates
VOLUME II
Standard Specification for Road Works
Appendices to the Specification: -
Appendix S1 - Schedule of Fumiture, Equipment and Fittings
for the Site Supervision Team's Office
Appendix S1A- Equipments for the Site Suoervision Team
‘Appendix $2 - Vehicle for the Site Supervision Team
Appendix $3 - List of Laboratory Equipment
Appendix $4 - ‘Surveying Instruments for the Site Supervision Team's
General Requirements
General Health, Safety, Security and Environment (HSSE) Requirements
Materials of Malaysian Origin
Schedule of Routine Maintenance Works
VOLUME III
List of Drawings
Drawings
VOLUME IV
Soil Investigation Report
Sail Ivesoaion Report ssa} (Ete as Teer Table Documents On)
TABLE OF CONTENTS Tos. sade 1) ‘Addendum No,