Indoor Environmental Quality Report

The document contains temperature, humidity, air quality, and illumination readings from 44 indoor locations in a building, comparing the required and actual levels. Several locations exceeded the maximum required levels for temperature, humidity, and air quality. An observation and recommendation section at the bottom suggests some areas of concern that may need adjustment.

Uploaded by

ansarisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views57 pages

Indoor Environmental Quality Report

The document contains temperature, humidity, air quality, and illumination readings from 44 indoor locations in a building, comparing the required and actual levels. Several locations exceeded the maximum required levels for temperature, humidity, and air quality. An observation and recommendation section at the bottom suggests some areas of concern that may need adjustment.

Uploaded by

ansarisham
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Temperature Humidity Air Quality Illumination

SN Location °C % AQI lux


Required Actual Required Actual Required Actual Required Actual

1 Admin_Office_Corridor 27 28 30-50 67 0-50 101-150 50-150 44


2 AHU_Room 27 32 30-50 64 0-50 101-150 100-200 54
3 Business_Commercial 27 30 30-50 41 0-50 51-100 300-750 392
4 Conference_Room 27 26 30-50 43 0-50 51-100 300-750 221
5 Electrical_Workshop 27 31 30-50 73 0-50 151-200 100-200 49
6 Engineering_Room 27 27 30-50 67 0-50 101-150 100-200 161
7 HR_Admin 27 28 30-50 46 0-50 51-100 300-750 151
8 Mechanical_Workshop 27 31 30-50 72 0-50 151-200 100-200 92
9 Switch_Cabinet_Room 27 29 30-50 64 0-50 51-100 200-500 38
10 Toilet-5 27 31 30-50 75 0-50 201-300 100-200 80
11 Training_Room 27 28 30-50 55 0-50 51-100 300-750 269
12 Turbo_Cleaning_Area 27 31 30-50 71 0-50 151-200 200-500 112
13 View_Gallery 27 31 30-50 72 0-50 201-300 300-750 18
14 2nd_Floor_South_AHU 27 30 30-50 86 0-50 51-100 100-200 367
15 Blanket_Bending_Room 27 28 30-50 57 0-50 151-200 200-500 393
16 Chiller_Plant 27 26 30-50 98 0-50 101-150 200-500 424
17 Communication_Room-A 27 26 30-50 53 0-50 151-200 200-500 120
18 Communication_Room-B 27 29 30-50 58 0-50 201-300 200-500 41
19 Compressor_Room 27 31 30-50 77 0-50 101-150 100-200 27
20 Conference_Room_Corrected 27 27 30-50 43 0-50 51-100 300-750 322
21 Console 27 24 30-50 59 0-50 101-150 750-1500 1129
22 CTP_Room-Dark_Room 27 23 30-50 57 0-50 101-150 50 15
23 Directors_Room 27 27 30-50 63 0-50 51-100 300-750 301
24 Executive Cabin-1 27 28 30-50 60 0-50 101-150 300-750 36
25 Executive_Cabin-2 27 28 30-50 84 0-50 101-150 300-750 16
26 HOD_Room 27 27 30-50 48 0-50 51-100 300-750 204
27 Ink_Room 27 30 30-50 72 0-50 101-150 200-500 68
28 Inserter_Floor 27 30 30-50 86 0-50 151-200 300-750 115
29 LT_Panel 27 29 30-50 81 0-50 101-150 200-500 48
30 Mail_Room 27 29 30-50 85 0-50 151-200 300-750 62
31 Man_Spares_Store 27 30 30-50 81 0-50 51-100 50--150 103
32 NP_Godown 27 27 30-50 93 0-50 101-150 50--150 60
33 Plant_Head_Room 27 27 30-50 63 0-50 151-200 300-750 122
34 Press_Hall 27 29 30-50 85 0-50 151-200 200-500 39
35 Production_Store 27 28 30-50 62 0-50 201-300 50--150 41
36 Reception-l 27 31 30-50 85 0-50 51-100 300-750 144
37 Reel_Stand_Area 27 29 30-50 85 0-50 101-150 200-500 25
38 RMD_Dispatch_Area 27 30 30-50 87 0-50 101-150 200-500 25
39 RMD_Store 27 30 30-50 81 0-50 101-150 50--150 16
40 Technotrans_Room-1 27 31 30-50 75 0-50 101-150 300-750 27
41 Technotrans_Room-2 27 29 30-50 76 0-50 101-150 300-750 42
42 Toilet-1 27 30 30-50 89 0-50 51-100 100-200 71
43 Toilet-3 27 24 30-50 85 0-50 201-300 100-200 62
44 UPS_Room 27 26 30-50 54 0-50 151-200 200-500 166

Observation & Recommendation:

Technician In charge
20
Cool 21
22
23
24
Neutral
25
26
27
Warm 28
29
30
Hot
37
Very hot 40
Extremely hot 50

Ambience Illuminance Colour Ambience Illuminance Index levels of Health Concern


Green GOOD

Yellow MODERATE

Red UNHEALTHY
Temperature °C
Room indoors

Warm room

Hot day
Body temperature
Very hot
Extremely hot

% Contribution and cautio


70%
3%
Roller Room­_Siri
23% AMMS, Battery Room, Cafeteria, Mailroom_Coloman,
RELATIVE HUMIDITY RH% Reference
RH% MEANING
≤ 55 % Dry and Comfortable
Between 55 to 65 % Sticky with Muggy Evening
≥ 65 % Oppressive, Lots of Moisture in the air
RELATIVE HUMIDITY RH% Reference
% Contribution and caution area identification
73%
27% Conference-I, Switch Cabinet-1, T2 Wash Room, T4 Ladies Toilet, UPS-1, UPS-2
0%
The
Daily AQI Colour Air Quality Index Levels of Health Concern Numerical Value
Green Good 0 to 50
Yellow Moderate 51 to 100
Orange Unhealthy for Sensitive Groups 101 to 150
Red Unhealthy 151 to 200
Purple Very Unhealthy 201 to 300
Maroon Hazardous 301 to 500
The Air Quality Index AQI Self
Meaning
Air quality is considered satisfactory, and air pollution poses little or no risk.
Air quality is acceptable; however, for some pollutants there may be a moderate health concern for a very small number of
Members of sensitive groups may experience health effects. The general public is not likely to be affected
Everyone may begin to experience health effects; members of sensitive groups may experience more serious health effects.
Health alert: everyone may experience more serious health effects.
Health warnings of emergency condition. The entire population is more likely to be affected.
Temperature
SN Location °C
Required Actual
1 Admin_Office_Corridor 27 28 4
2 AHU_Room 27 32 16
3 Business_Commercial 27 30 17
4 Conference_Room 27 26 21
5 Electrical_Workshop 27 31 22
6 Engineering_Room 27 27 43
7 HR_Admin 27 28 44
8 Mechanical_Workshop 27 31 1
9 Switch_Cabinet_Room 27 29 6
10 Toilet-5 27 31 7
11 Training_Room 27 28 9
12 Turbo_Cleaning_Area 27 31 11
13 View_Gallery 27 31 15
14 2nd_Floor_South_AHU 27 30 18
15 Blanket_Bending_Room 27 28 20
16 Chiller_Plant 27 26 23
17 Communication_Room-A 27 26 24
18 Communication_Room-B 27 29 25
19 Compressor_Room 27 31 26
20 Conference_Room_Corrected 27 27 29
21 Console 27 24 30
22 CTP_Room-Dark_Room 27 23 32
23 Directors_Room 27 27 33
24 Executive Cabin-1 27 28 34
25 Executive_Cabin-2 27 28 35
26 HOD_Room 27 27 37
27 Ink_Room 27 30 41
28 Inserter_Floor 27 30 2
29 LT_Panel 27 29 3
30 Mail_Room 27 29 5
31 Man_Spares_Store 27 30 8
32 NP_Godown 27 27 10
33 Plant_Head_Room 27 27 12
34 Press_Hall 27 29 13
35 Production_Store 27 28 14
36 Reception-l 27 31 19
37 Reel_Stand_Area 27 29 27
38 RMD_Dispatch_Area 27 30 28
39 RMD_Store 27 30 31
40 Technotrans_Room-1 27 31 36
41 Technotrans_Room-2 27 29 38
42 Toilet-1 27 30 39
43 Toilet-3 27 24 40
44 UPS_Room 27 26 42

SN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Conference_Room 27 26 7 20 17
Chiller_Plant 27 26
Communication_Room-A 27 26 Neutral Warm Hot
Console 27 24 16% 45% 39%
CTP_Room-Dark_Room 27 23
Toilet-3 27 24
UPS_Room 27 26
Chart Title
Admin_Office_Corridor 27 28
Engineering_Room 27 27
HR_Admin 27 28 16%
Switch_Cabinet_Room 27 29
Training_Room 27 28 39%
Blanket_Bending_Room 27 28
Communication_Room-B 27 29
45%
Conference_Room_Corrected 27 27
Directors_Room 27 27
Executive Cabin-1 27 28
Executive_Cabin-2 27 28
HOD_Room 27 27
LT_Panel 27 29
Mail_Room 27 29
NP_Godown 27 27
Plant_Head_Room 27 27
Press_Hall 27 29
Production_Store 27 28
Reel_Stand_Area 27 29
Technotrans_Room-2 27 29
AHU_Room 27 32
Business_Commercial 27 30
Electrical_Workshop 27 31
Mechanical_Workshop 27 31
Toilet-5 27 31
Turbo_Cleaning_Area 27 31
View_Gallery 27 31
2nd_Floor_South_AHU 27 30
Compressor_Room 27 31
Ink_Room 27 30
Inserter_Floor 27 30
Man_Spares_Store 27 30
Reception-l 27 31
RMD_Dispatch_Area 27 30
RMD_Store 27 30
Technotrans_Room-1 27 31
Toilet-1 27 30

Humidity
Location %
Required Actual
Admin_Office_Corridor 30-50 67
AHU_Room 30-50 64
Business_Commercial 30-50 41
Conference_Room 30-50 43
Electrical_Workshop 30-50 73
Engineering_Room 30-50 67
HR_Admin 30-50 46
Mechanical_Workshop 30-50 72
Switch_Cabinet_Room 30-50 64
Toilet-5 30-50 75
Training_Room 30-50 55
Turbo_Cleaning_Area 30-50 71
View_Gallery 30-50 72
2nd_Floor_South_AHU 30-50 86
Blanket_Bending_Room 30-50 57
Chiller_Plant 30-50 98
Communication_Room-A 30-50 53
Communication_Room-B 30-50 58
Compressor_Room 30-50 77
Conference_Room_Corrected 30-50 43
Console 30-50 59
CTP_Room-Dark_Room 30-50 57
Directors_Room 30-50 63
Executive Cabin-1 30-50 60
Executive_Cabin-2 30-50 84
HOD_Room 30-50 48
Ink_Room 30-50 72
Inserter_Floor 30-50 86
LT_Panel 30-50 81
Mail_Room 30-50 85
Man_Spares_Store 30-50 81
NP_Godown 30-50 93
Plant_Head_Room 30-50 63
Press_Hall 30-50 85
Production_Store 30-50 62
Reception-l 30-50 85
Reel_Stand_Area 30-50 85
RMD_Dispatch_Area 30-50 87
RMD_Store 30-50 81
Technotrans_Room-1 30-50 75
Technotrans_Room-2 30-50 76
Toilet-1 30-50 89
Toilet-3 30-50 85
UPS_Room 30-50 54

SN Location

1 Admin_Office_Corridor
2 AHU_Room
3 Business_Commercial
4 Conference_Room
5 Electrical_Workshop
6 Engineering_Room
7 HR_Admin
8 Mechanical_Workshop
9 Switch_Cabinet_Room
10 Toilet-5
11 Training_Room
12 Turbo_Cleaning_Area
13 View_Gallery
14 2nd_Floor_South_AHU
15 Blanket_Bending_Room
16 Chiller_Plant
17 Communication_Room-A
18 Communication_Room-B
19 Compressor_Room
20 Conference_Room_Corrected
21 Console
22 CTP_Room-Dark_Room
23 Directors_Room
24 Executive Cabin-1
25 Executive_Cabin-2
26 HOD_Room
27 Ink_Room
28 Inserter_Floor
29 LT_Panel
30 Mail_Room
31 Man_Spares_Store
32 NP_Godown
33 Plant_Head_Room
34 Press_Hall
35 Production_Store
36 Reception-l
37 Reel_Stand_Area
38 RMD_Dispatch_Area
39 RMD_Store
40 Technotrans_Room-1
41 Technotrans_Room-2
42 Toilet-1
43 Toilet-3
44 UPS_Room
44

t Title Chart Title

45%
% 39%
Neutral
Warm
Axis Title

Hot

45%
16%

Neutral Warm Hot


Air Quality
AQI
Required Actual
0-50 101-150
0-50 101-150
0-50 51-100
0-50 51-100
0-50 151-200
0-50 101-150
0-50 51-100
0-50 151-200
0-50 51-100
0-50 201-300
0-50 51-100
0-50 151-200
0-50 201-300
0-50 51-100
0-50 151-200
0-50 101-150
0-50 151-200
0-50 201-300
0-50 101-150
0-50 51-100
0-50 101-150
0-50 101-150
0-50 51-100
0-50 101-150
0-50 101-150
0-50 51-100
0-50 101-150
0-50 151-200
0-50 101-150
0-50 151-200
0-50 51-100
0-50 101-150
0-50 151-200
0-50 151-200
0-50 201-300
0-50 51-100
0-50 101-150
0-50 101-150
0-50 101-150
0-50 101-150
0-50 101-150
0-50 51-100
0-50 201-300
0-50 151-200

Illumination
SN Location lux
Required Actual
1 Admin_Office_Corridor 50-150 44
2 AHU_Room 100-200 54
3 Business_Commercial 300-750 392
4 Conference_Room 300-750 221
5 Electrical_Workshop 100-200 49
6 Engineering_Room 100-200 161
7 HR_Admin 300-750 151
8 Mechanical_Workshop 100-200 92
9 Switch_Cabinet_Room 200-500 38
10 Toilet-5 100-200 80
11 Training_Room 300-750 269
12 Turbo_Cleaning_Area 200-500 112
13 View_Gallery 300-750 18
14 2nd_Floor_South_AHU 100-200 367
15 Blanket_Bending_Room 200-500 393
16 Chiller_Plant 200-500 424
17 Communication_Room-A 200-500 120
18 Communication_Room-B 200-500 41
19 Compressor_Room 100-200 27
20 Conference_Room_Corrected 300-750 322
21 Console 750-1500 1129
22 CTP_Room-Dark_Room 50 15
23 Directors_Room 300-750 301
24 Executive Cabin-1 300-750 36
25 Executive_Cabin-2 300-750 16
26 HOD_Room 300-750 204
27 Ink_Room 200-500 68
28 Inserter_Floor 300-750 115
29 LT_Panel 200-500 48
30 Mail_Room 300-750 62
31 Man_Spares_Store 50--150 103
32 NP_Godown 50--150 60
33 Plant_Head_Room 300-750 122
34 Press_Hall 200-500 39
35 Production_Store 50--150 41
36 Reception-l 300-750 144
37 Reel_Stand_Area 200-500 25
38 RMD_Dispatch_Area 200-500 25
39 RMD_Store 50--150 16
40 Technotrans_Room-1 300-750 27
41 Technotrans_Room-2 300-750 42
42 Toilet-1 100-200 71
43 Toilet-3 100-200 62
44 UPS_Room 200-500 166
39%

Hot
ACR_Temperature °C_CHENNAI ACR_R

32%
Good
Moderate 52%
68%

ACR_Air Quality Index - AQI_CHENNAI A

11%
27% Moderate 3
23% Un-Healthy (SG)
Un-Healthy
Very Un-Healthy

5%
39%
ACR_Relative Humidity - RH %_CHENNAI

16%
Dry and Comfortable
Sticky with Muggy Evening
52% Oppressive, Lots of Mois-
32% ture

ACR_Illumination- lux_CHENNAI

23% Good
32% Moderate
Un-Healthy (SG)
Un-Healthy
11%
Very Un-Healthy
Hazardous
5% 11% 18%
Ambience Checking Report_Chennai
Report No. AG/TOI/ Date 19_20_21-04-2023
Checking Interval 15 days Client Times of India
Surveyor SamiuddinPurpose Ambience Check
140, Rajiv Gandhi Salai
(OMR), Near Sathyabama
Project University,
Chemmenchery, Chennai –
600119
Job Description Ambience Tracking Sheet
Testing instrument: Lutron LX-101A, Huma-i Smart (HI-300)
Acceptance Criteria: ECBC_BEE 2017, NBC V-1_2-2016

Temperature Humidity Air Quality Illumination


SN Location °C % AQI lux
Required Actual Required Actual Required Actual Required Actual

1 Admin_Office_Corridor 27 28 30-50 67 0-50 101-150 50-150 44


2 AHU_Room 27 32 30-50 64 0-50 101-150 100-200 54
3 Business_Commercial 27 30 30-50 41 0-50 51-100 300-750 392
4 Conference_Room 27 26 30-50 43 0-50 51-100 300-750 221
5 Electrical_Workshop 27 31 30-50 73 0-50 151-200 100-200 49
6 Engineering_Room 27 27 30-50 67 0-50 101-150 100-200 161
7 HR_Admin 27 28 30-50 46 0-50 51-100 300-750 151
8 Mechanical_Workshop 27 31 30-50 72 0-50 151-200 100-200 92
9 Switch_Cabinet_Room 27 29 30-50 64 0-50 51-100 200-500 38
10 Toilet-5 27 31 30-50 75 0-50 201-300 100-200 80
11 Training_Room 27 28 30-50 55 0-50 51-100 300-750 269
12 Turbo_Cleaning_Area 27 31 30-50 71 0-50 151-200 200-500 112
13 View_Gallery 27 31 30-50 72 0-50 201-300 300-750 18
14 2nd_Floor_South_AHU 27 30 30-50 86 0-50 51-100 100-200 367
15 Blanket_Bending_Room 27 28 30-50 57 0-50 151-200 200-500 393
16 Chiller_Plant 27 26 30-50 98 0-50 101-150 200-500 424
17 Communication_Room-A 27 26 30-50 53 0-50 151-200 200-500 120
18 Communication_Room-B 27 29 30-50 58 0-50 201-300 200-500 41
19 Compressor_Room 27 31 30-50 77 0-50 101-150 100-200 27
20 Conference_Room_Corrected 27 27 30-50 43 0-50 51-100 300-750 322
21 Console 27 24 30-50 59 0-50 101-150 750-1500 1129
22 CTP_Room-Dark_Room 27 23 30-50 57 0-50 101-150 50 15
23 Directors_Room 27 27 30-50 63 0-50 51-100 300-750 301
24 Executive Cabin-1 27 28 30-50 60 0-50 101-150 300-750 36
25 Executive_Cabin-2 27 28 30-50 84 0-50 101-150 300-750 16
26 HOD_Room 27 27 30-50 48 0-50 51-100 300-750 204
27 Ink_Room 27 30 30-50 72 0-50 101-150 200-500 68
28 Inserter_Floor 27 30 30-50 86 0-50 151-200 300-750 115
29 LT_Panel 27 29 30-50 81 0-50 101-150 200-500 48
30 Mail_Room 27 29 30-50 85 0-50 151-200 300-750 62
31 Man_Spares_Store 27 30 30-50 81 0-50 51-100 50--150 103
32 NP_Godown 27 27 30-50 93 0-50 101-150 50--150 60
33 Plant_Head_Room 27 27 30-50 63 0-50 151-200 300-750 122
34 Press_Hall 27 29 30-50 85 0-50 151-200 200-500 39
35 Production_Store 27 28 30-50 62 0-50 201-300 50--150 41
36 Reception-l 27 31 30-50 85 0-50 51-100 300-750 144
37 Reel_Stand_Area 27 29 30-50 85 0-50 101-150 200-500 25
38 RMD_Dispatch_Area 27 30 30-50 87 0-50 101-150 200-500 25
39 RMD_Store 27 30 30-50 81 0-50 101-150 50--150 16
40 Technotrans_Room-1 27 31 30-50 75 0-50 101-150 300-750 27
41 Technotrans_Room-2 27 29 30-50 76 0-50 101-150 300-750 42
42 Toilet-1 27 30 30-50 89 0-50 51-100 100-200 71
43 Toilet-3 27 24 30-50 85 0-50 201-300 100-200 62
44 UPS_Room 27 26 30-50 54 0-50 151-200 200-500 166

Observation & Recommendation:

Technician In charge
Report No. AG/TOI/CHENNAI/AMB-01 Date
Checking Interval 15 days Client
Surveyor Samiuddin Ansari Purpose

Project 140, Rajiv Gandhi Salai (OMR), Near Sathyabama University, Chemmench

Job Description Ambience Tracking Sheet

Legends:
88% Good Moderate Unhealthy (SG)
AG Representative
19_20_21-04-2023
Times of India
Ambience Check

r Sathyabama University, Chemmenchery, Chennai – 600119

Unhealthy Very Unhealthy Hazardous


ACR_Temperature - °C_CHENNAI_19_20_21-04-2023
Location Temperature Legends:
SN °C Good
Location Required Actual 44 30
1 AHU_Room 27 32
2 Business_Commercial 27 30 Good
3 Electrical_Workshop 27 31 68%
4 Mechanical_Workshop 27 31
5 Toilet-5 27 31
6 Turbo_Cleaning_Area 27 31
7 View_Gallery 27 31
ACR_Temperature
8 2nd_Floor_South_AHU 27 30
9 Compressor_Room 27 31
10 Reception-l 27 31
11 RMD_Dispatch_Area 27 30 32%
12 RMD_Store 27 30
13 Technotrans_Room-1 27 31
14 Toilet-1 27 30 68%
15 Admin_Office_Corridor 27 28 88%
16 Conference_Room 27 26
17 Engineering_Room 27 27
18 HR_Admin 27 28
19 Switch_Cabinet_Room 27 29
20 Training_Room 27 28
21 Blanket_Bending_Room 27 28
22 Chiller_Plant 27 26
23 Communication_Room-A 27 26
24 Communication_Room-B 27 29
25 Conference_Room_Corrected 27 27
26 Console 27 24
27 CTP_Room-Dark_Room 27 23
28 Directors_Room 27 27
29 Executive Cabin-1 27 28
30 Executive_Cabin-2 27 28
31 HOD_Room 27 27
32 Ink_Room 27 30
33 Inserter_Floor 27 30
34 LT_Panel 27 29
35 Mail_Room 27 29
36 Man_Spares_Store 27 30
37 NP_Godown 27 27
38 Plant_Head_Room 27 27
39 Press_Hall 27 29
40 Production_Store 27 28
41 Reel_Stand_Area 27 29
42 Technotrans_Room-2 27 29
43 Toilet-3 27 24
44 UPS_Room 27 26

Observation & Recommendation:

Technician AG Representative
s:
Moderate Unhealthy (SG)
14

Moderate
32%

R_Temperature °C_CHENNAI

32%
Good
Moderate
68%
Unhealthy Very Unhealthy Hazardous

Good
Moderate
ACR_Relative Humidity - RH %_CHENNAI_19_20_21-04-2023
Humidity MEANING

SN Location % RH%

Required Actual 44
3 Business_Commercial 30-50 41
4 Conference_Room 30-50 43 MEANING
7 HR_Admin 30-50 46
11 Training_Room 30-50 55
17 Communication_Room-A 30-50 53
20 Conference_Room_Corrected 30-50 43 ACR_Relative Humidity -
26 HOD_Room 30-50 48
1 Admin_Office_Corridor 30-50 67 88%
2 AHU_Room 30-50 64
16%
6 Engineering_Room 30-50 67
9 Switch_Cabinet_Room 30-50 64
15 Blanket_Bending_Room 30-50 57 52%
18 Communication_Room-B 30-50 58 32%
21 Console 30-50 59
22 CTP_Room-Dark_Room 30-50 57
23 Directors_Room 30-50 63
24 Executive Cabin-1 30-50 60
25 Executive_Cabin-2 30-50 84
33 Plant_Head_Room 30-50 63
35 Production_Store 30-50 62
44 UPS_Room 30-50 54
5 Electrical_Workshop 30-50 73
8 Mechanical_Workshop 30-50 72
10 Toilet-5 30-50 75
12 Turbo_Cleaning_Area 30-50 71
13 View_Gallery 30-50 72
14 2nd_Floor_South_AHU 30-50 86
16 Chiller_Plant 30-50 98
19 Compressor_Room 30-50 77
27 Ink_Room 30-50 72
28 Inserter_Floor 30-50 86
29 LT_Panel 30-50 81
30 Mail_Room 30-50 85
31 Man_Spares_Store 30-50 81
32 NP_Godown 30-50 93
34 Press_Hall 30-50 85
36 Reception-l 30-50 85
37 Reel_Stand_Area 30-50 85
38 RMD_Dispatch_Area 30-50 87
39 RMD_Store 30-50 81
40 Technotrans_Room-1 30-50 75
41 Technotrans_Room-2 30-50 76
42 Toilet-1 30-50 89
43 Toilet-3 30-50 85

Observation & Recommendation:

Technician AG Representative
0_21-04-2023
Dry and Comfortable Sticky with Muggy Evening Oppressive, Lots of Moisture in the air

≤ 55 % Between 55 to 65 % ≥ 65 %

7 14 23

Dry and Comfortable Sticky with Muggy Evening Oppressive, Lots of Moisture
16% 32% 52%

R_Relative Humidity - RH %_CHENNAI

16%
Dry and Comfortable
Sticky with Muggy Evening
2% Oppressive, Lots of Moisture
32%
Legends:
Unhealth
Good Moderate
Unhealthy (SG) Very Unhealthy
Hazardous
y
RELATIVE HUMIDITY RH% Reference
RH% MEANING
≤ 55 % Dry and Comfortable
Between 55 to 65 % Sticky with Muggy Evening
≥ 65 % Oppressive, Lots of Moisture in the air
Note:
Most people find that a relative humidity between 30 to 60 % is the most comfortable, with indoor humidity ideally between
Hazardous
or humidity ideally between 30 to 50 %.
ACR_Air Quality Index - AQI_CHENNAI_19_20_21-04-2023
Air Quality Legends:
SN Location AQI Good
Required Actual 44
3 Business_Commercial 0-50 51-100

4 Conference_Room 0-50 51-100


7 HR_Admin 0-50 51-100
9 Switch_Cabinet_Room 0-50 51-100
11 Training_Room 0-50 51-100 ACR_Air Quality Index - A
14 2nd_Floor_South_AHU 0-50 51-100
20 Conference_Room_Corrected 0-50 51-100
23 Directors_Room 0-50 51-100 11%
26 HOD_Room 0-50 51-100 27%
31 Man_Spares_Store 0-50 51-100
36 Reception-l 0-50 51-100
42 Toilet-1 0-50 51-100 23%
1 Admin_Office_Corridor 0-50 101-150 88%
2 AHU_Room 0-50 101-150
6 Engineering_Room 0-50 101-150
16 Chiller_Plant 0-50 101-150
19 Compressor_Room 0-50 101-150
21 Console 0-50 101-150
39%
22 CTP_Room-Dark_Room 0-50 101-150
24 Executive Cabin-1 0-50 101-150
25 Executive_Cabin-2 0-50 101-150
27 Ink_Room 0-50 101-150
29 LT_Panel 0-50 101-150
32 NP_Godown 0-50 101-150
37 Reel_Stand_Area 0-50 101-150 ACR_Air Quality Index - A
38 RMD_Dispatch_Area 0-50 101-150
39 RMD_Store 0-50 101-150
40 Technotrans_Room-1 0-50 101-150 11%
41 Technotrans_Room-2 0-50 101-150 27%
5 Electrical_Workshop 0-50 151-200
8 Mechanical_Workshop 0-50 151-200
12 Turbo_Cleaning_Area 0-50 151-200 23%
15 Blanket_Bending_Room 0-50 151-200
17 Communication_Room-A 0-50 151-200
28 Inserter_Floor 0-50 151-200
30 Mail_Room 0-50 151-200
33 Plant_Head_Room 0-50 151-200
34 Press_Hall 0-50 151-200
39%
44 UPS_Room 0-50 151-200
10 Toilet-5 0-50 201-300
39%

13 View_Gallery 0-50 201-300


18 Communication_Room-B 0-50 201-300
35 Production_Store 0-50 201-300
43 Toilet-3 0-50 201-300

Observation & Recommendation:

Technician In charge AG Representative


s:
Moderate Un-Healthy (SG) Un-Healthy Very Un-Healthy Hazardous
12 17 10 5

Moderate Un-Healthy (SG) Un-Healthy Very Un-Healthy

27% 39% 23% 11%

r Quality Index - AQI_CHENNAI

1%
27%

Moderate
Un-Healthy (SG)
Un-Healthy
Very Un-Healthy

39%

r Quality Index - AQI_CHENNAI

1%
27%

Moderate
Un-Healthy (SG)
Un-Healthy
Very Un-Healthy

39%
39%
ACR_Illumination- lux_CHENNAI_19_20_21-04-2023
Illumination Legends:
SN Location lux Good Moderate
Required Actual 44 10 5
1 Business_Commercial 300-750 392 Good Moderate
2 Engineering_Room 100-200 161 23% 11%
3 2nd_Floor_South_AHU 100-200 367
4 Blanket_Bending_Room 200-500 393
5 Chiller_Plant 200-500 424 ACR_Illumina
6 Conference_Room_Corrected 300-750 322
7 Console 750-1500 1129
8 Directors_Room 300-750 301
9 Man_Spares_Store 50--150 103 2
32%
10 NP_Godown 50--150 60
11 Admin_Office_Corridor 50-150 44 88%
12 Mechanical_Workshop 100-200 92
13 Training_Room 300-750 269 5% 11% 18%
14 CTP_Room-Dark_Room 50 15
15 HOD_Room 300-750 204
16 Conference_Room 300-750 221
17 UPS_Room 200-500 166
18 HR_Admin 300-750 151
19 Turbo_Cleaning_Area 200-500 112
20 Communication_Room-A 200-500 120
21 Inserter_Floor 300-750 115
22 Plant_Head_Room 300-750 122
23 Reception-l 300-750 144
24 AHU_Room 100-200 54
25 Toilet-5 100-200 80
26 Production_Store 50--150 41
27 Toilet-1 100-200 71
28 Toilet-3 100-200 62
29 Electrical_Workshop 100-200 49
30 Communication_Room-B 200-500 41
31 Switch_Cabinet_Room 200-500 38
32 View_Gallery 300-750 18
33 Compressor_Room 100-200 27
34 Executive Cabin-1 300-750 36
35 Executive_Cabin-2 300-750 16
36 Ink_Room 200-500 68
37 LT_Panel 200-500 48
38 Mail_Room 300-750 62
39 Press_Hall 200-500 39
40 Reel_Stand_Area 200-500 25
41 RMD_Dispatch_Area 200-500 25
42 RMD_Store 50--150 16
43 Technotrans_Room-1 300-750 27
44 Technotrans_Room-2 300-750 42

Observation & Recommendation:

Technician AG Representative
s:
Un-Healthy (SG) Un-Healthy Very Un-Healthy Hazardous
8 5 2 14
Un-Healthy (SG) Un-Healthy Very Un-Healthy Hazardous
18% 11% 5% 32%

ACR_Illumination- lux_CHENNAI

Good
23% Moderate
32%
Un-Healthy (SG)
Un-Healthy
11%
Very Un-Healthy
Hazardous
5% 11% 18%
Temperature
Ambient
Ambient temperature index
Temperature
level of health concern
Colour
Green Good

Yellow Moderate

Orange Un-healthy for sensitive group


Red Un-healthy
Purple Very un-healthy
Maroon Hazardous
% Contribution and caution area identification

68%

32% (AHU_Room, Business_Commercial,


Electrical_Workshop, Mechanical_Workshop, Toilet-5,
Turbo_Cleaning_Area, View_Gallery, 2nd_Floor_South_AHU,
Compressor_Room, Reception-l, RMD_Dispatch_Area,
RMD_Store, Technotrans_Room-1, Toilet-1)

0%
0%
0%
0%
Temperature
Ambient
Ambient temperature index
Temperature
level of health concern
Colour
Green Good

Yellow Moderate

Orange Un-healthy for sensitive group


Red Un-healthy
Purple Very un-healthy
Maroon Hazardous
% Contribution and caution area identification

68%

32% (AHU_Room, Business_Commercial,


Electrical_Workshop, Mechanical_Workshop, Toilet-5,
Turbo_Cleaning_Area, View_Gallery, 2nd_Floor_South_AHU,
Compressor_Room, Reception-l, RMD_Dispatch_Area,
RMD_Store, Technotrans_Room-1, Toilet-1)

0%
0%
0%
0%
Relative Humidity RH % Reference
RH% MEANING
≤ 55 % Dry and Comfortable

Between 55 to 65 % Sticky with Muggy Evening

≥ 65 % Oppressive, Lots of Moisture in the air


umidity RH % Reference
% Contribution and caution area identification
16%

32%
(Admin_Office_Corridor, AHU_Room, Engineering_Room,
Switch_Cabinet_Room, Blanket_Bending_Room,
Communication_Room-B, CTP_Room-Dark_Room,
Directors_Room, Executive Cabin-1, Executive_Cabin-2,
Plant_Head_Room, Production_Store, UPS_Room)

52%

(Electrical_Workshop, Mechanical_Workshop, Toilet-5,


Turbo_Cleaning_Area, View_Gallery,
2nd_Floor_South_AHU, Chiller_Plant, Compressor_Room,
Ink_Room, Inserter_Floor, LT_Panel, Mail_Room,
Man_Spares_Store, NP_Godown, Press_Hall, Reception-l,
Reel_Stand_Area, RMD_Dispatch_Area, RMD_Store,
Technotrans_Room-1, Technotrans_Room-2, Toilet-1,
Toilet-3)

Note:
Most people find that a relative humidity be
le find that a relative humidity between 30 to 60 % is the most comfortable, with indoor humidity ideally between 30 to 50 %.
n 30 to 50 %.
Illumination - lux
Ambience Ambience Illuminance
Illuminance Index levels of Health
Colour Concern
Green Good

Yellow Moderate

Orange Un-Healthy (SG)

Red Un-Healthy

Purpule Very Un-Healthy

Maroon Hazardous
% Contribution and caution area identification

23% Good Moderate


11%
(Admin_Office_Corridor, Mechanical_Workshop, Training_Room, CTP_Room-
Dark_Room, HOD_Room)
18%

(Conference_Room, UPS_Room, HR_Admin, Turbo_Cleaning_Area,


Communication_Room-A, Inserter_Floor, Plant_Head_Room, Reception-l)

11%
(AHU_Room, Toilet-5, Production_Store, Toilet-1, Toilet-3)
5%
(Electrical_Workshop, Communication_Room-B)
32%

(Switch_Cabinet_Room, View_Gallery, Compressor_Room, Executive Cabin-1,


Executive_Cabin-2, Ink_Room, LT_Panel, Mail_Room,Press_Hall, Reel_Stand_Area,
RMD_Store, Technotrans_Room-1, RMD_Dispatch_Area, Technotrans_Room-2)
Very Unhealthy Hazardous
Activity % Contribution and caution area identification
OK 32%
Need Attention 68%

You might also like