SAMSUNG SAMSUNG ENGINEERING CO., LTD.
ENGINEERING Sangiro6gi 26 Samsung GEC,
Gangdong-gu, Seoul, Korea,
SHIPPING REQUEST
1. Project Namie DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name Foster Wheeler Mexicana, S.A. de CV.
km. 48.5 Carr Fed. México-Pachuca, Tecamac Edo. De
Adress
México.
5. Contact Point (Vendo Pic Peronincharge) [CELSO RAMIREZ
Tel No '779-79-698-60
Fax No
Ewa [cramirez@axisfoster. com
Requisition no 28-203-1-0-H-RO-0012, 13/MBAB19
5. PION, PTTID-PROC-68-2020
6. Hem Descistontian Rem) PLATFORMS CONVECTION, EL. +1191042, BA-62002
7 Balance of 601 fr this hem (B01 Stas)
5. vole Value
No.of PKG “Packages
io. Gross Weieht Kes) 2,605 kas 7 Value (Cat 24,805 CBM
Sho tiame FWM, TECAMAC — [Perterred international
EDO. MEXICO [Seaport Aiport
1 Cargo Readiness Date 2/0420
14. Requested Shipping Mode Roadwa}
5. Requested Delay atthe Ste Before ‘13/04/2022
is. Datvery to Final Destination) Job Site
i Requested by (SiR BIBL Ha) za aba
ie Requested Date ISAMSUNG
amir
SAMSUNG ENGINEERING CO. LTD.
ENGINEERING Sangio G26 Sameung GEC,
Sangdong-g, Seoul, Korea
—,
SHIPPING REQUEST
1. Project Narre
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, S.A. de CV.
8. Contact Poin (Vendor)
Acdress
México,
Km. 48.5 Carr. Fed. México-Pachuca, Tecamac Edo. De
P.O (Parson in charge)
[CELSO RAMIREZ
Tel. No
[779-79-698-60
Fax NO.
EMail [ramirez @axisfosier.com
& Requisiion ra,
5. PIO No.
6, tem Description(Main item) LADDER RADIANT & CONVECTION, BA-62002
7, Balance of 801 for ths Rem (GOI Status)
[eieser ate
9. No. of KGe 7 Packages:
io. Gross Weight (Kes) 34S kgs 1, Volume (CBN) 17.425 CBM
FWM, TECAMAC _ |Perteres international
12, shipping Terms PC CaM sone aee
1a. Cargo Readiness Date OBTOSROE
14, Requested Shipping Mode Roadway
15. Requested Delvey at the Site Before 11/06/2022
16. Devery to (Final Destination). Job Site
17. Requested by (SIR 6 BABIN Se) 2s Bet
18, Requested Date
ave/2022SAMSUNG
emir
SAMSUNG ENGINEERING CO., LTD,
ENGINEERING ‘Sango 6g 26 Samstng GEG,
Gangdong-gu, Seoul, Korea
SHIPPING REQUEST
7. Project Name DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, SA. de C.V.
3. Contact Point (Vender)
Address
km. 48.5 Carr. Fed. México-Pachuca,
Mexico,
, Tecamac Edo. De:
LG (Person in charge)
CELSO RAMIREZ
Tel. No
[779-79-698-60
Fax, No
Eta [crams c
a Requnon ro 2B-203-1-0-H-RQ-0012, 13IMEABTO
5 PIO Ne. PTIID-PROC-56-2020
6._hem DeserpioniMah Ten) TOW PLATFORMS RADIANT, EL. +0552, BASZO02
7 Balance of 801 for is ter (BOI Sa)
3 Invoice Value
[No.of PGs 7 Packages:
0. Gross Weight Ras) 2236 kgs 7 Voume (CaM) 58.172 COM
FWM, TECAMAG _|Perteredinerrational
[cere tems EDO, MEXICO [Seaport /Airpor
F5.Garge Rendness Date PATO
re Requested Shipping Mode Roadwa}
8, Requested Devry at he Ste Before 25/03/2022
6. Devry o (Final bestnaton Job Site
7 Requested by GREE BBEN AM Was a
i Requered Dat 26/002,SAMSUNG SAMSUNG ENGINEERING CO.,LTD,
ENGINEERING Sangiro 6) 26 Samsung GEC,
Gangdong-gu, Seoul, Korea
al
SHIPPING REQUEST
1 Project Name DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name Foster Wheeler Mexicana, S/A. de C.V.
km. 48.5 Carr. Fed. México-Pachuca, Tecamac Edo. De
Address :
México
‘8 Contact Pont (Vanden) P.LG Parsonin charge) [CELSO RAMIREZ
Tel. No [779-79-698-60
Fax. No
E-Mail amie:
_Requiafon no 2B-203-1-0-H-RQ-0012,13/MBAGTO
5. PIO No. PTHID-PROC-68-2020
6. tem Deseaipion(iain Rem INTERMEDIATE PLATFORMS RADIANT, EL, +109.812, BA-62000
7 Balance of BO fortis item (BOI Status)
8. Invoice Value
[No of PKGs Packages
10, Gross Weight (Kos) 354 kgs 1, Volume (5M) 713.059 CBM
FWM, TECAMAC _|perered international
2. Shipping Terms, EDO. MEXICO [Season Amen
13. Cargo Readiness Date 2aT03I202
14. Requosted Shipping Mode Roadva
16. Requested Deivery atthe Ste Before 25/03/2022
16. Daivery to (Final Destination) Job Site
17. Requested by (SIR @5 SHAAN Ae) asta at
2610372022
16. Requested DateSAMSUNG
‘SAMSUNG ENGINEERING CO,, LTD.
ENGINEERING
Sanglro 6g 26 Samsung GEC,
Gangdong-gu, Seout, Korea
«nir
SHIPPING REQUEST
Pees Name DOS BOCAS NEW REFINERY PROJECT (P2)
2, Vendor Nar Foster Wheeler Mevicana, SA. de C.V.
a km. 48.5 Carr. Fed, Mexico-Pachuca, Tecamac Edo, De
México
inc onde P16 Peronin chee) [CELSO RAMIREZ
Tel No [779-79-608-60
Fax No
eal ramitez @axistosier.com
7 Requailon ro 28-203-1-0-H-RO-0012,13GAGTO
5. PIO Na PTHID-PROG-56-2020
tem Description Ten) ROOF PLATFORMS RADIANT, EL. +116.071, BA-E2002
7. Balanes of BO or is Rom GOT San)
2. noice Vale
a No.of KGS T Packages
ic Gross Wah Ran B39 kgs 77: Veta (CBW 58879 CBM
FWM, TECAMAG Pererad iteration!
"2 Snpena Terms EDO. MEXICO |Seapon /Atpot
7, Cargo Readnase Date FETOATIOR
i Reqvstee Shping Made Roadway
is, Requested Diver ath Sto Before 27f04ro022
16: Devry to Fn Destnatin) Job Site
17. Requested by (SR 4 SUMAN BD) are Ber
a: Requested Dae 2EDATIOR
1SAMSUNG ‘SAMSUNG ENGINEERING CO.,LTD,
ENGINEERING ‘Sangiro 8gil 25 Samsung GEC,
Gangdong-gu, Seoul, Korea
SHIPPING REQUEST
4. Project Name DOS BOCAS NEW REFINERY PROJECT (P2)
2 Vendor Name Foster Wheeler Mexicana, SA. de C.V.
sues km. 48.5 Carr. Fed, México-Pachuca, Tecamac Edo, De
Mexico
i ada hl Vdd PIG Pesonin rae) [CELSO RAMIREZ
Tel. No. |779-79-698-60
Fax No
EMail jamie@axistosien. com
7 Reauailon ro
ae
8. tem Description(Main Item) STACK PLAFORMS, EL. +125.724, BA-62002_
7 Balance of 801 fr this Item (601 Status)
3. Invoice Value
9. No. of PKGs. 7 Packages
0, Gross Weight os) T7688 KE 1. Volume (GBM) 38.679 CBM
FWM, TECAMAC _ pestered international
EDO. MEXICO | Seaport / Airport
12. Shipping Terms
f3. Gargo Readiness Date TAOBAO:
14, Requested Shipping Mode Roadway
15. Requested Delvery at the Ste Betore 43/05/2022
6. Delvery to (Final Destination) Job Site
17. Requested by (SIR BH MAI 44) Has Be
18, Requested Date (04/05/2022SAMSUNG
ENGINEERING
ems
‘SAMSUNG ENGINEERING CO.,LTD.
‘angio 8gil28 Samsung GEC,
Gangdong-gu, Seoul, Korea
SHIPPING REQUEST
1. Project Name.
2. Vendor Name
Foster Wheeler Mexicana, S|A, de C.V.
DOS BOCAS NEW REFINERY PROJECT (P2)
‘3 Contact Point (Vendor)
adress
km. 48.5 Carr. Fed. México-Pachuca,
México,
Tecamac Edo. De
PIL [Person in charge)
[CELSO RAMIREZ
Tel. No [779-79-698-60
Fax No
EMail cramirez@axisfosi
a Requistion
2B-203-1-0-H-RQ-0012,13/MBAGTS
5 PIO No.
PTIID-PROC-58-2020
6, lem Deseripion(Main Rem)
‘STACK PLAFORMS, EL. +129.642, BAG2002
7. Balance of BOI for this Rem (BOI Status)
8. Invoice Value
fo. No. of KGS
7 Packages:
10. Gross Weight (G8)
Bad kgs
7. Volume (CBM)
12. Shipping Terms
FWM, TECAMAC
Pertorred International
EDO. MEXICO [Seaport / Airport
[13 Garga Readiness Date TATOS/2OD2
fi Requested Shipoing Mode Roadway,
15. Requested Delivery at the Sle Before 13/05/2022
6. Delivery to (Final Destination) Job Site
17. Requested by (SIR SH Baan BB) Aas BetSAMSUNG
ENGINEERING
«ena
SAMSUNG ENGINEERING CO,, LTD.
‘angio 6gil 26 Samsung GEC,
Gangdong-gu, Seoul, Korea
—
SHIPPING REQUEST
5
1. Project Name
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, SA. de C.V.
3, Contact Poin (Vendor)
Address
km. 48.5 Carr. Fed. México-Pachuca,
Mexico,
, Tecamac Edo. De
ilG (Porson in charge)
CELSO RAMIREZ
Tol. No
[779-79-698-60
Fax Ne
Ell [otamite@axistoster. com
a Requiation no
5 PION
6. Item Deseription(Main Item) STACK PLAFORMS, EL. +134.042, BA-62002_
7. Balance of BOI for this em (001 Saas)
8. Invcies Vale
[9__No. of PKG. 1 Packages
io. Gross Weight Kas) Baa Kas 1. Vole (66%)
FWM, TECAMAC _ |Perterred international
2. shipeing Terms Soe ee
Fi Cargo Rescness Date THOS
fr Requested Spring Mode Roacval
i. Requested Defvery athe Ste Before 13/05/2022
16: Doivory to (Final Destinator) Job Site
7. Requested by (SiR BY BUEN Ba Bales a
fs Requested Date (470572022SAMSUNG ‘SAMSUNG ENGINEERING CO.,LTD,
ENGINEERING Sangiro 6gil28 Samsung GEC,
Gangdong-gu, Seoul, Korea
—
=e]
SHIPPING REQUEST
1 Pigjact Name
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, SA. de CV.
km. 48.5 Carr. Fed. México-Pachuca, Tecamac Edo. De
Ares
Mexico
3, anvaet Pat (vend P.LG (Personin charge) [CELSO RAMIREZ
Tel. No 779-79-698-60
Fax No
E-Mal [cramirez@axisfoster com
Regus na
5_ PIO No.
16. tem Description ain Rem) STACK PLAFORMS, EL. +138.442, BA-62002
7. Balance of 801 or this lem (BOI States)
Invoice Value
No. of KGS: i Packages
10, Gross Weight (Ke) 765 KGS 17 Volume (68M)
FWM, TECAMAC |porerasinemational
2 share Teas EDO. MEXICO |Seapont/Atport
13, Cargo Readiness Date THOS
14. Requested Shipping Mode Roadway
15. Requested Delivery atthe Site Before 13/05/2022
18. Delvery to (Final Deatnation) Job Site
17. Requested by (SiR S¥ BUAeM GB) was oe
6: Requested Date
(04/05/2022SAMSUNG ‘SAMSUNG ENGINEERING CO, LTD.
ENGINEERING ‘angio 6g 26 Samsung GEC,
Gangdong-gu, Seoul, Korea
SHIPPING REQUEST
1. Project Name
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, SA. de C.V.
km. 48.5 Carr. Fed, Méxioo-Pachuca, Tecamac Edo. De:
Adios
Mexico
8. Contact Point (vendo) P.LG (Person neharge) _ [CELSO RAMIREZ
Tel No 779-79-698-60
Fax No
E-Mal [oramiter@axistoster. com
4, Requlstion re.
5. PIO No.
6. tem DescripiontNan Kem ‘STACK PLAFORMS, EL, #143.700, BAS2002
7 Balance of BO fr this tem (BOI Status)
8. invoice Valve
Jp. No. of KGS: 7 Packages
10. Gross Weight Kes) aa kgs “Value (GaN
FWM, TECAMAC |pertered international
12. Shipping Terms ECONO eee
13. Cargo Readiness Date TH05/202
4, Requested Shipping Mode Roadway
15. Requested Delivery at the Ste Before 43/05/2022
15. Delvery to Final Destination)
17. Requested by (SR &¥ Balai BY)
Job Site
18, Requested Date
Bes BS
(04/05/2022SAMSUNG
ENGINEERING
«nar
‘SAMSUNG ENGINEERING CO.,LTD,
‘Sangito 6gi 26 Samsung GEC,
Gangdong-u, Seoul, Korea
SHIPPING REQUEST
1 Project Name:
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, S.A, de C.V.
km. 48.5 Carr. Fed. México-Pachuca,
Tecamac Edo, De
Address ee
41 Contact Point (vend) PLC (Personincharge) [CELSO RAMIREZ
Tel. No [779-79-698-60
Fax No
Eel jamire7@axisfoster.com
4. Regulation no
5. PIO No,
6_tom Description Main Ron ‘STACK PLAFORMS, EL. +149,700, BA62002
7 Balance of BO for this tem (BOI Stats)
8. loves Valve
fs. No. of PKGs (Packages
10. Gross Weight (Kas), ATO KGS Volume (680)
2. Shioning Tome FWM, TECAMAC parted international
EDO. MEXICO | Seaport /Arpon
is Garge Readiness Date THTOS/2022
ia Requested Shipping Mode Roadway
15, Requested Delvery athe Sie Bofors 13/05/2022
16. Dolvary to Final Destination) Job Site
17, Requested by (Smo BUA BB) Zaks Bb
fis, Requested Date
(OAO52O2SAMSUNG
ENGINEERING
esr
‘SAMSUNG ENGINEERING CO., LTD,
SHIPPING REQUEST
‘Sangito 6gil 26 Samsung GEC,
Gangdong-gu, Seoul, Korea
1. Project Name
DOS BOCAS NEW REFINERY PROJECT (P2)
2. Vendor Name
Foster Wheeler Mexicana, SA. de C.V.
3. Contact Point (Vendor)
Address
Km. 48.5 Carr. Fed. México-Pachuca, Tecamac Edo. De
Mexico.
PLC (Person in charge) |CELSO RAMIREZ
Tel, No 779-79-698-60
Fax No
E-Mail [oramirez@axisfoster.com
& Requistion na.
5. PIO No.
6. tem Description(Main Iter)
TADDER STACK, EL. #105 124 120 G42, TSAUAI TSE AIDES TOO |
+148. 700 BA-62002 _
7, Balance of 801 for this Hem (BOI Status)
8. Invoice Value
[a_ No. of PKGs
7 Packages
10. Gross Weight es) 648 kgs 7 volume (CBM) 30.009 CBM.
erate reiie FWM, TECAMAC — |peror international
Pens EDO. MEXICO — |Seaport/ Aiport
3, Cargo Readiness Dato 2aTOEROZ
4, Requested Shipping Mode Roadway
5, Requested Detivery a the Ste Before 30/05/2022
16. Delivery to Final Destination) Job Site
17. Requested by (SR SH SUBEIX Sa ae Be
fe: Requested Dato 0/05/2022