You are on page 1of 11
waanen @ ston EHSS JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 05-07-2025 MWSFE-TECH. ENG & DESIGN Desiva, Sanath, Sangesth, Abdel Rahman Alnubani Furauan Akmed, ; PAP, By Pass ine AG Majed Atanas! eee Hycro test Activity at Bypass line AG, Housekeeping, ‘Attachments: YES/NO _IFYES state number of pages 4 TARGET DATE FOR RESPONSI STE ey SC seme | mmearion/ | “aeeror | resus, cults | srarus e activity wazano /RS — |conseausnces/| currentmimicarion | ¢,fO%, | RIK | contmougron “exraa. | "RIK ySeeeTen No. $ IMPACT | MingATION a mmgarion LJ =e —_ P i 1 anaat Handing vtuscuostelter | Technaue shall be | tollowes Site preperation Persona | carey | Drders Hand cacwoe |) | ne we Ty by ly} wa | cose c tury | Ines 2, Trained ond | Supervisor vA [ajala Mf | Zompetent manoower | I = Brier to mobilization of the workforce ensure ae proper ining Incompetent, Eompleted wp required rrobitzationof te | the task puaieces ene M7 rivarce rs ecaure them ro 12 % wa wh ye 2. | wordorcs to sta rearereey eae fempstentonuan or | Sapomear | | vA ve |X| va | eroseo Se Erste pone | Berta Yoeatign plea here fared coli er Semone eg ENE HRD steers ustruckare h i" Damages 1. Ensure all equioment eauipment nd tools or nspactod | snd too 7 Bropery and fi forthe may use for Personne inury | jb prior to mobilize to Motizationof the |_| the tsk the workecaton enc work w |v | 3, | eauipment ane toes to sotey & aa wa wa [WINN wa | croseo thot oration Eyeonearas erst anvol Property Damage | atonal tot could | Henaing Senora | Smergency equipment. EHSS MaADEN @ Wotan JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 ste activity Ne. ‘CONSEQUENCES/ IMPACT. (CURRENT MITIGATION ‘cuRRENT MITIGATION RESPONSI BLE FOR XTRA, MITIgaTio N RESIDUAL TARGET DATE FOR THE Losing THEEXTRA MITIGATION status Connect the inlet and out Tee connection Tor Pipes with hydro test auinment’s hoses, pump manifold, sauges) Working at. elght_ for ‘gauge insaling Communica fon Faults Safety Physial jury 1. Trained person to do the activity 2, There shall be atleast two pressure gauges, fone at lowest point fand another at the blghest point in the system cacwork Stporieor JTecENGe DESIGN N/A wa > rz eLOsED Fall down person and fools safety Physical injury 1 use safaty hamess ‘with 100% te off 2, Do. Not Carry any tools while climbing Indser’ 5. Ensure the tools are nt Kept atthe edge cAcwork Sepersiso: a re >e >= wa LoseD Body postion Safety Physical iniury 1 Folow 3 pant contact for upside Setwty. 2, Awareness to. the team clscuss at PST meeting. ac wort Supervisor Na N/A ta a c10seo Handling inlet hore st heights safety Property Damage, fata T Perrone! pending the hose at higher flevation must 100% Ue of the. safety harness with double Tanyaras, 2. Seaure the hose with strong. points to dvoid sp out 5, Shutdown the motor ump. while person managing the hoses. 4 Display" sian boards of Hvao tes cacwort ‘alee Otter Supervizor ste | 2 1, Awareness to te teom about Werking t height, 2'Pre use vsuat inspection of sBtety harness Srenvure the 5 arty conied Eatety harness are see. Whiplash ‘rrestor shall be provided at hose onnetion. aac wa cuosen, Pressurizing the AG pipe 5. | ineup to” 10. BAR ond hoiaing Unouthorised entry Safety | Prsialiniury 1 Aree should be barricade properly and flow” safe Gistance, 2 Warning signs need tobe displayed cacwore Supervise Nya NA. ecg oz oz wa. cLoseD Revlon No bate ooaorseo200) ape Zot MAADEN > uateo JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 = = — = TARGET DATE FOR = EXTRA | RESPONSI a o RESPONSIBLE | inueneNT | MITIGATION/ | 'BLEFOR RESIDUAL | c1OdiNG | status. ? acuity wazaro |H/ —|CONSEQUENCES/| CURRENTMITIGATION | cyfOR,, |" RISK’ | CONTROLGFOR | “EXTRA mek | omens no. 5 THPACT. a igi | wmicatio MITIGATION R PLepa Tana 1. Use appropriate PPE / personat | safety_| Physical ia ac wer " wlay |W aya : vy | Physica injry ete eevee liz va we |WIWIW nwa | croseo ower tool & check for smonthy une Inspection eoleur| — Gacwork valine: ws | sotety_| Phusiclnury cosine fren | 1]? Na Ne KIX) K] wa | chosen 3. Assign a trained fire Soaten with stable fire extinguisher 1 Hianiamn good cable management 2. Mantein proper | housekeeping remove al the stp. | safety | Physica inury vatadmataide | gave | | 2 wa we (MINT) ye | croseo 5 Discharge water to drain it ofter testing te avoid sis ond fate 1 Batore talon 1. Hydro testing the test gouge of test sctvity shall be pressure shall be {orried out by GAC | alba to ensure Supervisors and | its accurecy. ‘lent GA/OC shall 2. Ensure aie vent be present at work provided “at the ieeationduong Finest elevation hyare” testing ae 5. Minium of bo setts. pipe or ee ea eae 2.Whip-lash feminsted | sotety Physical intr Oe tan ee | reeeMees | 2 | 3 [ll anesor sho be) crc | 2 | 7 I Ley i provided "on the |” DESIGN provided at hose System, Connection from Gran pt ater testing S.ensure to depo | to: avoid sips and Eee fal manpower 5. Barricade the aes as Gecund) 0 pet caleltion in Sener” ane SAFETY DISTANCE monitor tor pressure testing Unauthorised entry Fovon e/ bate 00/50 S202 veoe stu angen 4p stan EHSS: JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 7 "TARGET EXTRA RESPONSI Tee va o RESPONSIBLE werent | wacaion/ | “auzron resiouar | lth | crarus F | acnry wazano |f7 | consequences/| CURRENT MITIGATION | gufSEye “mk” | conrmaccese | “exrax, | “mon | {CLOSING nd I aa MITIGATION, : SO nea MITIGATION PELE Pepe Saag wer rere te Sonvowae a eet cio seid ea pony Sess menos ‘erecate Se ane 2. Enowe the Manel easton Pressure Safety 5. Awareness to Ves caibrated the team bot he 1, Ensue the pressure asa Isvased presualy to ‘essen 8Bar as per method bly ont offeror 2. bus the rteaton of hye | Tron speton eee etna Fats cmd conection (er eats stn the ing sven bain tea 1 Preire sould be toed “yecialy tor come Stow tine for oes rv re eraneed ine or cAC Wark w © |ivinvlocl) an satay |Proneny damage | ‘2Sralnandtimefor) sacwirk | | vs wa |e) yl wa | croseo rene 2 Cometh Paya pany cored sonore rans Sere {Big ata os Manioid, Pressure praia never Seipek and ee Inspecting While Holding | Over. Pressure Sefety bare «| Tie Batted oot tor | Pret | saety [ooperty Damage | 2, £288 coninves | SAMO | 2 | 5 [BHT ey cae | 2| + wa | exoseo Slot rreatonagh oar eet sopoee 3 ibid peaure eer o eee, ee Br oer cy ome ares DERcaee —t entry. 2 = evan Re / Date 00/30°Seo"22) EHSS: MARDEN + valen JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM ~ L2 ste e No. activity HAZARD ‘CONSEQUENCES/ IMPACT ‘CURRENT MITIGATION. RESPONSIBLE FOR cURRENT MITIGATION INHERENT: sk’ EXTRA MITIGATION/ od BLE FOR EXTRA MITIGATIO " RESIDUAL, RISK’ cuosine | status Hydro testing erew should nat tay in the aractcn of the Blind flanges to prevent injury Ryaio tating Unsafe work practice Safety Personal injury 1. spection ream shal Deverty the Dressure status 2. Ensure te Inspection ‘ear complies wath the Siwsee PPE requiremert. 5. Avoid the sudden ‘lease of the bressure, 4. Only euthorized ‘persons ae alowed fomonitorthe pressure dering the froiding petiog: cat work Supervisor ‘TECH ENG ‘DESIGN wa nya | eLoseD Hydro test water disposal Environment athazord Environmental Inedent 1) Do not discharge water Aireety tothe ground afer] the tes. 2) use drainage facility cac wore Sipeniser Nea. wa | cosen Tightening of ut(aatting and tunboting) using hane tools and power tools Defective han tools sorely Personal injury 1 Make cure the tne have no pressure ¢ Zero Energy while do tightening) 2, Pre-ise vissal Inspection should be ‘done by competent 3. Follow MusPC. rronthy eelor coding, 4 Ensure theuse of Sutable toa forthe Sutable job 5, Remove the damaged tls from the site ond Detective tools shall be teaaed Sipervisar >z >z WA | evosco ROSEA ROG Sacto Eee e+ MARDEN @ U2L25 JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM ~ L2 OMEFOR aos exis | nesponst / PONSIBLE | werent —varicarion | “aueror’ | resoua | ole | sears 4 conscournces/ cunnentwmicarion | yfO8., | “RISK conmoLCroR aac | cosa, re iteaTiOn migarion siticatiON are P activity HAZARD No. @ > with DoNet Use tag void usage, Wwe Gna ladder. 4, Avoid earring ‘materiai/tooks in 5. Reop materials ‘Working at Keep materials away Height Safety | Personal Injury reales eae. 6. Ensure the ull body harness 3rd party erties 7. Ensure employees Should ot over sch frm the, ‘Scaffoldna platform orstangon the mic alr tep ral of the Seaffoldplattorm, cacwark | Steer [22 N/A WA az me > wa | cLoseo 1 Striana TOOTS with mushroomed” hneods shall be “Gressed' to avoKd splinterng 2. Wooden and fiberglss handles shal never be Gr Woke Pointed. thismey | Superstar hse defects 3. Maintaie proper 4. No bolthg or Uunboting activity Is bilowedwinen the line s pressurized, wrnry | catty | rerona ry a|2 wa wa |) )a) va | etoseo Fowiton te / Date 00/80-Sep 2021 Page 5 of Manne @ GoLon JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM ~ L2, EHSS TARGET DATE FOR | a extra | RespoNsi ae RESPONSIBLE | INHERENT | wivigaTion/ | “BLEFOR | RESIDUAL | Losing | stATUS CONSEQUENCES/ CURRENT MITIGATION Risk LecroR | “EXTRA Pree iPAcr mance SSE wean aE = activity HAZARD Pic|R pic[r 5. Eraure correct PPE 6. Assign competent Beteon for the jb. ‘lays maint boy postion 1 Pawar foals must bbe inspected by competent person and color Ede tes! 2. Ensure prope nal eran cacwor power tos 3 joc weet Pai N/A wa ad Pe i a | wa | cLoseo aenSa =a ieee 2 eet Refueling the generetor ‘con ts stored extcaars entre nore ee a EeSceener Snare Seems . Frere ore | emer |e cca seme wa |e ere oa = tienes ore iret ieee, eee a Bes eunaare zo 1 ee ie Hocon es/ Sule oa/so-seasoe" vige of 2c MARDEN 4) UaLoo EHSS v JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 TARGET oarerOR = XTRA RESPONSI RESPONSIBLE | werent | mmigaTion/ | ‘BuEFOR | RESIDUAL | cote | srarus consequences) cunnenrmmcAvion | ¢yfOR, | RISK cra | RISK | GhOSING, ae MITIGATION mmigatio MITNGATION se . acriiry WAZARD Ne. plete PpepR & Usea ciptray to eep the Joey can, 9, ttthore any hat work inthe area, Fuel ond Flammable materials should away from ‘open lame 12 mand inelide in Rot work peri. Poncinnny | SSoRReES 2Whiestackig the resanes ounot weet ot re eon Nears bevre Farencon Sstiabe tig Per feorect hee | cacwor wl ev lw oe ee Belo the Taran cio (eee a (Ie wa wa |M\w IY! wa | eLoseD SSRIS moet Eacemene ‘work areas shall be m antained with good fousekeeping 5,.Use Proper PPE and Fellow miWSPC safe work pronedure = ce Environment, cr Hels 3) Safety = @) Probability, (C) Consequence, (R) Rsk Rank Retr to EMSS Ask Assessment Fattls, BHS-MS-002-PO3-MXO1 List of required [Safety Helmet, Safety Shoe, Hand Gloves Hand gloves, Mono Goggles, Face shield, Safety Harness PRES: vito es / Sete 00730-5020" pe Bet : ze cuss MaADEN @) Ulan JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 ‘Attached Supporting Document/ Drawing (if necessary): 01 YES ONO NAME partment/Company 1D Badge Number ‘Signature SK DESILVA HSE/GAC 600888 Designated Team ——= | Rowe SIVANATHR HSE/oAC 610887 atte Tati = eee SAM MOHAN —__eonsvcnon ene [scoeso Gosais FURQUAN AHMED MWSPC-TECH. ENG & DESIGN ao ‘ABDEL RAHMAN SAID ALNUBAN! ‘SENIOR COORDINATOR, LOSS PREVENTION $0210 ‘Team Leader: The team have reviewed alliob steps ofthis job tough this JSA /Rik Assessment. EHSS Role: have reviewed and agreed with allab steps offs JSA/Risk Assestment me BIDE AE 52% lees Dept: PHO DEA Jetarherern Name &1D: Nuhewed AV lio — Dept: YS sion Date: 9 sat ay Sion = Date: oth uly - 2003 Moderate Risk Le J Area Owner (Department Manager or Equivalent): Job steps and remaining risks read and agregar name aio: GA 6.360 _ oot on Sion bate: \> (Sol [yea = ‘Approval ~~ High Risk Level Approval Extreme RIK La ‘concerned (Director or Equivalent): Job steps and remaining risks read and agreed, President (or Equivalent Position): Job steps and remaining risks reac and agreed, Name & 0: Sign: Date: Name & 10 Sign Date caren ab is — MAADEN 4) UaLon JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM ~ L2 ‘Action/ Measures to be taken During Emergency cPart uf the Tovlbus Talk) + INCASE OF ALARM oF EMERGENCY OCCURRENCES, ALL WORK ACTIVITIES SHALL BE IMMEDIATELY STOPPED. = Action for Work Supervisor or Workers Crew: Work Supervisor or any of MWSPC Personal who is available at site shall be informed so action can be taken accordinaly Immediately go to the hearest Assembly Point Area, = Action for MWSPC personnel: Emergency Resnonée shall be activated as per situation accordingly (e.g. Fire Alarm Manual Call Point/Pull station. call on Emergency Radlo Channel or by Telephone) «) Fite/ Explosion ~ If safe to do so, extinguish the fire immediately using fire extinguisher. If not safe, proceed to assembly area and wait for further instruction. ») Injury = Depending on the situation, move the victim to a safe location (if possible or safe to do so). Wait until Fire/Rescue Team arrives. and inform MWSPC Clini. ©) Person collapsed in the confined space - DO NOT attempt to rescue the person inside the confined space, Wait until Fire/Rescue Team arrives. ) Hazardous/ Chemical Material Spillage - If the spillage occurs, contain the spillage by using available spill kit, if not possible wait until Fire/Rescue “eam arrives. 1) Is the task safe to do in today's weather conditions? O Yes ONO. | 2) Are you aware of, and do you have the correct PPE? 0 Yes c.NO 3) Do you have the right tools, and are they in good conditions & certified? 0 Yes G NO 4) Do all team members have 2 full understanding of the task? 1D Yes c.NO 5) ls the work area free from conflicting activities? 0 Yes 0 No 6) Are Area Manuel call point, Assembly ooint & Safety Shower known? O Yes ONO If you answer NO to any of the above questions, then corrective action shall be taken BEFORE starting the work, This Toolbox Talk Session conducted by (Maintenance/ Project Work Supervisor) Name: ] ID No. Date: Time: Sign iL BADGE NO. 8 SIGN [BADGE NO. & SIGN BADGE No. BADGE NO. & SIGN BADGE NO. & SIGN Employees participating in Toolbox Session withthe + | ‘work related to this JSA, I have reviewed, understood, and agreed with all steps of this JS and risk associated with activities, MADEN 4) UaLoo EHSS + JOB SAFETY ANALYSIS (RISK ASSESSMENT) FORM - L2 NAME: BADGE NO, Ercan Peas Excris Propared by (Permit Receiver) ‘Approved by (Work Supervisor) | Reason of changes: Work Supervisor Changed Job Step(s) Changed _O) Hazards/ Risk Changed | Reviewed by (Permit issuer) joa Owner Representative: Jobs steps need toe read & agreed for the chonge/s. Malntenance/ Project/ Contractor Work Supervisor. Jobs steps need tobe read & agreed forthe change/s, | Acknowledged by ‘company/ Oe se Comoony/ beet: sx J emarte/Conmens Ra RO Sac Seracaeczcre

You might also like