You are on page 1of 58
INDIAN INSTITUTE OF TECHNOLOGY BOMBAY Department of Civil Engineering Powai, Mumbai - 400 076 (India) ea Phone: (+91-22) - 2676 7346, 2572 2545 Dr. RS. Jangid Fax: (+91-22) - 2572 3480, 2576 7302 Email: sjangid@ciiitb.2c in Ref. No.: DRD/CE/RSJ-10/12-13 April 19, 2013 Més Infotel Broadband Services Ltd Reliance Corporate Park, 5, TTC Industrial Area, Thane-Belapur Road, Ghansoli, Navi Mumbai - 400 701. Subject:- Evaluation of Structural Design of 25m Height pipe pole with cage platform telecom tower. Dear Sir, This has reference to your letter dated 20-05-2012 on the above subject. I have gone through the structural design for the 25m Height pipe pole with cage platform for 47m/s wind speed. The structural design of the tower are found to be in order and made in accordance with relevant Indian and International Standards by duly considering the wind forces. The associated design and drawings of the Tower are signed by me which may be accepted for commencement of erection. Please feel free to contact me if any clarification is required Yours sincerely, tevansiel (RS. Jangid) Dr. R.S. JANGID Professor Department ef Civil Engineering LUT, Bombay, Powai, Mumbai-76 RELIANCE PORTS AND TERMINALS LT = | ; ee a FR-2R0090 CALCULATION COVER SHEET ~_[PreiectNa= 0070" Caicataton No-——— = 40070-40-DGC-PR-EC-046 sian of 25 m Heigh PIPE POLE with cage platiorm”[Departnent Se Project- 46 OS ~ Type of Calculation ~ bs {for wind speed -47 mis Calculation Status Designation fe Preliminary | Confirmed [Ci Superseded [0 Vowea ie [Standard Engineering Software Software Name Software a Version/ Release 1 Program | | Type [J Network Program STADD PRO vai I Excel 2010 = IZ) Locally Developed wend shells Dr. R. S. JANGID eeaat . Civil Engineering iP bomeeye Powai, Mumbai-76 Proprietary 10 Reliance Ports and Ter rina iid Neither whole nor part ofthis document may be reprodacet disclose, «without prior permision ofthe copyright eer A ight ae reserved (Fornas Na FRERIOH) = = Brat Pr Ca [Aronis (71. —asst es FOR DESH oT Fiat ON spl 22.03.53 | 0 “ISSUED FOR DESI 4 Ht DN} sec [__oate [Re] eason for Revision bags | Pronaedoy [Checked oy es poate sD yee segment a RELIANCE PORTS AND TERMINALS LTD. FRZR.0030 Project - 4G OSP Project No. - 10070 ee 110070-40-DGC-PR-EC-046 ees acai Design o 25 m Heigh PIPE POLE with cage |. iment SA CONTENTS Page No, 1 Introduction 3 2 Reference Codes / Documents : 3 Dead Load and Live Load Calculation 6 4 Wind Load calculation 8 5 25m Pole design -staad out put 14 6 Anchor Bolt Design 27 7 Base plate Design -PV Elite output 30 8 Flange plate Design 36 9 Annexure - Drawings 43 ‘A, 10070-C63-XX00X-XXXX-ENB-0000-071 44 Tubular pole 25m High with Cage Platform GA& DETAILS 8 -CB3-XX-KKKX-XXX-ENB-0000-072 45, Tubular pole with Cage Platform SUPPORTING ARRNGEMENT FOR IME, DOOR ; GA & DETAILS ©, 10070-C53-X%-¥%XX¥000%-FNB-0000-059 a6 Tubular pole with Cage Platform & Antenna mounting arrangement GAB DETAILS roresd Dr. R. S. JANGID aciment oF ineering 1 of Civil Engineeri iF Bombay, Powsi, Mumbai-76 oe lima eo REO whens -3 RELIANCE PORTS AND TERMINALS LTD. FR-ZR-0030 Q Project 46 osP. Project No, - 10070 [Calculation No-~ 10070-40-DGC-PR-EC-046 Type of Calculation - Design of 25 m Heigh PIPE POLE with cage platform for wind speed -47 mis fowatnen-sa Introduction : Rellance io Infocomm Limited is setting up Broadband Wireless Access (BWA) Services Outside plant (OSP) works in india. As a part of this project, Monopoles of various heights shall be installed throughout the country. Monopoles can be olygonal masts or tubular poles constructed of pipe sections, ‘This design report covers the structural design calculation of 25 m heigh Poles manufactured from pipe sections conforming to IS 3589. Poles are designed to support 3 types of equipments IME, OME and CPME as per {he document GR Rancore/WG11/PE/12 and as per the following design parameters DESIGN PARAMETERS 1 Total Height of Structure - 25m 2 Height of pole - 23m 3 Height of platform- 2m 4 Basic design wind speed - 47m/sec 5 Grade of structural steel for Pole -Fe410 § Grade of structural steel for Baseplate and Flange plate -E3S0BR(Fe490) 7 Grade of foundation bolt - B7 as per ASTM A 193 M 8 Cross section of Pole - circular 8 Appurtenances of GBM - ) Upper platform - at 23m height 1m dia circular platform shall be provided at 2m below top. Cage platform with Antenna mounting pipes / clamps shall be provided from 23m to 25m level and antenna shall be mounted on it. LTE Antenna - 3 nos Remote Radio Head - 3 nos b) Wifi Antenna - 3nos, at 12m level ©) LEO Lights - 4 nos. at 15 m level 4) Surveillance camera - 3nos, at 10m level €) IME equipments placed inside pole on the IME supports mecca hse sen emp bia Dr.R.S.JANGID . Professor Department of Civil Engineering LLT. Bombay, Powai, Mumbai-76 a RELIANCE PORTS AND TERMINALS LTD. FR-ZR-0030 (Calculation No 110070-40-DGC-PR-EC-046 Project - 4G OSP Project No, - 10070 [Type of Calculation - Design of 26 m Heigh PIPE POLE with cage platform for wind speed -47 mis Department - SA 8 Method of Design - Limit state design as per ANSY/TIA-222-6 Staad Pro is used for the analysis and design of Pole. a) Wind pressure calculation - As per ANSI/TIA-222-6 b) Load combination -As per CL. 2.3 of ANSI/TIA-222-G €) Safety factor for loads - As per Cl. 2.3.2 of ANSI/TIA-222-6 Base plate design is done using the software PV Elite 9 Deflection Limit Tip deflection of the pole is checked both at design wind speed as well as at serviceability wind speed, Serviceability wind speed is considered as 27 m/sec (as per CL. 2.8.3 ANSI/TIA-222-6) As per T1A-2: ity wind is as below. 1. The rotation shall be limited to 4 degree about the vertical axis or horizotanl axis of the structure 2. Horizontal displacement of 3% of the height of structure-e, 750mm Wenn Dr. R. S. JANGID Professor Department of Civil Engineering LLT. Bombay, Powai, Mumbai-76 Q RELIANCE PORTS AND TERMINALS LTD. FR-ZR.0030 Iproi Calculation No. = [Prect-ac ose Projet o.-10070 [aoa coon 1¥Pe of Calculation - Design of 25 m Heigh PIPE POLE with cage platform for wind speed -47 mis Department - SA Reference Codes / Documents : 1 RancoreWGt/PEN2 Generic Requirement For Ground Based Mast (Revision 1.3 ) 2 18: 875 (Part 1) Code of Practice for design toads (other than earthquake) for buildings and structures. Dead Loads ~ Unit weights of building materials and stored materials, 3 18:875 (Pan 2) Code of Practice for design loads (ther than earthquake) for buildings and structures, Imposed Loads. 4 ANSTIA-222-G-2-2008 Structural Standard for antenna Supporting Structures and Antennas, (For Wind Loads ) 5 1s: 1893 Criteria for Earthquake Resistant Design of Structures (Parts 1&4) Part 1 - General Provisions and Buildings Part 4- Industrial Structures including StackeLike Structures 6 — 1$.800:2007 General construction in steel ~ Code of Practice 7 Technical Manual 1 Design of Monopole Bases by Daniel Hon. PLE 8 ASCEISEI 48.05 Design of steel Transmission Pole Structures 9 1s3689 Stee! Pipes for Water and Sewage ( 168.3mm to 2540mm Outside diameter) Specification waning Dr. R. S. JANGID Profess: © De t of Civil Engineering. LIT. Bombay, Pewai, Mumbs Peek Rte Nt ent - —_ toon [Calcutation No. ~ Project - 46 osP ProectNe.= 19070 lho070-40-0GC-PR-EC 046 "ype of Calculation - Design of 25 m Heigh PIPE POLE with cage [piattorm for wind speed -47 mis 0 | -retance Forts ano temunals cro = Department - Sa Dead Load and Live Load Calculation Dead load on Pole includes weight of IME, OME and CPME. {oad due to these equipment areas per the GR Rancore/WG11/PE/12. Weight of ladder, platform, antenna mounting arrangement ete. has been considered. Live loads are taken as per GR Rancore/Wa1/PE/12, Alive load of 125 ke/sq. m has been considered on platform Dead load for ll appurtenances and Live Load are calculated manually and applied at respective locations of pole Q RELIANCE PORTS AND TERMINALS LTD. FRZR.0030 [Gatcutation No. Proje 0070-40-0GC-PR-EC-048 4G 08 Pronto toe ype a Catcation- Design af 25 m igh PIPE POLE wit cage platform for wind speed -47 mis [Department- SA 1 Top Platform at 2m below pole top Size 1000 mm dia Self weight of platform = 200 ke with Antenna mount/ clamps LTE Antenna -3 nos = 3x26 : 78 kg RH 3n0s = 3x17 kg i stke Total : 329 ke 2 Wifi Antenna 3nos Weight : 3x26 : 78 kg 3 LED Light (4 Nos.)-at height 15 m Weight a 4x15 : 60 kg 4 Survellience Camera (3 Nos.]- at height 10m Weight : as = 15 kg 5 IME Weight = 1500 kg 6 Ladder 48.3x3.2x3.6kg/mpipe = 70.08 kg rung 30.78 kg Bracket = 9.891 kg Clamp 13,188 kg Total weight of ladder 123.92 kg Weight = 6.20 kg/m 7 kg/m soy wating Dr.R.S. JANGID Professor Department of Civil Engineering 1.L.T. Bombay, Powai, Mumbai-76 Q RELIANCE PORTS AND TERMINALS LTD. FR-2R-0030 [Caiculation No, - 10079} \40-06C-PR-EC-046 Project - 4G osP Project No. - 10070 [Type of Calculation - Design of 25 mr Heigh PIPE POLE with cage [plattorm for wind speed 47 mis Department - SA Wind Load Calculation Wind pressure and force coefficient of mast and appurtenances are calculated 28 per ANSITIA.222-6, Basic Wind speed + 47 mis Topographic Category Al Structure Class - 0 Exposure Category - oe Guest Factor Prt paensiel Dr.R. S. JANGID Professor . tof Civil Engineering, LIT. Bombay, Pewai, Mumbai-’ Q RELIANCE PORTS AND TERMINALS LTD. FR2R-0030 Project - 4G. OSP Project No. - 10070 [Calculation No. |40.0GC-PR-EC-046 so070] platform for wind speed -47 mis Basic Wind Speed Height of Mast ype of Calculation - Design of 25 m Heigh PIPE POLE with cage a7 23 Department - SA m/s Wind pressure are calculated at different heights from Ground level as given below | Design wind force on structure Fs a For Exposure Category For Topographic Category ans Dr. R.S. JANGID Professor Department ef Civil Engineering LUT. Bombay, Powai, Mumb: 6 10 20 25 o (FST) 4, * Gy * (EPAly 0.613 * K* Ky *Kgt V1 Kinin ke k c 274 95 os, 1.00 2.01*(2/ 2% 1.001 1.88 naa 0.000 (Refer CL. 2.6.9.1) Refer CL. 2.6.5.1 m Refer Table 2-4 Refer Table 2-4 Refer Table 2-4 Refer Table 2-4 ye(2vey Refer CL.2.6.5.2 {at 10 m height) {at 20 height) (ot 25 mheight) Ku 1 “Refer Cl. 2.6.6.4 Refer Table 2-2 RELIANCE PORTS AND TERMINALS LTD. FR-ZR.00%0 — 7 [Calculation No. 10079 Project. 4c ose ProectNo.- 10070 Ne ae Type of Calculation - Design of 25 m Heigh PIPE POLE wih cage ome | platioom for wind speed -47 mis lescaettiae For Structure Class id W Refer Table 2-1 \ 1 Refer Table 2-3 = 1.288 KN/m* (at 20 m height) Qe = 1.480 KN/m? (at 20.m height} 4 = 1.562 KN/m? (at 25 m height) Qe = 0.000 KN/m? For Pole "Gy =m a Refer CL. 2.6.7.3 Effective Projected Area(EPAJs My Ap ‘orce coefficient Ap = Projected area of mast © = (+ Ket Ke o.5}*veD Refer Table 2-7 Gi = ((1x1x1.001)90.5) x 47 x(0.762) = 35.80 Gh = (x1 1.158)40.5) x47 x (0.61) 30.86 Ges (12x 2.214)40.5}x 47% (0.3239) = 16.77 0.762 Elevation Wane . 8. JANGID P nae artment of Civil Engineering ne ‘Bombay, Powai, Mumbsi-76 coa7 G Ra for bottom section Cf for bottom section Ra for middle section CF for middle section Ra for top section CF for top section Supercritical flow 5 06 ladder projection - 75mm 0.098 <0. 06 0.42 >02 oat 2 0.23 02 : 12 ~lo- -ue a RELIANCE PORTS AND TERMINALS LTD. FR2R-0030 Project - 4G OSP Project No. - 10070 [Calculation No. 140-DGC-PR-EC-048 10070] [Type of Calculation - Design of 25 m Heigh PIPE POLE with cage Jolatform for wind speed -47 mis lDepartment- SA Il Design wind force on Appurtenances A TOP PLATFORM EL (+) 23M (Fa) Platform is considered as 1m dia circular at 2m below top of structure, Ring members > 60X40X2.9 ( 2NOS}, 48.3 X3.2 (1NO.) 60.3X 3.6 (1NO.) Effective area calculation as per CL.2.6.9.2.5 TIA 222-6 projected area of rings a drag factor for round member Multiplying factor for round member = Projected area of vertical pipe a drag factor for round member : ‘Multiplying factor for round member Projected area of supporting plate drag factor for fat member “Muiplying factor for supporting = member Effective projected area of platform == & clamps to support antenna Wind pressure at 25m 2 Wind force on Platform & antenna = ‘mount B NODE B ANTENNA AT EL (+) 25M Size of enode 8 antenna’ a Aspect ratio _ Ay G 0.247 m2 42 1.75 0.324 m2 12 175 0.072 m2 2 os 27 m2 1.562 KN/m? 1.98 KN peta re 1aym 123 (Tae20) . ; teens Dr. R. S. JANGID Professor Department of Civil Engineering LIT. Bombay, Powai, Mumbai-46 -105 Q RELIANCE PORTS AND TERMINALS LTD. FR-2R.0090 si Calculation No 10079 Project 46 o5P ete eee Type of Calculation - Design of 25 m Haigh PIBE POLE with cage 7 [pltiorm for wind speed 47 mis neces! PA = Ae EPA, KEA = 1.44 m? Wind pressure at 5m = 1.562 KN/m? Wind force on antenna = 225 kN Total wind load due to platform and antenna is assumed to act at the centre of the platform ie, at 1m from pole top, So, shear at top of pole = 4.23 KN Moment due to wind load . 4.23 x1 KN 4.23 KNm CC WIELANTENNA AT EL (4) 12M Quantity = 3 nos Size : 312 x 228 x 163 (flat shaped) Aspect ratio . 14525 As 0.42 mm" cq 1.20 ( Table 2-8) k, . 1 EPA GAs ea, K, EPA - 0.50 m? Wind pressure at 12m, . 1,328 KN/m? Wind force on antenna = 0.668 KN D CAMERA AT Et (+) 20 Quantity . 3 nos Size = 243x287 ( Round shaped) Wind area = 0.07 m? c . 11.43 8.7 Force coefficient . 05 (Table 2-8) Wind pressure at 10m = 1.288 KN/m?, ! Number of camera exposed to wind 20 Wind force on camera 0.090 kN wating Dr. R.S. JANGID eee ent of Civil Engineerit ne Bombay, Powai, Mumbai-76 ~\3- Q RELIANCE PORTS AND TERMINALS LTD. FR-2R0080 JProject - 4G OSP JProject No. - 10070 [Calculation No. 10079] |40-06C-PREC-046 Jelatform for wind speed -47 mis [Type of Calculation - Design of 25 m Heigh PIPE POLE with cage JDepartment- SA E LEDLIGHT AT EL («) 154 Quantity Size Aspect ratio Wind area Force coefficient \Wind pressure at 15m Number of EO Light exposed to wind Wind force on LED Light F Lappe 4 nos 310x S10X54 16<25 0.16 m? 1.2 (Table 2-8) 1.389 KN/m? 30 0.79 KN {flat shaped) Ladder starts at 3m level to top of mast for 20m length Exposed area for bracket Exposed area for spring clamp Exposed area for ral Total Exposed area of ladder / m Force coefficient for flat members Laansid Dr. R.S. JANGID Deperinet of il Engine epartment of Civil Engineeris LIT Bombay, Powsi, Mumbai-76 {60 mm x 50 mm at every 1.5m 100 mm x 50 mm at every 1.5. m 660 mm x 3000 mm (0.06 «0.05 + 0.1 x 0.05) x2 + 0.06 x3 3 (0.065 m2 fon 1.2 (Table 2-8} Qa RELIANCE PORTS AND TERMINALS LTD. FR-ZR.0030 Project - 46. O8P Project No. - 10070 [Calculation No. - 10070-40-DGC-PR-EC-046 Type of Calculation - Design of 2: ’5 m Heigh PIPE POLE wih cage platform for wind speed -47 mis Department - SA POLE DESIGN STAAD Output wxensied Dr. R. S. JANGID Professor Department of Civil Engineering LLT. Bombay, Powai, Mumbai-76 Tye Ghat Aa gareenag “Hie Peoria rae -15- Wednesday, April 17, 2013, 12:18 mp Pace No. 1 . STAAD.Pro Bi SELEctseries2 . . Version 20.07.07.32 * + Proprietary Progran of . . Bentley Systane, Ino * + Dates APR 17, 2013 . * Times 12:20: 6 . *__usex 10; eprem, 1. staap space INPUT FILE: 25m-PP=47-153589-CAGE PLATEORN. S20 2. STARE Jos INroRMATTON 3. ENGINEER DATE 21.03.13 4. JOB NAME 4G TONER 908 CLIENT RIT, 308 o 10070 08 REV 00 ENGINEER saan nar “28H FOLE WITH CAGE PLATFONS,z5 3589 WIND SPEED ~ s7H/sEC ENGINEER wawe is 20. CHECKER NAME DW AL, APPROVED NAME SEC 22, CHECKER DATE 21.03.13 43. APPROVED DATE 23.03.13 14, JOB REP 10070-a0-n6c-PR-£¢-046 15. END Jos rxsoRMATION 16. INeuP wrof 79 we 18. ONT METER Ke 29. oIN? coonDzNanEs 20. 3 0-10 40 -7.8 0; 806 0 10.0 15.2 0 21. MEMBER thcTDEWCES 22.143; 53 8; 78 10 23, + 24. oeeiwe mareRtAL stant 25. rsorRopie srgen, 26. & 2.055408 27. porsson 0.3 28. osNsITY 76.6195 29. ALPHA 2.28/008 30. pane 0,03, 32, END DEFINE MATERTAL a2. + 33, MEMBER PROSERTY TNDIAN 34. 1 TABLE St PIEE OD 0.762 1D 0.746 38. 5 TABLE St PIPE oD 0.61 1D 0.5964 36. 7 TABLE St PIPE 00 0.3238 TD 0.3127 a1 38. conszawns 39. MATERIAL Steet ALL 40. + prtemsid / Dr. R.S. JANGID Professor De of Civil Engineering, 2 LUT. Bombay, Pewai, Mumbai-7 {MO 124-91-26\4g-osp\Gumisesptine\Civit\eRovECT DOSS\PIEE BoLe\eSiGN fos HFC\CAGE PLATEORN DESicM\25m-P9-47-15 =1b- Nednesday, April 17, 2013, 12:18 By STRAD SPACE == PAGE NO. 2 a1, sueeoRrs 42. 4 ETXED 44, DEETNE 1693 LOAD 45. ZONE 0.24 RE 211.75 88 2 om 2 46. SELEWETGHT 1 47, MEMBER WEIGHT 48. *ANTENNA AND OTHER APPURTENANCES LOAD 49. *LTE ANTENA , RRH = 129 KG ( 26017) 3 50. 7 cow 1.29 7.1 51. ¢ HEFT ANTENNA AT EL + 12H ( 26 X 3 = 78 Koy 52. § con 0.78 5.2 53. * IME AT + 3.0% ( 1500 KG) 54. 1 CON 153 58. * SURVEILLENCE CAMERA AT EL £10.08 ( 5X 3 = 15KG) 56. 5 CON 0.15 3.2 ST. + LED LIGHT AT RL+25.06 | 25 x4 = 60 KG) 58. 5 CON 0.6 8.2 59. ¢ 60. * WEIGHT OF PLATEORY + ANTENNA HOUNTING CLAMPS - 200 KG 61. 7 con? 7.1 62. *DEAD LOAD OF LADDER 63. * WEIGHT OF LADDER 7KG/ 64. 1 ONE 0.07 3 6.8 65. 5 ONT 0.07 66. 7 uN 0.07 68. LOAD 1 LOADTYPE SEISMIC TITLE SEISMIC £OK NOTE : FOR SOPT STORY CHECKING WRITE “CHECK SOFT STORY" AT THE BNO OF LOADING UNDE DEFINE 1693 LOAD DEFINITION. 69. 1893 LoaD x 1 70. PERFOR ANALYSIS PROBLEM sTaATIstics NUNBER OF JOReTS/MEMBER ELEMENTS /SUPPORTS ask SOLVER USED 5 THE OU?-OF-CORE BASIC SOLVER ORIGINAL/FINAL BAND-WEDTH= 2/2/12 DOF TOTAL PRIMARY LOND CASES = 1, TOTAL DEGREES OF FREEDOM = 18 SIZE OF SFIPRUESS MATRIX 2 DOUBLE KILO-WoRDS REQRD/AVAIL, DISK SPACE = 12.0/ 0.0 MB wang Dr. R. S. JANGID diow Professor Department of Civil Engineering oo. LT, Bombay, Powai, Mumbai-76 ni \\20.126.31, 161 4g-osp\GsH\bisciptine\Civs1\PROJECT OOCS\PIPE POLE\DESIGN FOR IFC\CAGE PLATFORM DESIGN 25m-PP-47-15. “We Nednesday, April 17, 2013, 12:16 py STARD SPACE ~ PAGE NO, 3 joey RARHENG : AVATLABLE HARD DISK SPACE MAY NOT BE FuOUGH TO COMPLETE EXECUTION. IF YOUR AVATLABLE NARe DISK Hae ee nani ANALYSIS DRIVE 78 GREATER THAN GB THIS MeceneE MAY BE ERRONEOUS [TIME PERIOD FOR x 1893 LonDING = 9.85104 sec : [SMG PER 1993= 0.992, Loa ractoRs 1 000 . J PRctoR v PER 19930 0.10308 at.e3 . 71. cuanee 73. Loko 2 LoRDTYRE sprswic TITLE sersure poe 74. 1893 Lomo 2 1 75. PERFORM ANALYSTS {TIME PeRTOn For 2 2893 LoADINs = 0.95104 sec + 7 8A/G PER 1893- 0.981, Loa racron- 1-000 . J fRctORV pen is932 "9.1030 x ea. . 78. cHauce 78. LORD 3 DEAD LoaD 79. spuewercHr y <2 80. > 81. MEMBER LOAD 82. TANTENWA AND OTHER APPURTEMANCES LOAD 83. *OTB ANTENNA , RAH = 123 KG { 2611N) 4 9 84. 7 Con GY -1.25 7.4 G8. + WIET ANTENA AT EL + 124 ¢ 26 x 3 = 78 Ke) 86. MEMBER LoaD 87, $ cow Gy -0.78 5.2 88. * IME Ar + 3.0m | 1500 Ke) 89. 1 CON Gy -25 3 wcreinsiel Dr.R.S. JANGID Engin ng LT. Bombay, Powai, Mum: i-76 f W0-126-31-16\45-osp\can\piscipline\civij\pRoséct DOCS\PtPE eoLe\oesroN om TECICAGE PLATFORY DESIGN 25m-P2-47-15 —1g- Nodnesday, Aprii 17, 2013, 12:18 PH STAAD SPACE “page Wo. 4 90. * SURVEILLENCE CAMERA AT EL +10,0% ( § X 3 = 19KG) 91, 5 CON GY -0.15 3.2 92. * LED LIGHT AT ELV2S.0N ( 18 x4 = 60 KG) 93, 5 CON GY -0.6 8.2, oa. 95. * WEIGHT OF PLATFORE + ANTENKA MOUNTING CLAMPS - 200 KG 96. 7 CON GY -2 7.1 97. "DEAD LOAD OF LADDER 98. * HEIGHT OF LADDER TKG/M 99. MEMBER LOAD 100. 1 unr GY -0.07 3 6.8 201. $ unr GY -0.07 102. 7 UNI GY -0.07 fiaeeeceeass 104. LOAD 4 LIVE LoaD 105. MEMBER LOAD 4106. *70P PLATFORY LIVE LOAD 125 KG/N2 207. + 2.3 x 125 = 207.5 KG 108. 7 CON GY -2.9 7.1 109, sere 110. LOAD § LOADEYeE NoNE TETLE wIND_x 111, MEMBER LOAD 112. + FOR HIND SPEED - a7H/SEC 113. + MIND OW POLE. iM. + 1.1. 0.6 x 1.208 x 0.762 = 0.687 KM ans. + 1.2 X 0.682 1.288 x 0.62 ~ 0.553 KN/M 316. + 1.1 X 0,682 x 1.49 x 0.61 = 0.680 KN/M BT, #1. X 112 x 1.49 x 0.9239 = 0.637 KYM 1 Bie. * 1,3 X 1.2 x 1.528 x 0.3239 = 0.655 KN/M, 120. 1 UNI Gx “0.647 121. 5 UNI Gx -0.553 0 3.2 123. 7 war Gx 0.637 0 4.2 124. 7 unr Gx -0.655 4.2.7.2 125. + MIND ON ABPURTENANCES 126. *TOP PLATFORM + ANTENA LOAD AT EL4234 127, *9* PLATFORM ANTENNA MOUNTS LORD = 1.27 X 1.562 ~ 1.98 KX 128. 7 CON GX -1.98 7.2 128. **# ENODE B ANTENA LOAD = 1.44 x 1.562 = 2.24 KW 130. 7 CON GK -2.24 7.1 BL. *MOvENE OVE TO WENO OW PLATFORIE OR ANTENNA 132. 7 cHoM G2 4.23 7.2 134. + WIET AT EL + 128 TOTAL 3 Nos 135. + 0.503 x 1.328 = 0.669 KW 1 5 122. 5 UNI Gx -0.64 3.2 9 7 136. § CoN Gx 0.669 5.2 137. + SURVEILLENCE CAMERA AM EL $10.08 138. + 0.243 x 0.207 X 2X 1.288 x 0.5 = 0.09 KW 139. § CON Gx -0.09 3.2 140. * LED LIGHT an BL+25.0% LAL. + 0.31 X 0.51 X 3 x 1.380 1.2 = 0.79 KW 142. 5 CON Gx -0.79 8.2 143. SIND ON LADDER 144. + LADDER LORD UP TO 10K = 1.280 x 0.065 x 1.2 = 0.1 KN/H 145. + LADDER ZOAD UP TO 20M = 1.490 X 0.065 x 1.2 = 0.116 KW/M 146. + EADDER OAD UP TO 25M = 1.562 X 0.065 x 1.2 = 0.12 KN/M LeT. *HEMBER LORD wetensied Dr. R. 8. JANGID Department of Civil Engi . LT. Bombay, Pawan \\20.124.31.16\eg-o5p\oBmn\Discipline\Civil\PROJECT DOCS\PIPE POLE\DESIGN FOR IFC\CAGE PLATFORY DESIGN\25m- PP 47-15. Wednesday, April 17, 2023, STAAD space PAE WO. 5 148. 1 UNE Gx -0.1 3 6.8 149.5 ONT Gx -0/1 0 3.2 150. 5 unr ox -0.116 3.2 9 151. 7 UME Gx -0.116 014.2 152. 7 unr Gx 0,12 4,2 7.2 156. LoaD 6 winp_2 197, MEMBER LoxD 158. + FoR wiup seteD - a7H/sec 458, + wmNo on POLE 260. 1.1 x 0.6 x 1.288 x 0.762 = 0.647 N/E BOL. + 1.1 x 0.641 X 2.288 x 0.61 = 0.593 KN/M 162. + 1.1 X 0.641 x 1149 x 0.61 = 0.640 KUM 163. + 1.1 x 1.2 x 1.49 x 0.3238 = 0.637 KWL 264, + 2.1. X 1.2 x 11528 x 0.3239 ~ 0.655 KAM 266. 1 UNI Gz 0.667 167. 5 unr 62 0.553 0 3.2 168. § ONT Gz -0.64 3.29 169. 7 unr 2 0.637 6 4.2 170. 7 oMr G2 -0.655 4.29.2 271.» WIND OM ABPURTENANCES 372, STOP PLATEORM + ANTENNA LOAD AT ELA23M 273. s** BLATEORY ANTENNA MOUNTS LORD = 1.27 X 1,562 = 1.99 KN 174. 7 COW G2 -1.98 7.1 278. 14% ENODE B ANESHINA LOAD = 1.44 x 1.562 = 2.24 ww 16. 7 con G2 -2.24 7.2 178. *MOWENT DUE TO WIND ON ELATEOR OR ANTENNA 179. 7 cHow ox -4.23 7.1 381, STEX AT EL + 126 TORAL 3- wos 462. + 0.503 x 1.328 = 0.669 KN 183. $ con 62 -0.668 5.2 264. + SURVETLIRNCE cANERA AT EL +10.0% 185. + 0.243 x 0.287 K 2X 1.288 X 0.5 = 0.09 KW 186. 5 con Gz -0.09 3.2 287, * LED Lieur ar B1+35.0m 268. * 0.31 X 0.81 x 3 x 1.369 41.2 = 0,79 KM 188. 5 CON Gz -6.79 6.2 190. “WIND ow LADDER 292. * TADDER LOAD UP TO 1OW = 1.288 0.065 X 1.2 = 0.2 KN/M 482, * LADDER LOAD UP TO 20M = 1.490 x 0.065 X 1.2 = O16 aN/M 383. * DADDER LOAD UP TO 25 = 1.562 x 0.065 K 1.2 = BL? KN 194. *NENBER LoaD 195. 1 UNI Gz -0.13 6.8 196. 5 usr Gz 0.1 0 3.2 197. 5 ONT G2 -0.116 3.2 9 198. 7 UNI Gz 0.125 04.2 199. 7 UME Gz -0.12 4.2 7.2 201. ** LINTT STATE LOAD COMBINATION AS PER ANSI/TIA.22s-¢ 202. voa cous 202 oust, 203. 31.2 41.2 204. 10RD cows 202 OL Let we 205. 31.241.25 1.6 206. LOAD coMB 202 oLvtuew2 207. 3:1.241.261.6 208. LoAD coup 208 pLwx wertanstel Dr. R. S. JANGID Professor Department of Civil Engineering LT. Bombay, Powai, Mumbai-76 -19- 12:18 py \\10-124-91.16\4o-osp\eaM\Biscipline\Civis\ PROJECT DOCS\PIRE POLE \DESiGN FOR TEC\ChGE puarrom DESIGH\25n-PP-$7-15 20 - hednesday, April 17, 2013, 12:18 BH STAAD SPACE PAGE NO. 6 209. 30.95 1.6 210. LOAD coup 205 Lowe 211. 30.9 6 1.6 212, + FOR DEFLECTION CHECK - FOR WIND - 47 M/S 213. LoAp coun 206 oLenx aia 31.0520 215. LOAD coum 207 oLewz 216. 3.1.0 61.0 217, * FOR DEFLECTION CHECK ~ £OR WIND - 27 H/S 218. LOXD ConB 208 DLIWX 219. 3.1.05 0.33 220. LOND cons 209 oLew2 221. 32.0.6 0.33 222. + 223. LonD comm 210 oL+nLsEOK 224, 3:1.043.011.0 225, LOND COMB 221 DL+LL+E2 226. 31.0 42.0 2.1.0 pe ora 228. EREOR, ANALYSIS: 229, orb LIST 201 70 211 230, teneserecers 231, PARAMETER 1 232. CODE LRED 233, eu 420000 ALL 234. vip 235000 ALL 235. + 236. RATIO 1 ALL 237, CHECK CODE ALL wseinsid Dr.R.S. JANGID a Prefessor Departaent of Civil Engineering TT. Bombay, Powai, Mumbai-76 \10.124,31-16\4g-osp\GBM (Discipline \Civil \PROJECT DOCS\PIPE POLE\DESIGN FOR TEC\CAGE PLATFORM DESIGM\25n-PP-47-15 es Nednesday, aprit 17, 2013, 12:18 py STAAD SPACE ~- pace Wo. 7 STAAD.Pr0 CODE CHECKING ~ (LRED 3RD EDITION) v1.0 All UNITS ARE - 1 METE (UNLESS ONKERNTSE NOTED) wmaer ante RESUL/ CRITICAL coND/ —RATTO/—_LoADING/ st PIPE (auoIN sectroxs) PASS LRD-HI-1B-c 0.545 202 53.67 ¢ 0.00 510.69 0.00 5 sp PIPE (INDIAN secrroHs} PASS LRPD-H1-15-¢ 0.668 202 2340 c 0.00 7290.86 0.00 7 sr ere (aNpIaW sections) PASS URED-HI-1B-c 0.728 202 1s 0.00 86.54 0.00 seeterseaesers phD OF TABULATED RESULT OF pestaN t1tesserseveee 238. “STEEL TAKE OFF LIST ALL 238. PRINT SUPPORT REACTION of Civil Engineering LT. Bombay, Powai, Mumbai-76 E124 31-16\4g-osp\ cath Discip! sne\Civit\PROGECE BOCS\PIFE POLE\DESIGH FO IFC\CAGE PLARFoR! DESIG 25m: dP 47-18 -2L- jednesday, April 17, 2013, 12:18 2M StAAD SPACE -- PAGE Ho, 8 SUPPORT REACTIONS -UNIT 101 MERE STRUCTURE TYPE = SPACE JOINT LORD FORCE-X FORCE-¥ FORCE-2 MOM MOM-Y MOM 4 201 0,00 53.67 0.009.000.0000 202 36.02 53.67 0.00.» 0.00 «0.00 ~510.69, 2030.00 53.67 36-02 $0.69 0.00 -—0.00 206 ©3602-3765 0-00, « 0,000.00 ~S10.69, 205 0.00 37.65 36.02 Sid.68 0-00 0.00 206 22.51 4283 0.00« 0.00.00 319.18. 2070.00 «44.83 -22,51 18.18 0.00 0.00 2087.43 41.83 0.00 0.00 0.00 -108.33, 209° © 0.004.839 -7:43,108.33 0.00 0.00, 210) wee tare eye fools lotoo ss rofoo tet avast 20004473432 -7aa1 0000.00, sartebvovouees END OF LATEST ANRIYSIS ESULT ttterrerecense 240, FINISH ssessoosese BND OF THE STAAD.rO RUN teteeereons eeee pares ABR 17,2013 TINE 1210: 9 98 vortengiel Dr. R.S. JANGID Department of Civil Engin: vi 7 LLT. Bombay, Powai, Mamba 120.124. 31. 16\4g-osp\GBMDieeiptine\Cius1\PROJECT DOCS\PIPE POLE\DESIGN FOR IFC\CAGE PLATFORM OESIGN\ 25n-PP-47-15 —_ vornsid f Dr. R.S. JANGID Profes: am 10070 oo io .. a [Pas TOWER dau Rae WIN CASE FORS al aise 4G TOWER Ta 007040060 PREG ONG HM 9424.03.13. ON RIL 7 Fie 25m-PP-47-1S3589-CAGI Ose! 17-Apr-2013 12:11 Node Displacements ( scavice winn. 24 om (sec) Node | TE XY] 2 Recut] 8 gan _| gems 1 tom _| "mm | on | on | con 3 [pose [Feat —-aoso] aoe] — Fear] — sop] ast zav0Lwe | 0000] oso] rset] yar] ane} poet os <—[eeetvx | —~o000 | eave] —aono | —a00a] vos} past Soe zoeoLz | ~ 9000 | ~cono | —a00 | 0000] — sano] anno} sees | 8 [oncotswox | ~as.5,| —aaae | cane | —asose | 000] — pest So onoiewz |" 0.000| —aos6 | ~xa056 | —ex06s | —no0e| ooo] pore [36 [aos wx | 00.800] a8} — aan | Tas sne | ose] set zospiewz [ooo] —av2a]} Teoasa | ~ionase | 000s] — poset poe f nh. t e ene n os bets Allowable displacement = 3/. of Tm = 6€Fomm Flot mm ok Department nf 7! LLT. Bomb ting sumpai-76 STAAD Pro Val (SELECTaenes 2) 20007 07.32 CHOWAL yore pi fen. ee Pee csamag nh aba “0070 eta ane oe [6 ToweR- dau Pow WHTNOAGE PUMP ORIS iota a6 TOWER 7 0740-D60-PREC O45 lm Santonio akan sm Fea ISSS-CMGI MH Tha 2019 TOT Beam End Forces ‘7 convertan sa ston of oon beam Aaa a TT i a cw _| oa [aay | anny | anim | any ETE TD 20s;btstLwe| 63673 | 0.000 | 36.017] 0.000} ~s10.600 | 0.000 i 3_|acz0l« tts v 25.475 | 28370! — 0.000] 0000] — 000 | "pen see 203 DLeiLwe {23.475 | 0.000 38.370| 0.000} “Za086¢] coos S| 3 [acabus itev 23475] 28.370 0.0001 o000] ones] Daraee [_ 20901LLwi | "23.4751 000 | 28370] 0.000] ~2o0.86¢] 000 §_facadle tte] 11750 [18.582 — 0.000 0000] ooo | ae sae 2os-busitew.| “11.750 [ 9.000] 15.539 | 0.000 | a6 sie 0.000 7 _{¢ [avapirtisv[ i760] tsa] 0.000] —o.000| — aoe} asp 203DL«itewi | 11-750] 0.000] i592] 0.000 | —ae-ssa oor 40_{202.6t+ tus ¥ "0.000 | “0.000 6.000] 0.008] — o00| o-oo} 2ospteitew | 0.000 | 0.000 | —-6.060 | —~o.000| 0.000 oom wrersid Dr.R.S. JANGID rorcinl Engineering Ci ne Bombay, Powsi, Mumbai-76 a iba TET ‘STAD Pro Vei SELECTaeniss ) 2007 732 Panna CREB ey aestter Panprand Nob Ne tsaenin es So alec owe vada PH 2TH 4G TOWER 10070 Pe"4G TOWER -25M Pole WITH GAGE PLATFORMS 36] a 40070-40-06C PREC-O46 on Paton Ri ‘26m PP-47-183569-CAGi] =" 7 Apr 2013 1a Node Displacements ( ¢u\\ wad _ Armee Node] ¥ Y [2 Reatant) ae Goo | omy | em | mm | coer | ca | day 3 [esntwx | ~zeast | ooso | ae60 | —arest] — 0005] —otart soe ee 207-OL Wz 0.000 | 0.050 | -22.851] 22.857 6.006 | 0.600 ‘0.000 | 4 [eosin | ~oa00 | — 0000} — aavo | —a0se] ooo] pest soe = 207-DL+WZ_ 0.000 0.000 0.000 0.000 0.000 0,000 0,000 | 5 feos pix | -i80 s01 | 0 095 | — eave | Taasar] nooo] set Soe [_ 207:D14WZ 0.000 0.098 | -130.501 | 130.507 0016 0.000 0.000, 206 Dlx | -305,76¢[ 0.129 ~ gana] aos rt] 000] sore aoe 207:DL+WZ 0.000 0.129 | -305.754 | 305754 0.029 0.000 | 0.000] LT. Bombay, Powai, Mumbai coer Dr. R.S. JANGID of Civil Engineering STAAD Pro Vai (SELECTGetie8 2 20.07.07 32 Femina ihre sea Sada ap = ane ante Tea 10070 4 0 ay Stee leanne EORPTL *='4G TOWER 26M Pole WITH CAGE PLATFORMS sal “SOW 4G TOWER "4 10070-40. 060 PR. ea Ra 2013 2 wexemsid Dr.R.S. JANGID riment of Civil Engineering f Civil En IE Bombe, Powel, Mambei-76 Fata VOTE STAR Pro Val SELECT 5 OTT mana CN AWENE Go Mate samen ancraeige.L1, SPAM cae eae TE creatine 6} -27- Q RELIANCE PORTS AND TERMINALS LTD. FR.ZR-0030 Project - 4G OSP. [Calcutation No - Project No, - 10070 10070-40-DGC-PR-EC-048 Pe of Calculation - Design of 25 m Heigh PIPE POLE with cage [platform for wind speed «47 mis Department - SA ANCHOR BOLT DESIGN woemsid Dr. B.S. JANGID Professor = of Civil Engineering LIT. Bembay, Powai, Mum -28- e RELIANCE PORTS AND TERMINALS LTD. | FRZR.0080 Project - 4G OSP. Project No. [Gsicutation No. ~ ones 10070-40-DGC-PR-EC-046, platform for wind speed -47 mis HType of Calculation - Design of 25 m Heigh PIPE POLE with cage Department - SA Design of Anchor bolt Pole Type Type of bolt Maximum bending moment (Mu) Maximum shear (H) Vertical load (Pu) Mast bottom (dm) PCD (0) Bolt dia (db) No. of bolts (N) Force per bolt (Fmax) Y¥ max=D/2 Distance of first row of bolts from C/L (1) Distance of 2nd row of bolts from C/L (y,=D/2*S1N 0) Distance of 3rd row of bolts from C/L (v= 0/2*SIN 28) 25m /47m/sec High tensile strength 8.8 GRADE 87- ASTM A 193, 511 KN, 37 KN “rom STAAD output Reaction Surnmary’ 54 KN 762 mm 940. mm 52 mm Pu/N +f Mu* ymax/t 90.00 degree 470 mm 332 mm 1 nos (n) 332 mm 11 nos (n,) 332 mm 1 ee wransid Dr. R. S. JANGID Departmen of Gn ‘of Civil Engineeris IT, Bombay, Powai, Mumbai ~29_ Q Project -4G sp. Project No. - 10070 RELIANCE PORTS AND TERMINALS LTD. FR-ZR0030 [Calculation No. - }10070-40-060-PR-EC-046 Type of Calculation - Design of 25 m Heigh PIPE POLE with cage platform for wind speed -47 mis eee Distance of th row of Boks rom C/V 95 in) - 332mm a («= 0/2*51N 30) oe I= Ey2= nyt2-+ nyt? + ee Na3"2 + nayy'2 + nBy5%2 Capacity of foundation bolt Tension capacity of bolt - 801 KN Shear Capacity of bolt . 417 «w Fax (Tension) : PUN amu tyman/t Max. Tension Per Bott : 520. KN< 801.23 kN Max. shear Per Bott > 9.25 KN< 416.63 kw ANCHOR BOLT ARRANGEMENT ANCHOR BOLT ARRANGEMENT reaamsd Dr. R. S. JANGID Professor . of Civil Engineering LLT. Bombay, Pewai, Mumbai-76 feat 2 soa BubseegtE HOS es usiqan Of viii twa sea cestt —30 Qe RELIANCE PORTS AND TERMINALS LTD FR-2R-0030 P (Calculation No.- oe }10070-40-DGC-PR-EC-046 Project -4G OSP. Type of Calculation - Design of 25 m Heigh PIPE POLE with cage platform for wind speed -47 mis Department - SA Square Base Plate ( PV Elite Output) Professor of Civil Engineering Re nena. Pewai, Mumbai-76 hig et? feo ncigeed ch VE sence OE eet ne By Elite 2012 Licensee: RELIANCE PETROLEUM LED (OAMNAGAR) FileNane ; 46 mast_d7m per sec Wind speed 250 apa Basaring Calculations Stop: 16 11:208 Apr 17,2013 ‘Skirt Data: Skit Outside diameter at Bae 800 762.0000 mm Skirt thickness sma 8.0000 mn Skirt Internal Corrosion ALlowence ca 0.0000 nm Skizt External Corrosion Allowance 0.0000, 1m Skire Material Shae Basering Input: Type of Geometry: Simple Basering With Gussets ‘Thickness of Bazering en 30.0000 om Design Temperature of the Basering 37.78 © Bosering tat) sae Basering Operating All. stress sasore, 217.80 wea Basering Yield Stress 330.00 Hea Inside Diameter of pasering or 162.0000 mn Ourside Diamocer of Basering ow 3181.00 om Nominai OLaneter of Rotts op 52.0000 mm Bolt corrosion Allowance Bea 2.0000 =m Root Area of @ Single soit area 17.4200. en? Bolt Material sA-192 87 Bolt Operating Allowable stress sa 172,38 wea Munber of Bolts aw 4 Diameter of holt cireie ve 340.0000 a Thickness of Cusset Plates roa 16.0000 wa With of Gussets at top Plate wor 25.0000 ree Width of Gussets at Base Plate euor 117.0000 am Gusset Plate Elastic Modulus e 199955.0 pa Gusset Plate viola Stress sv 330.0 ba Height of gussets Ae 200.0000 mm Distance betueen Gussees Re 380.0000 mn navenstd Dr.R.S.JANGID ~ ‘Civil Engineering ” of Civ UP bombay, Powe Mambai4 PV Elite 2012 Licensee: RELIANCE PETROLEUM LID (JAMNAGAR) 2 PileNane : 4 mast_47m per sec Wind speed 250 apa —~—-—-~~ Basering Calculations + ‘Stop: 16. 12:208 Apr 17,2013 Dist. from Bolt Center to Gusset (Ra/21 C6 90.0000 ree Number of Gussets per bolt Ne 2 External Corrosion Allowance ow 0.0000 mw Dead Weight of Vessel ow 40.9 operating Weieht of Vessel ow 40.9 kw Earthquake Moment on Basering SoKoH 190336.1 wm ind Moment on Basering wmv 323613.3 om Vortex shedding Monent on Basering Vorsom 672.3 mm Peccent Bolt Prelosd pol 100.0 Use AISC AS.2 Increase in Fe and Bolt. stress No Use Allowable Weld Stress per AISC 32.5 ves Factor for Inctease of Allowables Fact 1.0000 Results for Brownell and Young Basering Analysis: Analyze Option ‘Note: This analysis is based on Neutral As shit method for Steel on Concrete (or 9 material with sgnificanty different Yeuns's modulus). Governing Bolt Load Condition, Wind + dead Weight Condition Ares AvaLlable in one Bolt poss 17.4200 ow area Avaflable im all the Bolts Abs * aN 69.6800, ent reiat_k coe fe re 2 0.1 a.212 1.017 2.792 Os 0.7 aS TED 40.1% aise tae 2.73 ose 0.7 aad kD © 0,203 0.199 1.227 2,654 0.45 0.776 18.8 71347 f 0.196 0.197 1.206 2.669 0.460 0.775 19.7 HL lo 0.197 0.187 1,200 2.668 0.460 0.775 19.6 «TL 120.196 0,196 1,207 2.669 0.460 8.778 IS TL weaeevaiel Dr.R.S. J, San Department of Civi LLT. Bombay, Powel eee ' Pi Eiite 2012 Liconese: RELIANCE PEEROLEUM LED (gAMaURGAR) Filotlane : 46 mast_47m per sec Wind speed 250 eps Basering Calculations Step: 16 11:20a Apr 17,2012 ‘The Actual Stress ina Ingle Bolt (Spot) Tot Ryo ms Decry ~ 2 * 419.670 2.360 + 940.000 + 2.669) = 161.013 Hea, should be Jess than 172.4 ‘Thickness ofthe Band ofBolting Steel (71) 7 RYT Bote Area / (3.4159 + Dey = 4 * 17.420/¢ 3.14158 + 840.000 = 2.360 we (Check the Bearing Stress in the Concrete (max) = feCd bea te) (2k) ~ 2.275((2*0.196+840.0004209,500) /(2+0.196+940,000)) 5.526 Pe, shosld be Less than €.3 Values for table 103, | = 209.500, b = 160.000 , yb = 1.163089 Moximm Moment per unt width [Mmax) = MaxC Ye, My} ~ MaR( 18.915 , 29.256) = 29.256 ew Rese! Thickness of Basering, Brownell & Young Method (1) C6 unex / fatew 9% + ca = (6 * 29.256/217.8 3% + 0.000 28,381 wm Required Thickness of Gusset in Compression, per AISC E2- 4. Allowed Compression at Given Thickness taster Ke Pee 18.4.3 tase esctr Ge vee 5.1.34 vos.309 MA ockag ee, per 18.3.3.3 set.s2 we ets Ootting se, 3 cian tictnese wsi6 ae vetinsicl Dr.R.S.JANGID- Professor oat Department of Civil Engineering. LT. Bombay, Powai, Mumbai-76 —34~ PV Elite 2012 Licensee: RELIANCE PETROLEUM LTD (JAMAGAR) FileMane : 46 mast_47m per sec Wind speed 250 apa ~ Basering Calculations Step: 16. 11:20a Ape 17,2013 Required Gusst thickness, + CA 13.2859 mn 2. Aled Compression at Calculated Thickness: Factor Ki/e Par 1.8.1.3. 52.0886 Factor Ce Per 1.5.1.3.2 109.3639 ALL. Buckling str. per 2.9.1.3.3 159.72 wpa Act. BuckLing Str. at Calculated thickness 159.16 Pa ‘Summary of Basering Thickness Calculations Required Basering Thickness (tension! ea Actual Basering Thickness as entered by user 30.0000 am Required Gusset thickness, + Ck 13.2858, om Actual Gusset Thickness as entered by user 16.0000 =m Weld Size Calculations per Steel Plate Engineering Data - Vol.2 ‘Compute the Weld load atthe SkityBase Junction (W] = skirestress + ( skirtrniciness ~ ca) = 93.617 * ( 8.000 - 0.000) = 0.75 ia/nm Results for Computed Nisinum Basering Weld Sie (BWekS} W/ 100.3 * vleseeess ) + 2+ 0.707) = 0/¢ 0.34 399) 8 2+ 0,707) = 4.418 am Resuls fox Computed Minimum Gusset and Top Plate to Skirt Weld Size Vertical Pate Load (WY) = bolt Load / { caweh #.2+ (ig + tea) 300.3/4 0.000 + 2 * { 200,000 + 0.000 +3 0.752 bu/nee wares Dr. R. S. JANGID Department of Civ vil Enginceri 1.T. Bombay, Powai, Mumbai-76 Fy Elite 2012 Licensee: RELIANCE PETROLEUM LED (JAMNAGAR) FileName : 46 mast_d7m per sec Wind speed 250 wpe Basering Calculations Step: 16 11:208 apr 17,2013 Horizontal Pate Load [Wh ~ Bolt Load + © / ( cmuth + (ageteal + 0.6667 + jngerea)? ~ 300.3 + 89.000/¢0.000 > (200.000 1 + 0.6667 + (200.000 1) = 2.002 n/n Resultsnt Weld Load We) = Cae an = (0,758 + 200% Rests for Crmputed Sin Gusset and Top Plate to Skit Weld Size (i Me 7600.3 + uiesteess 1 +2 + 0,707) 7 1.25/60 0.3 + 399) © 2 + 9.207) = 7.381 am ‘Summary of Required Weld sizes: Required Basering to Skirt Double Fillet Weld sz 4.7628 on Required Gusset to Skirt oouble Fillet Weld Size 7.3012 mm PY Elltis a trademark of intergraph CADWorx & Analysis Solutions Inc. 2012 naemsid Dr. R. S. JANGID Professor Department of Civil Engineering LT. Bombay, Pewai, Mumbai-76 Led AM mnsodtet presse ped Ha Ma teemncentt Fe not nena see LES Q RELIANCE PORTS AND TERMINALS LTD. FRZR-0030 Project - 4G osp Project No. - 10070 [Calculation No. - 10070-40-DGC-PR-EC-046 Type of Calculation - Design of 25 platform for wind speed -47 mis m Heigh PIPE POLE with cage [Peeariment SA FLANGE PLATE DESIGN wating id Dr. R.S, JANGID Professor Department of Civil Engineering LT. Bombay, Powai, Mumbai-76 CONNECTION FLANGE -1 CONNECTION FORCES AT FLANGE CONNECTION -1 Moment Verical load Shear OD of top pipe BcD No. of bolt ‘Type of bolt ( as per IS 4000) Tension capacity of bolt Shear Capacity of bolt Tension per bolt Shear per bolt Interaction ratio waemneta Dr. R. S. JANGID Oren ere LAT tomas Powel, Mumba Bb a RELIANCE PORTS AND TERMINALS LTD FRZR-0030 oe [Calculation No. - Project - 4G osP Project No, - 10070 | eoalion NO. C-046 Hype of Calculation - Design of 25 m Heigh PIPE POLE with cage platform for wind speed -47 mis De mee! 291 KNm 29 KN 24 KN 610 mm. 685 mm. 16 M24- HSS 127 KN 73.2 KN 4M/N BCD -P/N 104 KN Fh/N 15 KN ae 104.39 + 1s 127 732 os2 + 084 <1 os Q RELIANCE PORTS AND TERMINALS LTD T I FR-ZR-0030 Project - 4G OsP platform for wind speed -47 mis Project No. - 10070 ype of Calculation - Design of 25 m Heigh PIPE POLE with cage [Calculation No - }10070-40-D6C-PR-EC-046 Department - Sa Design of plate OD of flange plate - 1 of flange plate : Area of flange plate - Z of flange plate a Spacing between bolts - Width of plate . Check for Compression P max 5 Bending moment = Permissible bending stress = Material factor . Thickness . Stiffener plates are provided between bolts, 762 mm 610 mm. 163785.244 mm? 25598000.1 mm3 134.50 mm 76 mm P/asm/z 0177+ anaes 11.545 N/mm? 1552.769 N/mm 4484395.64 Nmm 330 N/mm? at Dr.R.S. JANGID Professor Department of Civil Engineering 1.1.T. Bombay, Pewai; Mumbai-76 -34- Qa RELIANCE PORTS AND TERMINALS LTD. FR-ZR-0030 Project - 46 OSP Project No. - 10070 [Calculation No. - 110070-40-DGC-PR-EC-046 platform for wind speed -47 mis Type of Calculation - Design of 25 m Heigh PIPE POLE with cage Department - SA So consider flange plate as 3 sided fixed & one side free .Refer Roark’s table a! (spacing between stiffeners } alo’ pa fb Thickness Provided Check for Tension a 268.99 . 76 . 35a : 2.105 : pravezp2 = (Bi q bY2/1b)*0.5. . 21.63 . 25 Consider area of plate between stiffeners Tension on bolt Lever arm Moment Thickness Thickness Provided e 104,392 a 37.5 . 3914,69548, = 24,127 25 vans Dr.R.S. JANGID Professor Department of Civil Engineering 1-T. Bombay, Pewai, Mumbai. 6, KN mm) kNmm mm mm —4o- — ea RELIANCE PORTS AND TERMINALS LTD. FR-ZR.0030 Prope ac os Prana sonra _‘Yeaeubonte Type of Calculation - Design of 25 m Heigh PIPE POLE with cage platiorm for wind speed -47 mis Department - SA CONNECTION FLANGE -2 CONNECTION FORCES AT FLANGE CONNECTION -2 Moment 87 KNm Verical load = 16 KN Shear - 12 KN 00 of top pipe = 324 mm co : 420 mm No. of bolt = 4 Type of bolt (as per ts 4000) = M20 HSS Tension capacity of bolt = 88.2 KN Shear Capacity of bolt = 50.8 KN Tension per bolt = 4M/N BCD -P/N : 58.041 KN Shear per bolt = Fo/n : 09 kN nee Interaction ratio = 58.04 + og wrminstel 88.2 508 Dr. R. S. JANGID Professor Department of Civil Engineering 7. Bombay, Powai, Mumbai-76.

You might also like