MP's performance in utilization of PMGSY funds during XI Plan has been


widely appreciated but adequate funds were not provided on the pretext of
PMGSY guidelines. State has been able to provided road connectivity to all
villages as per the guidelines in short period as compare to other states. To meet
the goal of providing connectivity to all villages irrespective of population state
needs huge resources for which Centre should consider of lowering the population
criterion for providing connectivity to targeted villages under PMGSY during XII
Plan, for
states like Madhya Pradesh which has lower population density (dispersed
population) and high proportion of tribal population.

energy,:- Energy sector plays an important role in the development of agriculture,


industry and social sectors. Bulk of the state's budget outlay during XI Plan was
dominated by energy sector and at the same time there still exists a big gap
between generation and demand. All out efforts are
being made to implement the regulatory reforms besides dedicated effort to
separate the feeder distribution for different category of consumers such as user
for agricultural purposes, domestic and commercial at a very high cost. In case of
thermal power generation, to maintain optimum level of production,
the issues related to rationalization of coal supply and its movement, adequacy
of coal availability and making available the annual contracted quantity of coal
needs to be resolved at the earliest. e Constituted GoM for the purpose should
resolve these constraints relating to the establishment of Thermal Plants by
allocating pit head coal blocks in their proximity to reduce the cost of
movement.

Atal jyoti abhiyan- 24 hrs light in MP started from Jabalpur.

Poverty:-

State welcomes the initiative taken by the Central government to conduct a


fresh survey “Socio-economic Census in Rural Areas 2011” to study the present
socio-economic status of all section of society. The poverty
estimates should not only consider monthly per capita expenditure (inclusive of
expenditure on education, health etc.) but also basic requirements for leading
healthy life with optimum productivity and the deprivation from various
facilities and services should also be factored in.

Highway-

The National highways in Madhya Pradesh are in extremely poor condition. NHAI
has thoroughly neglected the
maintenance of national highways for the last few years. State urges the
Ministry of Road Transport to ask NHAI to maintain these national highways
Properly. State can take up the programme for rehabilitation and reconstruction of
these national highways in case of de-notification takes place. Longest, smallest,
total length... data included.

MP Irrigation and Power-


basic overview of MP irrigation:-

The 12th Five Year plan of Govt. of M.P. Water Resources Department has been
formulated as per directives of the Planning Commission. Emphasis has been
laid on completion of ongoing Major, Medium and Minor Irrigation projects &
making much more effective use of irrigation facilities, both from existing and
newly created schemes to restore and improve old irrigation works and create
additional employment opportunities for rural masses.Percentage of irrigation to
net sown area would be 76.80%. Assuming 40 percent irrigation by private sources
and 60 percent by Government sources.

NARMADA VALLEY DEVELOPMENT:-


The Narmada Basin Cover 27% area of the present state of M.P. The
development of Narmada Basin is the most ambitious segment of the state's
Plan in the irrigation and power sector. In July 1985 the State Govt. constituted
the Narmada Valley Development Authority (NVDA) for implementing major
irrigation & power projects in the Narmada Valley. Narmada Valley Development
Authority has prepared a 'Reverse Calendar' and also embarked on preparation of
Detailed Project Reports (DPRs) of all the 16 remaining major projects along with
seeking necessary clearances. To finance and expedite the construction of medium
and minor projects, the NVDA has also incorporated, "Narmada Basin Projects
Company Ltd."

 list of new projects:-


Omkareshwar (OSP) and Maheshwar located between Indira Sagar Project (ISP)
and Sardar Sarovar Project (SSP) are also linked will the construction of Sardar
Sarovar dam due to their water spreads and the regulated release from Indira Sagar.
Bargi project- irrigation facilities to the areas in Jabalpur and Narsinghpur district

power projects under under 12th FYP:- ( names and locations)

following new Thermal Power Projects are proposed to be taken up in the 12th
Plan period:
(1) Dada Dhuniwale Thermal Power Project, District Khandwa
(2) Shri Singaji Thermal Power Project (Phase-II), Distt. Khandwa
(3) Bansagar Thermal Power Project, Tikuratola District Shahdol
(4) Amarkantak TPS Extension Unit, Chachai, District Anooppur
(5) Sarni Super Critical Thermal Extn. Unit, District Betul