You are on page 1of 5
S KERAJAAN MALAYSIA BORNEO HIGHWAY S PDP SDN. BHD. PROJECT DELIVERY PARTNER PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH MENAIKTARAF JALAN DARI SEPANGGAR KE BULATAN BERUNGIS (Tender No. : BHP/SBB/WP08/T11/2017) TENDER DOCUMENT VOLUME II OF IV PROJECT DELIVERY PARTNER BORNEO HIGHWAY PDP SDN. BHD. RIVERSON SUITE, BLOCK B2, NO. B2-8-1, LORONG RIVERSON @ SEMBULAN OFF JALAN COASTAL, 88100 KOTA KINABALU, SABAH TEL: 088-276750/088-27799 1/088-277992 FAX: 088-277993 VOLUME II CCOo8i 900 oo OQ ‘BORNEO HIGHWAY POP SON. BHO PACKAGE WOR: SEPANGGAR KE BULATAN BERUNGIS PELAKSANAAN PROJEK LEBUHRAYA PAN BORNEO SABAH MENAIKTARAF JALAN DARI SEPANGGAR KE BULATAN BERUNGIS [TENDER NO. : BHP/SBB/WP08/T11/2017 ] ‘TABLE OF CONTENTS VOLUME | VOLUME IA ‘A Checklist for Essential/ Supporting Documents (Technical Submission) B Instructions to Tenderers C Brief Description of Works D Form of Contract Agreement E Form of Letter of Acceptance (Draft) F Conditions of Contract and Appendices to Conditions of Contract Appendix1 - Particulars of Conditions of Contract Appendix2 - Corporate Guarantee Form Appendix3 - ‘Banker's Guarantee Form for Performance Bond Appendix4 - Banker's Guarantee Form for Advance Repayment Bond Appendix - Form of Sub-Contract between Works Package Contractor and Nominated Sub-Contractor (Not Applicable) Appendix6 - Form of Supply Contract between Works Package Contractor and Nominated Supplier (Not Applicable) Appendix7 - Risk Management Plan Appendix8 - Environmental, Health and Safety Management Pian Appendix - Quality Assurance Plan ‘Appendix 10 - Manufacturer's Warranty Form Appendix 11 - Addendum to Conditions of Contract Appendix 12 - _PDP’s Master Insurance Policy - Contractors’ All Risks and Comprehensive General Liability Insurance Policy and Terms - Workmen's Compensation Policy and Terms TABLE OF CONTENTS oc 114 €00000 BORNEO HIGHWAY POP SDN. BHO PACKAGE WPOd:: SEPANGGAR KE BULATAN BERUNGIS G Schedule of Particulars (Technical Submission): - ScheduleA - Declaration by The Tenderer on Information and Documents Provided ScheduleB - General Particulars of Tenderer's Background ScheduleC - Technical Personnel and Site Organization Chart ScheduleD - Main Construction Plant/Equipment in Possession ScheduleE - Overall Construction Schedule ScheduleF - Method Statements ScheduleG - Particulars of Proposed Sub-Contractors and Manufacturers/Suppliers Schedule HH - Declaration of Non-Collusion Schedule! - Non-Disclosure Agreement ScheduleJ - Statement of Compliance ScheduleK - Integrity Pact ScheduleL - Letter of Declaration on GST Registration Status ScheduleM - Litigation Form ScheduleN - Proposed Bumiputera Participation SchéduleO - Quality Assurance and Quality Control Plan ScheduleP - Health, Safety and Environmental Plan and Policy VOLUME IB A Checklist for Essential / Supporting Documents (Financial Submission) B Schedule of Particulars (Financial Submission): - ScheduleS - Financial Data C Schedule St - —_Letter from Bank / Financial Institution on Financial Capacity of the Tenderer VOLUME IC A Checklist for Essential / Supporting Documents (Commercial Submission) B Form of Tender C Summary of Tender Sum D _Preambles to Bills of Quantities, “TABLE OF CONTENTS toc-20 BORNEO HIGHWAY POP SON. BHD PACKAGE WPOB : SEPANGGAR KE BULATA, amo300 A B Bills of Quantities: - BillNo.1 = General Conditions and Preliminaries BillNo2 - _Environmental Protection and Enhancement BillNo.3 = ~—_—_Traffic Management and Control Bill No.4 - Site Investigation Works | Bil|No.5 = Demolition and Site Clearance Bill No.6 * Earthworks Bill No.7 : Geotechnical Works BillNo8 Drainage Works Bill No.9 : Roads and Pavings BillNo.10 = —_Bridge Works Bill No.11 : Interchange Works BillNo12 - Street Lighting Bil|No.13 - Miscellaneous Works Bill N14 = Provisional Sums ‘Schedule of Daywork Rates VOLUME II Standard Specification for Road Works Appendices to the Specification: - Appendix S1 - Schedule of Fumiture, Equipment and Fittings for the Site Supervision Team's Office Appendix S1A- Equipments for the Site Suoervision Team ‘Appendix $2 - Vehicle for the Site Supervision Team Appendix $3 - List of Laboratory Equipment Appendix $4 - ‘Surveying Instruments for the Site Supervision Team's General Requirements General Health, Safety, Security and Environment (HSSE) Requirements Materials of Malaysian Origin Schedule of Routine Maintenance Works VOLUME III List of Drawings Drawings VOLUME IV Soil Investigation Report Sail Ivesoaion Report ssa} (Ete as Teer Table Documents On) TABLE OF CONTENTS Tos. sade 1) ‘Addendum No,

You might also like