49 Water Street

Charlottetown, PE
C1A 1A3
902.816.0216
Addendum #03
PROJECT NAME: DTI 31 Unit – Family Housing Complex
PROJECT #: 20080
DTI REFERENCE #: 6586-19095
ISSUED DATE: 2023-01-31

The following amendment to the tender documents is effective immediately. This addendum shall form part of the
contract documents. All Addenda shall be listed in the submitted Tender Form.

Item Description

SPECIFICATIONS:
SPECIFICATIONS:

A3.1 Ref: Section 07 11 26 Self-Adhered Sheet Waterproofing -Foundation

.1 Delete: “2.1.1 Waterproofing Membrane”

.2 Delete: “2.1.2 Primer for Self-Adhesive Membranes”

.3 Delete: “2.1.3.1 Waterproofing Mastic”

.4 Ref: 2.1.3.2 – Add: “.3 Approved Alternate – Aqua-Bloc 720-38”

.5 Ref: 2.1.3.4 – Add” “.4 Approved Alternate – Henry DB2000”

.6 Delete: “3.4 Primer Application”

.7 Delete: “3.5 Waterproofing membrane Installation”

A3.2 Ref: Section 07 25 10 Air Barrier Testing 3.1.1.1

.1 Clarification: The first test and imaging shall be performed once the following building components have
been installed:

.1 All Doors and windows.

.2 Exterior siding – preferable but not required.

.3 Metal roofing along with insulation in attic space/s.

.4 Poly on interior walls prior to the installation of gypsum board. This will allow for the corrections
prior to finishing.

.5 Any rough-in vents/holes required for M&E systems should be plugged with material for initial

_____________
PAGE 1 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
testing.

.2 Clarification: Thermal Imaging guidelines as follows:

.1 Images should be taken of various culprit locations (ie. Window / door installations / top and
bottom plates) etc. Thermal images should be taken during air-barrier testing while building is in
positive or negative pressure for best visual results. Images are to be provided with each air tests
report for consultant and contractors review. Any obvious deficiencies are to be corrected prior
to installation of finishes. Once deficient areas are rectified, thermal images are to provided
varying the correction has been made.

A3.3 Ref: Section 07 25 10 Air Barrier Testing 1.9.1


.1 Delete: “This is required for the administrative portion of the building; these values are not required for
the Apparatus Bays (though the Apparatus Bays must also be tested and reports must be submitted)”

A3.4 Ref: Section 07 27 00 Air Barriers

.1 Ref: 2.1.1.5 – Add: “.3 Blueskin VP160”

.2 Ref: 2.2.1.5 – Add: “.3 Blueskin VP160”

.3 Ref: 2.3.1.3 – Add: “.3 Blueskin SA”

.4 Ref: 2.3.2.1 – Add: “.4 Blueskin SA or Blueskin TWF”

.5 Ref: 2.5.3 – Add: “.3 Henry 925 BES Sealant”

A3.5 Ref: Section 08 71 00 Door Hardware – 3.6 Hardware Groups

.1 Ref: Hardware Groups 01, 02, 04, and 05 – Passage Set

.1 Delete: “J10 DAN”, and replace with “J10 MAR”.

.2 Ref: Hardware Group 03 – Privacy Lock

.1 Delete: “J40 DAN”, and replace with “J40 MAR”.

.3 Ref: Hardware Group 17 – Storeroom Lock

.1 Delete: “T581G6 DAN”, and replace with “WT581P6”.

.4 Ref: Hardware Group 11, 13, and 14 – Mortise Cylinder

.1 Delete: “C987”, and replace with “987”.

.5 Ref: Hardware Group 08

.1 Delete: “J170 DAN”, and replace with “J10 MAR”.

A3.6 Ref: Section 14 21 00 Passage Elevators 1.11.3.4

.1 Clarification: This is meant for the Technician coming to site for a maintenance/ service call when there
_____________
PAGE 2 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
is a power outage. The Technician is to bring a rescue device to electrically lift and control the elevator
brake as noted.
A3.7 Ref: Section 23 20 00 HVAC Piping and Pumps
.1 Add “Flofab” to the list of approved equals in 2.14.1

A3.8 Ref: Section 23 80 00 Decentralized HVAC Equipment


.1 Add “IEC” to the list of approved equals in 2.2.1

DRAWINGS:

A3.9 Ref: Drawing Sheet C-401 – Garbage Enclosure & Pad:

.1 Delete: “152 x 152 x 9.5 galv. HSS Post”, and replace with “90mm x 6.3mm O.D. round galvanized post”.
Posts are to come with brackets to secure wood fence to posts.

A3.10 Ref: Drawing Sheet A001 – Exterior Wall Assembly – EW1

.1 Delete: “- Cement Parging above grade to underside of siding”, and replace with “- Exterior grade
Fiberboard from underside of siding to min. 6” below grade”.

.2 Add: “- Dimpled drainage board at base of fiberboard and extend down to footing. Joint between
fiberboard and dimpled drainage board to have a continuous termination bar.

A3.11 Ref: Drawing Sheet A001 – Exterior Wall Assembly – EW2 and EW4

.1 Clarification: “Once wall/stud cavities are filled full of dense-pack cellulose as specified, the contractor is
to confirm the removal of any major bulging with the use of an aluminum roller. This will assist in the
bulging of the finished gypsum-wallboard and failure of mechanical fasteners. The installation process
can be reviewed and confirmed by way of a mockup for the prime consultant’s review and approval
prior to execution of the entire installation.”

A3.12 Ref: Drawing Sheet A002 – Accessory Product Schedule

.1 Add: “FEC; Fire Extinguisher Cabinet; National Fire Equipment Ltd; CE-950-3-2; Full Glass Door with Tub
Prime Coated with Door and Frame No.4 Satin; Finish – Stainless Steel; 9”w x 24”h x 6”d, Bottom of
Cabinet Box to be 32” above Finished Concrete Level.”

.2 Add: “FE; Multi-Purpose Fire Extinguishers; National Fire Equipment Ltd; WBDL-ABC10; Polyester
Powder Paint Finish with waterproof stainless-steel gauge, reinforced full grip steel handles; See
Architectural floor plans for location (FEC & FE-1). FE-1 is to be added in Room 107 as per this
addendum.”

.3 Add: “FE-1; Fire Extinguisher Wall Hook; National Fire Equipment Ltd; DC 1-1/8” (C160752). One

_____________
PAGE 3 of 4 SableARC
SableARC Studios Sustainable Architecture + Design
required in Room 107.”

A3.13 Ref: Drawing Sheets A200, A201, A300, A301, and A302 – Roof Slopes

.1 Delete: ‘1”/12”’ slope, and replace with ‘5.95°’ slope.

.2 Delete: ‘3”/12”’ slope, and replace with ’13.50°’ slope.

.3 Delete: ‘5”/12”’ slope, and replace with ’22.76°’ slope.

.4 Clarification: The roof slopes are to work so that the top of the roofs between Grids 1-12 march in
height. The top of roof slope between Grids A-H are to match the same height, making for a flat portion
of roof as shown in the building elevations and sections.

A3.14 Ref: Drawing Sheet A303 – Detail 3/A300/A303 Section Detail -Typ. Base Connection

.1 Delete: “Cement Parging to extend 6” below grade”, and replace with “Exterior Grade Fiberboard from
underside of siding to min. 6” below grade”.

ATTACHMENTS:

INCLUSIVE OF COVER PAGE THIS ADDENDUM CONSISTS OF 4 PAGES.

_____________
PAGE 4 of 4 SableARC