Ball Park Estimate Of A Project
I would like to talk about question no. #6 In order to discuss on every step of the project, the project manager should be estimate the cost seriously. It ...

Project Earned Value Exercise Paper


Work Package 3 has just commenced. So far, Work Package 4 has not started at all. Finish the following earned value report table. The full budget for this pr...

CARD RANGE TO STUDY

1 through 1538

Click or Press Spacebar to Begin »

Use LEFT and RIGHT arrow keys to navigate between flashcards;

Use UP and DOWN arrow keys to flip the card;

H to show hint;

A reads text to speech;

1538 Cards in this Set Share Print Export Clone

Front Back

https://www.cram.com/flashcards/pmp-test-5124951 1/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The cost estimate with the most precise estimate


(i.e., the smallest range of error) is the ________
estimate.
A. engineering
Answer: D
B. budget
C. concept
D. definitive
E. contingency

The cost estimate that has a range for error of


minus 10 percent to plus 25 percent is the
________ estimate.
A. budget
Answer: A
B. definitive
C. parametric
D. analogy
E. contingency

There are usually two types of reserves in a


project's budget. The ________ reserve is for cost
variances from the plan because of inaccurate
estimates or pricing and costs overruns, while the
________ is to accommodate costs for project
work that were not included in the plan through
Answer: C
error or oversight.
A. project; budget overrun allowance
B. engineering; management allowance
C. management; contingency allowance
D. management; mismanagement allowance
E. planned; unplanned work allowance

Feasibility studies are evaluations of both the


technical and economic aspects of a potential
project. In the economic area, one would look at
such items as interest rates, present worth factors,
capitalization costs, and ________.
Answer: B
A. human resource skills
B. depreciation costs
C. prospective projects managers
D. implementation of cost controls
E. availability of cost accounting methods

Project financing can be extremely complex and


can come from a variety of sources. However,
________ is not a potential source of financing for
a project.
A. borrowing money from a bank Answer: D
B. selling stocks in the project or corporation
C. selling bonds on the project
D. selling lottery tickets on the project
E. leasing or renting existing property to another

https://www.cram.com/flashcards/pmp-test-5124951 2/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Life cycle costing is a concept whereby all costs for


a system are computed to determine the total cost
of ownership. Life cycle cost categories include
________.
A. purchase, repair, and operation
Answer: B
B. development, procurement, and
operation/maintenance
C. procurement, lease, and disposal
D. procurement, operation, and disposal
E. operation, maintenance, and storage

The integration of cost and schedule to provide


measures of the project's performance is the
earned value system, or contract performance
measurement. The baseline for the earned value
system is depicted as a slight "S" curve because
________.
A. there are fewer costs at project initiation until the
work force is fully staffed
B. there are workers who have not been paid, so
Answer: C
the expense is not shown on the chart
C. there are more expenses to get a project started
than are required on a normal operating basis
D. this is just a traditional method of plotting the
costs and has no relationship to the actual
expenditures
E. this approximation has proven to be nearly
correct when all costs and expenditures have been
accounted for at project completion

The pricing of a project can be extremely complex


in the development of valid cost estimates and
price quotes from vendors. The tool that facilitates
the pricing of a project by a structured
decomposition of the total into individual elements
of labor, material, and equipment is the ________. Answer: E
A. project management plan
B. budget
C. responsibility matrix
D. configuration management plan
E. work breakdown structure

In estimating the cost of work, the best source of


cost information can be obtained from the
________.
A. customer
Answer: B
B. historical records
C. senior engineers
D. top management
E. independent consultants

Setting up a cost control system requires matching Answer: E


the work packages to the cost accounting system.
The direct mapping of the work packages to the
accounting is accomplished by establishing a
________.
A. work package cost/price
B. work breakdown structure element
C. cost correlation matrix
D. computer coded bar chart
E. code of accounts
https://www.cram.com/flashcards/pmp-test-5124951 3/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Cost overruns on a project have major impacts on


the profitability of operations, but ________ do(es)
not necessarily contribute to cost overruns of a
project budget.
A. a change in contract scope Answer: A
B. delays in schedule
C. lack of work force experience
D. integration uncertainty for project elements
E. contractor claims for out-of-scope work

Suppose the contingency allowance established to


cover unforeseen activities of a project has been
set at eight percent of the total project cost. The
total dollars in the contingency allowance should
be ________ as the project nears completion.
A. retained at the remaining dollar level Answer: E
B. increased to meet unidentified surprises
C. decreased to reduce the accounting work
D. spent to ensure there is no extra money shown
in the budget
E. reduced to a percentage of the remaining work

Suppose a contract has been in force for six


months and the work is progressing, and then the
buyer requests some changes in the design. The
changes do not affect completed work but add
some new items and subtract some existing items.
The cost to the buyer to accomplish these changes
is ________.
A. increased by the amount of added work Answer: E
B. unchanged because the contract is in place
C. decreased because the work has not been
started
D. unchanged because the buyer (customer) is
always right
E. unknown because the cost of the changed work
is not specified

In the earned values system, the focus is on "cost


of work," which is divided into "scheduled" and
"performed" work. This is further defined as
"budgeted" and "actual" work. The formula "BCWP
- BCWS" provides the ________.
Answer: B
A. cost difference
B. schedule variance
C. overrun conditions
D. schedule difference
E. cost variance

https://www.cram.com/flashcards/pmp-test-5124951 4/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Indices can provide an indication of the status of a


project. In the earned values system, there are two
indices
Cost Performance Index (CPI) and Schedule
Performance Index (SPI). The formula for CPI is
________. Answer: C
A. ACWP/BCWS
B. ACWP/BCWP
C. BCWP/ACWP
D. BCWS/ACWP
E. BCWS/BCWP

Suppose that in the earned value system, the


status of the project is reported as BCWS = 100,
ACWP = 110, BCWP = 95. The project is now
________.
A. underspent and behind schedule Answer: D
B. overspent and ahead of schedule
C. underspent and ahead of schedule
D. overspent and behind schedule
E. cannot be determined from available data

Projects have direct and indirect costs that the


project manager must track to ensure the budget is
not exceeded. The project manager has the most
control over direct costs such as ________.
A. bonuses, fees, and awards Answer: B
B. labor, materials, and equipment
C. labor, supervision, and fees
D. overhead, G&A, and fees
E. G&A, facilities, and transportation

A project is being advertised to solicit bidders. The


buyer has asked for two types of price first, if
payment is made in total upon completion of the
project; second, if payment is made 50 percent at
the midpoint of completion and 50 percent upon
total completion. This is a two-year project that is
being priced at $10,000,000 when the cost of
money is not included. Assume money is borrowed
in two equal increments-at the start of year 1 and
Answer: D
year 2. If the interest rate over the two years is
eight percent, the total bid under each option (i.e.,
payment at the end; payment at midpoint) is
________.
A. $11,844,000; $11,412,000
B. $10,400,000; $10,040,000
C. $10,800,000; $10,400,000
D. $11,232,000; $10,832,000
E. $12,484,000; $11,244,000

https://www.cram.com/flashcards/pmp-test-5124951 5/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The cost of money and cash flow can adversely


affect the financial status of the project. One
method of encouraging early payment of invoices
is to offer a discount for payment within a few days.
If an invoice for $10,000 was paid within (x) days
(see each possible answer for value of x), the
method "two 10, net 30" would provide a savings of Answer: D
________.
A. $100 (x = 30)
B. $200 (x = 30)
C. $300 (x = 10)
D. $200 (x = 10)
E. cannot be determined from available data

Project financial audits are used to determine the


current status of the financial health of a project,
but ________ is/are not an area for financial audit.
A. a project budget system
Answer: B
B. a project computer system
C. a project change control
D. a project status reporting
E. cash-flow projections

A project audit is often a three-step process using


different skills to assess the condition of the health
of the project. The first audit, or first audit
opportunity, is at the ________ phase.
A. start of the planning Answer: C
B. start of the implementation
C. end of the planning
D. end of the implementation
E. middle of the implementation

The budget for a project is the baseline from which


future expenditures are measured. Of the following,
________ do(es) not cause change to the budget
baseline during project implementation.
A. change orders to the contract
Answer: B
B. expenditures to buy materials
C. revised cost estimates made in-house
D. changes to subcontractor's scope of work
E. correction to the work breakdown structure to
eliminate some tasks

https://www.cram.com/flashcards/pmp-test-5124951 6/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

In the earned value system for determining project


status, there are several methods of accepting
credit for the completion of work. In the most
common method, full credit is allowed after the
work package is complete. A second method is to
allow full credit when 50 percent of the work
package is complete to permit the performing
contractor (seller) to receive credit for work-in-
process. From the seller's point of view, ________.
A. either method is acceptable under an
incremental payment schedule contract
Answer: D
B. the credit at 100 percent completion is better for
either a lump-sum or incremental payment contract
because the accounting is more accurate
C. the credit at 100 percent completion is better
because the accounting lags the work-in-process
by 30 days in any type of payment schedule
D. the credit at 50 percent completion is better
because it improves the cash flow under an
incremental payment schedule
E. the credit at 50 percent completion is better
because it reduces the billing cycle

Because of the investment or risk associated with a


project, the decision may be to ensure a high
profitability. When this is the case, senior
management should agree on profit ________ of
the project.
Answer: D
A. capability at the beginning
B. margin (rate) at the midpoint
C. margin (rate) at the end
D. goals at the beginning
E. goals at the end

Estimating costs for a project is difficult because of


the lack of historical cost records, the uncertainty
regarding the future state of the economy, and the
lack of understanding as to the full scope of work.
Successive estimating is one method of accounting
for the uncertainty of cost estimating by ________.
A. making three estimates and taking the average
B. continually making estimates as the project Answer: C
progresses
C. also including the range of potential error for an
estimated item
D. using two or more cost estimating techniques to
arrive at an average cost
E. delaying estimates until all information is
acquired

The degree of uncertainty (lack of information) in a


project affects the ability of cost estimators to make
precise estimates to determine the total cost. One
method to resolve the uncertainty is influence
diagramming, which is used to evaluate ________.
A. price, net worth, and net present value Answer: B
B. alternative outcomes, risk factors, and given
quantities
C. risk factors, price, and alternatives
D. price, quantities, and time of purchase
E. risk factors, contract type, and project duration

https://www.cram.com/flashcards/pmp-test-5124951 7/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The most accurate estimates (and the most


expensive to produce) are _______.
A. analogous estimates
B. parametric estimates Answer: D
C. top-down estimates
D. bottom-up estimates
E. function point estimates

The ________ identifies the project elements that


costs will be allocated to.
A. work breakdown structure
B. PERT estimates Answer: A
C. earned value
D. order of magnitude estimate
E. BCWR

The EAC is a forecasting technique based on past


project performance. It can be calculated using the
formula ________.
A. cumulative actuals + (ETC X CPI)
B. cumulative actuals + new estimate for cost of Answer: D
work remaining
C. cumulative actuals + remaining budget
D. all of the above
E. none of the above

The best way to manage the costs of change


requests is to ________.
A. accept them orally
B. allow them to happen in ad hoc fashion Answer: D
C. impose change unilaterally
D. document and authorize all changes
E. use the earned value system

Materials management is crucial to the success of


the project when resources are needed at a
specified time and place to ensure continued
progress. An assessment of the materials costs
should consider not only the cost of purchase but
also ________. Answer: C
A. transportation, deterioration, and storage
B. storage, damage, and deterioration
C. transportation, storage, and shortage
D. transportation, storage, and loss
E. quantities, storage, and damage

. Project financing is critical to large projects where Answer: E


neither the owner (buyer) or contractor (seller) has
sufficient funds available to cover the costs
incurred during project implementation. In such
cases, a third party must provide the necessary
capital. The third party evaluates the feasibility of
financing the project based on ________.
A. the participants' business reasons for the project
B. the share of ownership to be retained
C. the level of risk the participants are to share
D. the project's anticipated cash flow and tax
benefits, if any
E. all of the above
https://www.cram.com/flashcards/pmp-test-5124951 8/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The financing plan for a project should detail the


methods of obtaining and dispensing the capital
over the full duration of the project. In preparing the
plan and considering risk and reward, management
should ensure that participants' credit standing is
preserved, maximum leverage is used, tax benefits
are optimized, flexibility is incorporated into
Answer: C
ownership, and ________.
A. additional tax relief is pursued
B. lines of credit are opened
C. accesses to sources of new capital are
maintained
D. maximum financing is used
E. late receipt of funds is avoided

Investors are often used to obtain the necessary


financing for major projects, which can transfer the
ownership to the investors. The system is then
leased back for operation and use. The major
advantage for the investors is ________ , and the
major advantage for the user of the system is
________.
A. control of a business; low risk for operation and Answer: C
maintenance
B. high internal rate of return; favorable tax write-off
C. favorable tax write-off; new source of funds
D. ownership without risk of operation; favorable
tax write-off
E. reduced quality (performance) risk; reduced cost
risk

Which is not an element of procurement


management?
A. Purchasing
B. Expediting Answer: E
C. Acquisition
D. Marketing
E. C and D

The purchasing cycle consists of all the following


elements except?
A. Defined Need
Answer: C
B. Transmit Need
C. Inspection
D. Price & Terms

The cost of corrective action taken by the


purchaser and chargeable to the supplier under the
terms of the contract is
A. Payment authorization Answer: D
B. Bid cost considerations
C. Release payment
D. Back charge

https://www.cram.com/flashcards/pmp-test-5124951 9/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

__________ is a narrative description of the work


to be accomplished or resource to be supplied.
A. Purchase order
Answer: C
B. Level of effort work
C. Scope of work
D. Contract stipulation

By which means is a contractor able to control


costs overruns due to changing requirements?
A. Project Data review
Answer: C
B. Change order
C. Change Control
D. Contract negotiations

_________ is a written order directing the


contractor to make changes according to the
provisions of the contract documents.
A. Change order/purchase order Amendment Answer: A
B. Contract order Modifications.
C. Contractor claim
D. Owner Directive

_________ is a request for interim stoppage of


work due to non conformance, funding or technical
considerations
A. Bid Protest Answer: B
B. Stop Work order
C. Notice to Proceed
D. Supplier Default Notice

_________ defines when the work is ready for or is


being used for the purpose intended and is so
certified.
A. Final Completion Answer: B
B. Substantial Completion
C. Final Acceptance
D. Mechanical Completion

The process that may be used by an unsuccessful


supplier to seek remedy for a non award of work is
A. Bid Protest
Answer: A
B. Stop Work Order
C. Back charge
D. Contract Dispute

The __________ specification describes, defines


or specifies the goods/services to be supplied.
A. Performance
B. Functional Answer: C
C. Technical
D. Bid
E. General Requirements

https://www.cram.com/flashcards/pmp-test-5124951 10/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The Bid Evaluation process is characterized by all


of the following activities except?
A. Evaluation of suppliers financial resources
B. Ability to comply with technical specifications, Answer: E
C. Delivery schedule and Cost factors
D. Performance Record
E. Competitors' method of sourcing

Which is not a consideration in a make or buy


decision?
A. Cost factors
B. Sales Volume Answer: B
C. Existence of sufficient administration/technical
personnel
D. Political and, social factors with the organization

There are four methods of government


procurement. Which is not one of these methods?
A. Assistance
B. Sealed Bidding Answer: D
C. Competitive proposals
D. Acquisition
E. Small Purchases

A purchasing operation does not contain this


classification of work
A. Management
B. Buying Answer: D
C. Follow up and expedition
D. Marketing
E. Clerical

__________ is a register of suppliers invited to


submit bids for goods/services as specified.
A. Procurement invitation
Answer: B
B. Bid List
C. Resource Identification
D. Supplier's Rankings

__________ is a formal invitation to submit a price


for goods and/or services as specified.
A. Request for Quotation
B. Bid Response Answer: A
C. Intention for Bid
D. Invitation for Bid
E. Request for Proposal

Which contract type should be used by the owner


on a high risk project?
A. Cost Plus Percentage of Cost
B. Cost Plus Incentive Fee Answer: C
C. Lump Sum
D. Fixed Price Plus Incentive Fee
E. C and D

https://www.cram.com/flashcards/pmp-test-5124951 11/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Cost Reimbursable contracts are equivalent to


A. Progress Payment Contracts
B. Extra Work Order Contracts Answer: C
C. Cost Plus Contracts
D. Fixed Price Contracts

Fixed price and incentive type contracts place


responsibility for performance and financial risks
associated with delay or non performance on the
A. Contractor Answer: A
B. Owner
C. Lending Institution
D. Project Manager

__________ is based on information gathered and


analyzed about demand and supply. This forecast
provides a prediction of short and long term prices
and the underlying reasons for those trends.
Answer: D
A. Sales forecast
B. Consumer Price Index
C. Production forecast
D. Price forecast

The contract is signed at the end of the


A. Pre-award phase
B. Award phase
Answer: E
C. Post-award phase
D. Solicitation phase
E. Award cycle

Definitive contract terms are spelled out in the


A. Pre-award phase
B. Award phase
C. Post-award phase Answer: C
D. Purchasing phase
E. Pre-award phase for fixed cost contracts, and
Award phase for cost plus contracts

A bilateral RFP is preferred to an invitation to bid


when
A. supplier and terms are specified
B. the product or service is relatively low value and
readily available Answer: C
C. the product or service has high value and is
unique
D. the product or service has high value, but is
easy to obtain

PMI suggests which of the following behaviors as


part of contract negotiations?
A. Protocol, probing, scratching
B. Sniffing and smelling (olfactory) Answer: A
C. Touching and caressing (tactile)
D. Mind-reading and extra-sensory perception
E. None of the above

https://www.cram.com/flashcards/pmp-test-5124951 12/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The bid package is developed in the


A. Requirements phase
B. Requisition cycle
Answer: B
C. Solicitation cycle
D. Award cycle
E. Award phase

The Award phase includes the


A. requirements, requisition and award cycles
B. award and contractual cycles
Answer: D
C. requisition and solicitation cycles
D. solicitation cycle
E. cycles required for the contract

To relieve pressure on the project schedule, Diane


decided to fast-track and hire a contractor to do
part of the work. Which form of contract(s) should
she consider?
A. None. Fast-tracking is a very poor time to
Answer: E
consider a contractor.
B. Fixed lump sum
C. Cost plus incentive
D. Cost plus percentage of cost
E. c and d

Which is not a factor in choosing a contractor?


A. Complexity of requirements
B. Price competition
Answer: E
C. Competency
D. Capacity
E. none of the above

Requirements and specifications are always


changing in the systems integration business.
Therefore, the best form of contract for this
environment would be
A. the form of contract required to get the best Answer: C
contractor
B. Fixed price
C. Cost plus
D. Overseas

In the area of contracting, there are two basic types


of contracts that reflect how the total price is
determined. The ________ contract has an
objective of a pre-determined end price while the
________ contract has an objective of a target end
price. Answer: D
A. full value; partial value
B. definitive; undefined
C. incentive fee; award fee
D. fixed price; cost-plus
E. end price; target price

https://www.cram.com/flashcards/pmp-test-5124951 13/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

A contract is a promise to provide goods and/or


services to one party in return for something of
value from that party. To define the goods,
services, and something of value in a legal
document, the contract must be comprised of
________.
A. an explicit work and product description
B. a generic statement of the requirements
Answer: C
C. a basic contract, a statement of work, a
specification, and a list of documentation
requirements
D. statements of the requirements using language
that describes the physical characteristics and the
amount of money to be paid for the delivered
products
E. none of the above

The selection of the type of contract is important


because of the cost risk involved. In most cases,
the buyer (owner) will attempt to transfer the risk to
the seller (project sponsor). The buyer, therefore,
will always attempt to award a(n) ________
contract to the seller. Answer: A
A. fixed price
B. cost-plus
C. time and materials
D. definitive
E. incentive fee

The buyer has not completely defined all the


requirements for the project but has enough
definition to start. The type of contract that will most
likely be awarded while additional requirements are
being finalized is the ________ contract.
Answer: B
A. letter
B. cost-plus
C. fixed price
D. variable price
E. temporary

Contracts may be written in any form that is


understandable and enforceable, and often project
personnel attempt to be "creative" in developing
the document. Given a choice, it is best to
________ to meet the requirements of the project.
Answer: C
A. prepare a unique contract
B. tailor an old contract
C. use standard clauses in contracts
D. avoid using contractual documents
E. mix standard and unique clauses

https://www.cram.com/flashcards/pmp-test-5124951 14/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

A purchase order can be considered a contract


with a vendor to provide a number of parts or
components that will be used in project
implementation. The purchase order becomes a
"contract" when it is ________.
A. issued by the project procurement section Answer: D
B. received by the vendor
C. filled by the vendor
D. accepted and signed by the vendor
E. completed through delivery of the products by
the vendor

The marketplace often dictates the price of


products and services through competitive or non-
competitive supply situations, which will vary from
many suppliers to one supplier. However,
________ is not a market condition.
Answer: A
A. mixed competition
B. pure competition
C. monopolistic competition
D. oligopoly
E. monopoly

The contracting process for the negotiation and


legal execution is divided into pre-award, award,
and post-award phases and five cycles that
describe the activities under the phases. The first
cycle under the pre-award phase is the ________
cycle. Answer: B
A. requisition
B. requirement
C. solicitation
D. award
E. contractual

Project management, as an integration function,


has the need to either make or buy components of
the system. The decision to make or buy is based
on all the following but ________.
A. availability of people Answer: B
B. availability of funds
C. technology/know-how
D. availability of contractors/manufacturers
E. price

A contract is a stand-alone legal document and


must be individually managed to ensure the proper
performance. Many projects have several contracts
to be initiated and executed throughout the life of
the project. Therefore, it is best to have a
________ that anticipates and describes the types
Answer: D
of contracts required for the project.
A. responsibility matrix
B. listing of contracts
C. contracting manual
D. project contract management plan
E. project configuration management plan

https://www.cram.com/flashcards/pmp-test-5124951 15/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Contracts for projects require revisions to meet the


project needs as those needs evolve. The correct
method of initiating a change to the contract is to
prepare a ________ for submission to the
customer (buyer).
Answer: D
A. change notice
B. new contract
C. change order
D. proposal
E. plan

Changes to a contract are approved and signed by


both the buyer and seller as the desired
performance requirements. These changes are
________.
A. separate contracts between the customer and
the project
Answer: C
B. stand-alone subcontracts to the prime contract
C. an integral part of the prime contract as an
amendment
D. secondary in legality to the prime contract
E. primary in legality and the prime contract
becomes secondary

The concept of warranty is based upon one party's


assurance that the product or service will meet
certain standards of quality, including ________.
A. function, performance, durability, and desirability
B. appearance, desirability, reliability, and
maintainability
Answer: D
C. desirability, reliability, durability, and
maintainability
D. reliability, maintainability, function, and
repairability
E. condition, reliability, description, and
function/performance

Warranties are given in two manners, either implied


or expressed. The implied warranty differs from the
expressed warranty in that the implied warranty
________.
A. is always given by a sales person
B. is always written at the time of sale Answer: D
C. gives specific descriptions of the product's
qualities
D. is not a recorded statement of the
characteristics of the product
E. none of the above

A project manager may issue a "waiver" on items


received from a vendor because the items are less
than the purchase order specified. If the project
manager knowingly accepts faulty material, the
vendor is usually ________ any damages that the
material may cause. Answer: B
A. held responsible for
B. relieved of responsibility for
C. made to pay a percentage of
D. willing to repair/correct
E. not paid in the amount of

https://www.cram.com/flashcards/pmp-test-5124951 16/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

A contract may include a clause that imposes a


penalty on the project for late delivery of the
completed system. Although the contract specifies
a specific monetary penalty for delays, the key(s)
to the issue is/are ________.
A. whether the delays were necessary for safety
B. whether the delay could be anticipated by the Answer: C
project manager
C. who caused the delay (buyer or seller) and the
nature of the interruption
D. why the delay affected the delivery of the
system
E. all of the above

A contract is a promise to provide goods and/or


services to one party in return for something of
value from that party. To define the goods,
services, and something of value in a legal
document, the contract must be comprised of
________.
A. an explicit work and product description
B. a generic statement of the requirements
Answer: C
C. a basic contract, a statement of work, a
specification, and a list of documentation
requirements
D. statements of the requirements using language
that describes the physical characteristics and the
amount of money to be paid for the delivered
products
E. none of the above

The selection of the type of contract is important


because of the cost risk involved. In most cases,
the buyer (owner) will attempt to transfer the risk to
the seller (project sponsor). The buyer, therefore,
will always attempt to award a(n) ________
contract to the seller. Answer: A
A. fixed price
B. cost-plus
C. time and materials
D. definitive
E. incentive fee

The buyer has not completely defined all the


requirements for the project but has enough
definition to start. The type of contract that will most
likely be awarded while additional requirements are
being finalized is the ________ contract.
Answer: B
A. letter
B. cost-plus
C. fixed price
D. variable price
E. temporary

https://www.cram.com/flashcards/pmp-test-5124951 17/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

Contracts may be written in any form that is


understandable and enforceable, and often project
personnel attempt to be "creative" in developing
the document. Given a choice, it is best to
________ to meet the requirements of the project.
Answer: C
A. prepare a unique contract
B. tailor an old contract
C. use standard clauses in contracts
D. avoid using contractual documents
E. mix standard and unique clauses

A purchase order can be considered a contract


with a vendor to provide a number of parts or
components that will be used in project
implementation. The purchase order becomes a
"contract" when it is ________.
A. issued by the project procurement section Answer: D
B. received by the vendor
C. filled by the vendor
D. accepted and signed by the vendor
E. completed through delivery of the products by
the vendor

The marketplace often dictates the price of


products and services through competitive or non-
competitive supply situations, which will vary from
many suppliers to one supplier. However,
________ is not a market condition.
Answer: A
A. mixed competition
B. pure competition
C. monopolistic competition
D. oligopoly
E. monopoly

The contracting process for the negotiation and


legal execution is divided into pre-award, award,
and post-award phases and five cycles that
describe the activities under the phases. The first
cycle under the pre-award phase is the ________
cycle. Answer: B
A. requisition
B. requirement
C. solicitation
D. award
E. contractual

Project management, as an integration function,


has the need to either make or buy components of
the system. The decision to make or buy is based
on all the following but ________.
A. availability of people Answer: B
B. availability of funds
C. technology/know-how
D. availability of contractors/manufacturers
E. price

https://www.cram.com/flashcards/pmp-test-5124951 18/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

A contract is a stand-alone legal document and


must be individually managed to ensure the proper
performance. Many projects have several contracts
to be initiated and executed throughout the life of
the project. Therefore, it is best to have a
________ that anticipates and describes the types
Answer: D
of contracts required for the project.
A. responsibility matrix
B. listing of contracts
C. contracting manual
D. project contract management plan
E. project configuration management plan

Contracts for projects require revisions to meet the


project needs as those needs evolve. The correct
method of initiating a change to the contract is to
prepare a ________ for submission to the
customer (buyer).
Answer: D
A. change notice
B. new contract
C. change order
D. proposal
E. plan

Changes to a contract are approved and signed by


both the buyer and seller as the desired
performance requirements. These changes are
________.
A. separate contracts between the customer and
the project
Answer: C
B. stand-alone subcontracts to the prime contract
C. an integral part of the prime contract as an
amendment
D. secondary in legality to the prime contract
E. primary in legality and the prime contract
becomes secondary

The concept of warranty is based upon one party's


assurance that the product or service will meet
certain standards of quality, including ________.
A. function, performance, durability, and desirability
B. appearance, desirability, reliability, and
maintainability
Answer: D
C. desirability, reliability, durability, and
maintainability
D. reliability, maintainability, function, and
repairability
E. condition, reliability, description, and
function/performance

Warranties are given in two manners, either implied Answer: D


or expressed. The implied warranty differs from the
expressed warranty in that the implied warranty
________.
A. is always given by a sales person
B. is always written at the time of sale
C. gives specific descriptions of the product's
qualities
D. is not a recorded statement of the
characteristics of the product
E. none of the above
https://www.cram.com/flashcards/pmp-test-5124951 19/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

A project manager may issue a "waiver" on items


received from a vendor because the items are less
than the purchase order specified. If the project
manager knowingly accepts faulty material, the
vendor is usually ________ any damages that the
material may cause. Answer: B
A. held responsible for
B. relieved of responsibility for
C. made to pay a percentage of
D. willing to repair/correct
E. not paid in the amount of

A contract may include a clause that imposes a


penalty on the project for late delivery of the
completed system. Although the contract specifies
a specific monetary penalty for delays, the key(s)
to the issue is/are ________.
A. whether the delays were necessary for safety
B. whether the delay could be anticipated by the Answer: C
project manager
C. who caused the delay (buyer or seller) and the
nature of the interruption
D. why the delay affected the delivery of the
system
E. all of the above

Performance bonds are required by some


contracts to ensure the project is completed and
the system functions as specified. A performance
bond should never be for less than ________
percent of the contract price.
Answer: D
A. 25
B. 50
C. 75
D. 100
E. none of the above

Payment bonds are often required by the contract


and require specific actions under the stated
conditions. Payment bonds are specifically
designed to ensure payment of ________ by the
prime contractor.
Answer: D
A. insurance premiums
B. weekly payrolls
C. incremental earned value charges
D. subcontractors, laborers, and materials
E. damages for accidents caused

. Some contracts are not completed because the


contractor fails or refuses to complete the
contractual conditions. This situation is called a
________ for which damages can be assigned.
A. breech Answer: A
B. stop-work
C. flawed contract
D. contract in situ
E. none of the above

https://www.cram.com/flashcards/pmp-test-5124951 20/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com

The time of delivery for a contract is often specified


to ensure that both parties, the buyer and seller,
understand the need for the product, service, or
system on or before that date. When a time is not
specified in a contract, it is assumed that
performance must be completed ________.
A. at the same pace as other work Answer: E
B. sooner than contracts of a lesser dollar value
C. in the order in which the work (contract) was
accepted
D. as soon as possible, but without causing the
seller any additional expense
E. within a reasonable time

The project manager is responsible for all the


activities within a project and interfaces with
external functions, all of which consume his/her
time. Therefore, when a contract administrator is
assigned to the project, the project manager
________ the contract.
Answer: C
A. does not need to manage
B. can transfer all responsibility to the contract
administrator for matters related to
C. must still manage all major aspects of
D. must know only the general contents of
E. is not concerned with the management of

The final step on a project is the close-out phase


where all activities are to be terminated in a
business-like fashion. From a contractual point of
view, the prime consideration is to determine
________.
A. the profit made on this project
B. who must be notified that the contract is
completed Answer: C
C. the degree to which the project met the
provisions of the contract
D. what reports are required to terminate the
contract
E. how many changes were made in the course of
the project and whether all the changes are
accounted for

Page 5 of 16   |   Showing 100 cards per page Previous| Next

Cram has partnered with the National Tutoring Association Claim your access

Ready To Get Started? Discover Company Follow

Create Flashcards About Facebook

Create Flashcards Mobile Apps FAQ Twitter


Support

https://www.cram.com/flashcards/pmp-test-5124951 21/22
7/18/23, 2:20 PM PMP - test Flashcards - Cram.com
Legal

Accessibility

©2023 Cram.com Privacy Policy About Ads Site Map Advertise Do Not Sell or Share My Personal Information

https://www.cram.com/flashcards/pmp-test-5124951 22/22

You might also like