2023.01.31 - 20080 - DTI 31 Unit Family Housing Complex (6586-19095) - Addendum #3
2023.01.31 - 20080 - DTI 31 Unit Family Housing Complex (6586-19095) - Addendum #3
Charlottetown, PE
C1A 1A3
902.816.0216
Addendum #03
PROJECT NAME: DTI 31 Unit – Family Housing Complex
PROJECT #: 20080
DTI REFERENCE #: 6586-19095
ISSUED DATE: 2023-01-31
The following amendment to the tender documents is effective immediately. This addendum shall form part of the
contract documents. All Addenda shall be listed in the submitted Tender Form.
Item Description
SPECIFICATIONS:
SPECIFICATIONS:
.1 Clarification: The first test and imaging shall be performed once the following building components have
been installed:
.4 Poly on interior walls prior to the installation of gypsum board. This will allow for the corrections
prior to finishing.
.5 Any rough-in vents/holes required for M&E systems should be plugged with material for initial
_____________
PAGE 1 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
testing.
.1 Images should be taken of various culprit locations (ie. Window / door installations / top and
bottom plates) etc. Thermal images should be taken during air-barrier testing while building is in
positive or negative pressure for best visual results. Images are to be provided with each air tests
report for consultant and contractors review. Any obvious deficiencies are to be corrected prior
to installation of finishes. Once deficient areas are rectified, thermal images are to provided
varying the correction has been made.
.1 Clarification: This is meant for the Technician coming to site for a maintenance/ service call when there
_____________
PAGE 2 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
is a power outage. The Technician is to bring a rescue device to electrically lift and control the elevator
brake as noted.
A3.7 Ref: Section 23 20 00 HVAC Piping and Pumps
.1 Add “Flofab” to the list of approved equals in 2.14.1
DRAWINGS:
.1 Delete: “152 x 152 x 9.5 galv. HSS Post”, and replace with “90mm x 6.3mm O.D. round galvanized post”.
Posts are to come with brackets to secure wood fence to posts.
.1 Delete: “- Cement Parging above grade to underside of siding”, and replace with “- Exterior grade
Fiberboard from underside of siding to min. 6” below grade”.
.2 Add: “- Dimpled drainage board at base of fiberboard and extend down to footing. Joint between
fiberboard and dimpled drainage board to have a continuous termination bar.
A3.11 Ref: Drawing Sheet A001 – Exterior Wall Assembly – EW2 and EW4
.1 Clarification: “Once wall/stud cavities are filled full of dense-pack cellulose as specified, the contractor is
to confirm the removal of any major bulging with the use of an aluminum roller. This will assist in the
bulging of the finished gypsum-wallboard and failure of mechanical fasteners. The installation process
can be reviewed and confirmed by way of a mockup for the prime consultant’s review and approval
prior to execution of the entire installation.”
.1 Add: “FEC; Fire Extinguisher Cabinet; National Fire Equipment Ltd; CE-950-3-2; Full Glass Door with Tub
Prime Coated with Door and Frame No.4 Satin; Finish – Stainless Steel; 9”w x 24”h x 6”d, Bottom of
Cabinet Box to be 32” above Finished Concrete Level.”
.2 Add: “FE; Multi-Purpose Fire Extinguishers; National Fire Equipment Ltd; WBDL-ABC10; Polyester
Powder Paint Finish with waterproof stainless-steel gauge, reinforced full grip steel handles; See
Architectural floor plans for location (FEC & FE-1). FE-1 is to be added in Room 107 as per this
addendum.”
.3 Add: “FE-1; Fire Extinguisher Wall Hook; National Fire Equipment Ltd; DC 1-1/8” (C160752). One
_____________
PAGE 3 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
required in Room 107.”
A3.13 Ref: Drawing Sheets A200, A201, A300, A301, and A302 – Roof Slopes
.4 Clarification: The roof slopes are to work so that the top of the roofs between Grids 1-12 march in
height. The top of roof slope between Grids A-H are to match the same height, making for a flat portion
of roof as shown in the building elevations and sections.
A3.14 Ref: Drawing Sheet A303 – Detail 3/A300/A303 Section Detail -Typ. Base Connection
.1 Delete: “Cement Parging to extend 6” below grade”, and replace with “Exterior Grade Fiberboard from
underside of siding to min. 6” below grade”.
ATTACHMENTS:
_____________