Tasks Monitoring
Tasks Monitoring
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan
Workplan
Non-Workplan
Non-Workplan
Non-Workplan
mer;Simultaneous Outage of Kauswagan-Lala 230kV L1 and Lala-Aurora 138kV TL1;Simultaneous Outage of Baloi-Aurora and Ag
Non-Workplan Done for underfreq. For overfreq ongoing.
Non-Workplan
Workplan
Workplan
Workplan
Workplan
Workplan
tation Material
Workplan
Non-Workplan Validation of SCADA's DTS simulation result during an N-1-1 of the listed li
Workplan
Non-Workplan
Non-Workplan Presented to NPD and MTD last June 8, 2023
Workplan May 31, 2023 - CompletedJune 1, 2023 - Submitted to NOD and SED
Non-Workplan
Non-Workplan
Non-Workplan
Non-Workplan Retrieve the TR load profile of Maco to assess the magnitude of load redu
Non-Workplan
Review;Upload to DASH;Draft
and N-2 Kauswagan Lala SIPS;Submit for Review;PGC Provisions;Proposed SIPS;Background;Long Term Projects;Submit for Rev
Workplan Mar 17 - Completed
Non-Workplan Feb 3, 2023 - Submitted to sir Arniel for reviewFeb 6, 2023 - ACM submitte
tion Material;Basecase Preparation
Feb 19, 2023 - Submitted to RCVFeb 21, 2023 - Submitted to NSO
Workplan Mar 2, 2023 - Completed. Submitted to OAMS
Workplan
Workplan
Workplan
Workplan
Non-Workplan
of Baloi-Aurora and Agus 5 - Aurora 138kV TL;N-1 and N-2 of Baloi-Kauswagan 230kV TL;Outage of HVDC MVIP;Simultaneous O
an N-1-1 of the listed lines through our DIgSILENT1. N-1-1 of Aurora-Agus 5/Baloi2. N-1-1 of Villanueva-Jasaan L1 & L2
magnitude of load reductionCoordinate with Sir Jay Papin regarding the type loads at Maco and Bunawan area
Projects;Submit for Review
6, 2023 - ACM submitted to XMGL for reviewMar 1, 2023 - Submitted to NSO (Ma'am Heidi) for final review
mitted to NSO
of HVDC MVIP;Simultaneous Outage of Kauswagan-Lala 230kV L1 and Baloi-Aurora 138kV TL;N-1 and N-2 of Kauswagan-Lala 2
anueva-Jasaan L1 & L2
Bunawan area
1 and N-2 of Kauswagan-Lala 230kV TL;Simultaneous Outage of Baloi-Kauswagan 230kV L1 and Baloi-Aurora 138kV TL1;Outage
Baloi-Aurora 138kV TL1;Outage of GN Power Plant;N-2 of Lala-Aurora 138kV TL