You are on page 1of 6

NOTES :

CANTILEVER AT ELEVATION +13450 & ELEVATION +11450 (3000-PRA-0006)

KNOCK DOWN
EL.+13450

KNOCK DOWN

750

Spur
3000-SLF-0006 1080 356
EL.+11450

3000-PRA-0006

Open Gap for 840


Piping
890 3D VIEW OF SCAFFOLD
1600

564

Lacing tube at FRONT VIEW OF


both cords Lacing tube at SCAFFOLD CANTILEVER
ladder beam 1500 1129 889 1800 both cords
ladder beam

2749 2749

FRONT VIEW OF
SCAFFOLD FOR BRIDGE
USE BEAM CLAMP
ACCESS

SCFOLDING DESIGN FOR


CONNECTING 3000-SLF-0006
TO 3000-PRA-0006 (C AREA)

1:1 Page.1
NOTES :
GRID 1 (3000-PRA-0006) GRID 2 (3000-PRA-0006)

3000-PRA-0006

890 Open Gap for Piping

3262

5749
3000-SLF-0006

2262

Intermediate Transom Intermediate Transom Intermediate Transom


2000 1980 1650 1900

PLAN VIEW OF SCAFFOLD


FOR BRIDGE ACCESS
SCFOLDING DESIGN FOR
CONNECTING 3000-SLF-0006
TO 3000-PRA-0006 (C AREA)

1:1 Page.2
NOTES :

1800 1800 1800 1225 905

1800 1700 1000 1430 1600

Intermediate Transom Intermediate Transom Intermediate Transom

2000 1980 1650 1900

SIDE VIEW OF SCAFFOLD FOR


BRIDGE ACCESS & CANTILEVER
SCFOLDING DESIGN FOR
CONNECTING 3000-SLF-0006
TO 3000-PRA-0006 (C AREA)

1:1 Page.3
NOTES :

3D VIEW OF SCAFFOLD

SCFOLDING DESIGN FOR


CONNECTING 3000-SLF-0006
TO 3000-PRA-0006 (C AREA)

1:1 Page.4
VIEW FROM  EAST
VIEW FROM WEST

You might also like