Task ID Task Name Bucket Name

xqbXoZJo1US2Pmdhuuzlz8kAJaBu SIS for NWMA with no SVC Studies


PcxpZByUTk2Qqaf_BA3H2MkAF6zf PV/QV Curve for Mindanao Gri Studies
qu_TrC7Xs0ChUQDOF8S-x8kAJHOX PSSE Training for NOD Outage Intervening Activities
JujxwVwvDUyY9OmAOsWbz8kAPMjy 1 Pole Reclosing Study of PCB i Studies
98nqGWiVkkufXkTW7iFohMkAB0e9 PSSE Operation Presentation Process Improvement
Du2iumlNhEmO1ahdLICBHckAEahR HVDC Control Presentation Process Improvement
3bgnsFiTEEe3cZJxIbExIskADGfH Control System Presentation Process Improvement
ERuKoO2LiEWNvZuynries8kALt0O Tuning of Base Case Model (GenStudies
jnCXnkMpGEqSbKPuViQWnMkALR_S Summary of Load Demand IncreIntervening Activities
YitWpQCvSUWIEH3H8lKq5MkACK4X Simulation for the Proposed Intervening Activities
u6stYSZyukafd2K2o5kYNskABD2B Research on the Damage CurveIntervening Activities
Py5e_wEfHUeRu41_UUPk58kADx1L NWMA Island Mode Operation Studies
Qg-nqDDzlEm0sjQq53xTIMkAJt8x Study on OFR Setting - ReassessStudies
1-zf2HJ1lEOcIvzAnCI-bckAGdUr Toril - Matanao - Gensan SIPS - Studies
7bMihSXg5EqPaSi7wbsecckADfds Tuning of Dynamic Models - H Studies
TTSUCdeWNUSxGGCKZ9XhF8kAPbA6 HVDC Study in PSCAD Studies
XB7BQAHGGEmyUVpSktJik8kAJMiH VRE Penetration Study Studies
x229GKTj2ky_yFqmL6taPMkACN4F Review Cases 3&4 of MVIP Ca HVDC/MVIP Operation
ZArMGNShp0CxEyi0UfA2g8kAFAJw BESS as CR - Deadband SensitiviStudies
qdfpFKfhZE6p0M3w5u_IAMkAMlVp Converter Transformer Switchi Studies
JE5eq6L_h0aeKeQk7AjlRckAN4jr Automation of PSSE Dynamic SiProcess Improvement
M-DC6BN0WEabxz30Pd9GCckANrJY 2023 Yuletide Contingency PlanStudies
oVec4FbtZUaa-jHOoW44ZskABxVq 2023 All Saint's Day ContingencStudies
MUau_F2vJkmDeqvD5_UTPMkAL2I9 Review of NEMA SIPS 1,2 and 3Studies
O36wVX8vZ0mexzB2Q8P5BskAEIlD 2024 - 2025 Integrated Action PAGOMA
u05XBz19s0-P7BqgoSCR_ckABng3 Naga Min 2x10MVAR 138KV Cap Intervening Activities
fTSFXDP3l0-qoW_o3HgpNMkAKivc Letter to ERC RBA Signatory re Intervening Activities
JgLNP3y4NE6qKYZHd1wPU8kAFreY Revise Baloi-Kauswagan SIPS ( Studies
r0OlXj02okSKpgAa-JAVvskAFXAO CCT (138KV and 69KV Lines) Studies
YM3z1cgjXUqC-RTfOSwFs8kAEWl4 SCADA Request for N-1-1 Simula Studies
HqIQTZ10I0y1JPaURu_YSskAEaB6 Sensitivity Simulation of Powe Intervening Activities
VRbiKW9upU26y7KYFWp8OMkAJSxs 2023 Rainy Season ContingencyStudies
Oloqu368-E2IsSDZucXh5skAEPe- Memo Response to ZAMCELCOIntervening Activities
N47TE_onA0uiL_Z0zds7M8kAA5wG Power Swing Study for NWMA liIntervening Activities
xHVtKxkc8USbCQ4xffnGq8kAOL7h Review and Update N-1-1 GuideStudies
1H7CuxI5qEKuqFecFSYBC8kAEu9_ Sensitivity simulation for the Intervening Activities
ERULXERBJk6ajgs3AnE16skACUuc 2024 - 2025 Power System ModAGOMA
9MADqEJ1yE6G9YPIALvLI8kAEI-- 2023 Critical Clearing Time Studies
AR9YKEh_pUGdxPqTq6CidskAJxEA Memo re SOCOTECO II inquiriesIntervening Activities
INkcBsMdc0mAC3EhrTpc68kAJ2Tb Memo re CEPALCO proposed pro Intervening Activities
3LOJRHsax0-0MHpyw7_dSckAN--T Sensitivity Simulation of Time Intervening Activities
HkGt5m1QQEyTHPNlNMXCdMkACLSj Bunawan Nabunturan AssessmIntervening Activities
YDHHdtNgsEiNBFvkfR7OYckAB2JQ Voltage Fluctuation AssessmentIntervening Activities
II5eU24H_ke_Q3S_E0jve8kAI_ww NWMA VF on April 22, 2023 Intervening Activities
D9-C7zjKbE6vN91ljtS0EckACCT6 Voltage Projection - Maco - Ba Intervening Activities
8IkVH1bf_EOcfIpW0hzv2skAGbNM Memo Reply to ZAMCELCO re Vol Intervening Activities
nJZUbYANb0SUzLugibT7wckACZMv SEMA Line Tripping and TrippinIntervening Activities
0MvDAyWXOkqQ7upXNbNTG8kABAJ2 Voltage Fluctuation AssessmenIntervening Activities
wPpEn3KNYECP0XeoX4Db7skAC8D6 Voltage Assessment - Load TranIntervening Activities
BOo6a6SYTk-WoqqWaVk_gckALNaa Minutes of Meeting - KauswagaIntervening Activities
IEUMLy4dWUKzNRVspjNxYMkAEaDA Minutes of Meeting - Baloi - K Intervening Activities
jZtcAYDIhUGayvpnYWknP8kAMmwg N-2 SIPS of Baloi-Aurora and A Intervening Activities
DBPVZb5-skSdzpkGwIHNVMkAH-QS Memo to O&M Regarding Summe Intervening Activities
aN5Tmy0uyE20kqyOKr7jDMkANhrP Presentation Materials for Cus Intervening Activities
bBZSmKfbxEy06wuniGWSxMkAFl4g 2023 Lenten Season ContingencStudies
Xmn3amvVs0mSIScRLJwyvckAL72i NWMA Interim SIPS Presmat Studies
5BcPjztUJkOo0jRi0GsLJ8kACTmW Load Transfer of Davao-Digos Studies
VLKA0OuEHkGybhTN7Rz_u8kAPBZ4 MEMO regarding AMRECO Resolut Intervening Activities
8s57jXQ7TU64_KVvGkWCNckABhmb 2023 Summer Contingency Pla Studies
jHU4qfxPUk2JJnbwNCgu18kAIU8C Solar Penetration Study at Gen Intervening Activities
-5NGCbGcWUGpNyj3A-KRQMkACdjW Aurora T1 and T2 Paralleling Studies
1WAPN6Rdt0-pCl69n-p-UskAKdoC Comments on Dynamic AnalysiSTATCOM Project
8CKOrSkQO0es9isKm8irrskAF9sx MSOs Inputs on TransCos list ofIntervening Activities
_qzuRKBLQkSSs1ONPzlVwskAKpWg Review Cases 1, 2, 5, & 6 of HVDC/MVIP Operation
Mg9ntSArdEeh4cJGPgkX9skAJVre Comments on Voltage Flicker An STATCOM Project
bDYZ1PpeCEe_mWJSgP-vxMkAAk9X Comments on Steady State VoltSTATCOM Project
zAaqr6kHo0iy3VwhGgf9zMkAPw7h Comments on Voltage Stability STATCOM Project
2E6kG7ET7EOnliropOArtskANJnH Comments on Step Change Volta STATCOM Project
OmQk4aoxOEWJrge6gVwc-8kAM23n Microsoft To Do Setup Process Improvement
Progress Priority Assigned To Created By
Not started Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E.;CamangyanLacastesantos, Anthony
Not started Important Camangyan, Michael Rey S. Lacastesantos, Anthony
Not started Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Not started Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Not started Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Not started Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Not started Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
In progress Urgent Sale, Jeff Nathan E.;CamangyanCamangyan, Michael Rey
Not started Medium Sale, Jeff Nathan E.
In progress Medium Camangyan, Michael Rey S. Camangyan, Michael Rey
Not started Medium Mañus, Arniel C.;Sale, Jeff NathSale, Jeff Nathan E.
Not started Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
In progress Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
In progress Medium Camangyan, Michael Rey S.;LacLacastesantos, Anthony
In progress Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
In progress Medium Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E.
In progress Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Not started Medium Sale, Jeff Nathan E.
Completed Important Sale, Jeff Nathan E. Lacastesantos, Anthony
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Important Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Camangyan, Michael Rey S.;LacSale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E.;CamangyanSale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Medium Camangyan, Michael Rey S. Camangyan, Michael Rey
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Important Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Important Camangyan, Michael Rey S.;LacLacastesantos, Anthony
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Important Camangyan, Michael Rey S.;LacCamangyan, Michael Rey
Completed Medium Camangyan, Michael Rey S.;LacSale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Lacastesantos, Anthony
Completed Medium Camangyan, Michael Rey S. Camangyan, Michael Rey
Completed Medium Mañus, Arniel C. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Completed Medium Camangyan, Michael Rey S. Sale, Jeff Nathan E.
Completed Medium Lacastesantos, Anthony F. Sale, Jeff Nathan E.
Completed Medium Sale, Jeff Nathan E. Sale, Jeff Nathan E.
Created Date Start Date Due Date Is Recurrin Late Completed Dat
07/24/2023 07/24/2023 07/28/2023 false false
07/11/2023 07/15/2023 false true
07/11/2023 07/20/2023 false true
07/11/2023 08/31/2023 false false
06/02/2023 false false
06/02/2023 false false
06/02/2023 false false
06/02/2023 12/31/2023 false false
05/07/2023 false false
05/05/2023 05/06/2023 05/08/2023 false true
04/28/2023 false false
04/24/2023 06/09/2023 false true
03/31/2023 07/14/2023 false true
03/31/2023 07/10/2023 false true
03/31/2023 10/31/2023 false false
03/31/2023 08/31/2023 false false
03/14/2023 07/31/2023 false false
01/31/2023 07/31/2023 false false
01/26/2023 07/31/2023 false false
01/25/2023 01/24/2023 07/31/2023 false false
01/25/2023 12/30/2023 false false
01/25/2023 12/09/2023 false false
01/25/2023 10/21/2023 false false
01/25/2023 07/10/2023 false true
01/25/2023 05/31/2023 false true
07/11/2023 07/24/2023 false false 07/24/2023
06/22/2023 false false 07/12/2023
01/31/2023 01/18/2023 03/06/2023 false false 07/12/2023
06/13/2023 07/06/2023 false false 07/11/2023
01/26/2023 01/25/2023 02/12/2023 false false 07/11/2023
06/13/2023 06/16/2023 false false 07/03/2023
01/25/2023 06/24/2023 false false 07/03/2023
06/02/2023 06/02/2023 false false 06/22/2023
04/28/2023 06/09/2023 false false 06/13/2023
01/25/2023 05/31/2023 false false 06/05/2023
06/02/2023 05/29/2023 06/02/2023 false false 06/02/2023
01/25/2023 05/01/2023 false false 06/02/2023
01/25/2023 05/12/2023 false false 05/26/2023
05/19/2023 false false 05/19/2023
05/19/2023 false false 05/19/2023
04/28/2023 false false 05/19/2023
05/11/2023 05/12/2023 false false 05/19/2023
04/28/2023 false false 04/28/2023
04/24/2023 04/26/2023 false false 04/27/2023
03/31/2023 false false 04/05/2023
03/31/2023 false false 04/05/2023
01/30/2023 01/30/2023 03/31/2023 false false 03/31/2023
03/31/2023 03/18/2023 false false 03/31/2023
03/31/2023 false false 03/31/2023
03/31/2023 false false 03/31/2023
03/31/2023 false false 03/31/2023
03/07/2023 02/27/2023 03/10/2023 false false 03/31/2023
03/22/2023 03/21/2023 false false 03/27/2023
02/17/2023 03/03/2023 false false 03/27/2023
01/25/2023 03/17/2023 false false 03/24/2023
01/30/2023 02/03/2023 false false 03/13/2023
03/03/2023 03/06/2023 false false 03/10/2023
03/03/2023 02/21/2023 false false 03/03/2023
01/25/2023 03/31/2023 false false 03/03/2023
02/28/2023 02/28/2023 false false 03/02/2023
02/03/2023 02/08/2023 false false 02/21/2023
02/17/2023 02/20/2023 false false 02/21/2023
02/19/2023 false false 02/19/2023
02/07/2023 02/28/2023 false false 02/07/2023
01/25/2023 01/30/2023 false false 01/31/2023
01/25/2023 01/30/2023 false false 01/31/2023
01/25/2023 01/30/2023 false false 01/31/2023
01/25/2023 01/30/2023 false false 01/30/2023
01/25/2023 01/27/2023 false false 01/26/2023
Completed By CompletedChecklist Items

3/4 Presented the result of assessment;Pre

2/3 Revisions;To be presented to RCV;Submi

0/1 Model HVDC in PSCAD


0/2 Basecase Preparation;Update Governor
0/10 N-1-1 of Lala 230kV Transformer;Simultaneous Outage of Kauswagan-Lala 230kV
0/1 Consider Steel Plants
2/7 Model Transformer with Magnetization;

1/2 Submitted to XMGL;Submitted to ACM - Ju


0/1 Include 1 Pole Reclosing
Sale, Jeff Nathan E. 2/2 Submitted for Review;Presentation Material
Sale, Jeff Nathan E.
Sale, Jeff Nathan E. 9/9 Basecase Preparation;Submit for Review;
Lacastesantos, Anthony F.
Lacastesantos, Anthony1/4 NWMA N-1-1;VLN-JAS N-1-1;JAS-BUT & J
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Lacastesantos, Anthony F.
Camangyan, Michael Rey S.
Lacastesantos, Anthony F.
Sale, Jeff Nathan E.
Lacastesantos, Anthony8/8 District 4 - Reycamz;District 2 - Tonton;DA
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Camangyan, Michael Rey S.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E. 2/2 Submit to Sir Mark;Draft
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E.
Sale, Jeff Nathan E. 4/4 Send for Transmittal;Send for Review;Upload to DASH;Draft
Sale, Jeff Nathan E. 7/7 Combine NWMA Interim SIPS and N-2 Kauswagan Lala SIPS;Submit for Review;PG
Camangyan, Michael Rey S.
Camangyan, Michael Rey4/4 XMGL review done;RCV review done;Submit
Sale, Jeff Nathan E. 3/3 Submit for Approval;Presentation Material;Basecase Preparation
Camangyan, Michael Rey S.
Camangyan, Michael Rey1/1 Submitted to OAMS
Sale, Jeff Nathan E. 1/1 Submit the PV Curve
Sale, Jeff Nathan E. 5/5 Upload to Repository;Write SIS;Basecase;Upload to DASH;Submit for Review
Sale, Jeff Nathan E.
Lacastesantos, Anthony F.
Camangyan, Michael Rey S.
Camangyan, Michael Rey S.
Camangyan, Michael Rey S.
Camangyan, Michael Rey S.
Lacastesantos, Anthony F.
Sale, Jeff Nathan E.
Labels Description

Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Workplan
Non-Workplan
Non-Workplan
Non-Workplan
mer;Simultaneous Outage of Kauswagan-Lala 230kV L1 and Lala-Aurora 138kV TL1;Simultaneous Outage of Baloi-Aurora and Ag
Non-Workplan Done for underfreq. For overfreq ongoing.
Non-Workplan
Workplan
Workplan
Workplan
Workplan
Workplan
tation Material

Workplan

Non-Workplan Validation of SCADA's DTS simulation result during an N-1-1 of the listed li

Workplan
Non-Workplan
Non-Workplan Presented to NPD and MTD last June 8, 2023
Workplan May 31, 2023 - CompletedJune 1, 2023 - Submitted to NOD and SED

Workplan DigSILENT - AnthonyPSS/E - Michael


Workplan

Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan Retrieve the TR load profile of Maco to assess the magnitude of load redu
Non-Workplan

Review;Upload to DASH;Draft
and N-2 Kauswagan Lala SIPS;Submit for Review;PGC Provisions;Proposed SIPS;Background;Long Term Projects;Submit for Rev
Workplan Mar 17 - Completed
Non-Workplan Feb 3, 2023 - Submitted to sir Arniel for reviewFeb 6, 2023 - ACM submitte
tion Material;Basecase Preparation
Feb 19, 2023 - Submitted to RCVFeb 21, 2023 - Submitted to NSO
Workplan Mar 2, 2023 - Completed. Submitted to OAMS

S;Basecase;Upload to DASH;Submit for Review

Workplan
Workplan
Workplan
Workplan
Non-Workplan
of Baloi-Aurora and Agus 5 - Aurora 138kV TL;N-1 and N-2 of Baloi-Kauswagan 230kV TL;Outage of HVDC MVIP;Simultaneous O

an N-1-1 of the listed lines through our DIgSILENT1. N-1-1 of Aurora-Agus 5/Baloi2. N-1-1 of Villanueva-Jasaan L1 & L2

d to NOD and SED

magnitude of load reductionCoordinate with Sir Jay Papin regarding the type loads at Maco and Bunawan area
Projects;Submit for Review

6, 2023 - ACM submitted to XMGL for reviewMar 1, 2023 - Submitted to NSO (Ma'am Heidi) for final review

mitted to NSO
of HVDC MVIP;Simultaneous Outage of Kauswagan-Lala 230kV L1 and Baloi-Aurora 138kV TL;N-1 and N-2 of Kauswagan-Lala 2

anueva-Jasaan L1 & L2

Bunawan area
1 and N-2 of Kauswagan-Lala 230kV TL;Simultaneous Outage of Baloi-Kauswagan 230kV L1 and Baloi-Aurora 138kV TL1;Outage
Baloi-Aurora 138kV TL1;Outage of GN Power Plant;N-2 of Lala-Aurora 138kV TL