Coating Specification for Steel


Structure Buried of Coal

Herman Winata
Email: HEWI@hempel.com
Painting for constructions
NEW New corrosivity categories for immersed conditions (Im4)

Blast-clean carbon steel Sa 2½ ; Surface profile: medium {G}

Corrosivity category of
Im4
environment

First coat Other primers

NDFT (µm) -

Minimum number of coats 1


NDFT of paint system (µm) ≥ 800
Minimum pull-off test value
(before ageing) determinetd in
8
accordance with ISO 4624,
Method X (MPa)

Minimum requirements for protective paint systems and their initial performance
Coating Specification
Protective System
Product DFT Description

Primer :Hempadur Multi-Strength GF 35870 400µ Glass flakes epoxy coating - Abrasion Resistance

Intermediate: Hempadur Multi-Strength GF 35870 400µ Glass flakes epoxy coating - Abrasion Resistance

Topcoat :HEMPATHANE HS 55610 100µ Glossy acrylic High Solid -Polyurethane coating. Contains zinc phosphate

Expected durability : 10 years


Please follow detail specifications

4 1 October, 2021
Detail Specifications

5 1 October, 2021
Surface preparations

6 1 October, 2021
PERFORMANCE GUARANTEE CONTRACT
(Protective, 5 years)

7 1 October, 2021
8 1 October, 2021
9 1 October, 2021
Premium Coating Advisory
Lower application costs and reduced asset downtime

With our Premium Coating Advisory service, we Service value chart


proactively advice throughout the project to
oversee surface preparation and coating Lower
“Knowledge,
operational costs
application. experience and
prompt response.”
What you get: Reduce asset
Leading European rail freight
o A coating advisor onsite throughout the entire project downtime
operator
o A pre-project inspection to verify the specification
Optimise the
and ensure everything is ready application
o Guidance to optimise time and resources process
o Ongoing quality checks
o Regular progress reports Reduce long term
maintenance cost
o A full report at the end of the project

10 1 October, 2021
Premium Coating Advisory
Lower application costs and reduced asset downtime

Pre-project Project execution Project execution Final inspection


Surface preparation Coating application and reporting

o Project briefing o Ensure surface o Ensure application o Verify coating meets


preparation meets process and ambient specification
o Visual inspection and
specification conditions meets
evaluation of existing o Document phases which
specification
coating system o Immediate advice on were witnessed during
corrective actions and o Immediate advice on project execution
o Verification of specification
follow-up on corrective actions and
Verification of paint order
implementation follow-up on
o Distribution of technical implementation
documentation to all
stakeholders
o Advice on possible
specification and paint
order adjustments

Coating advisor present full time

11 1 October, 2021
Thank you