You are on page 1of 21

SEGMEN 2

Kantor Tenaga Listrik Bengkulu


AKHIR PROYEK
EFEKTIF (
Sta 5 + 625
X = 196970.334
Y = 9566862.220
Z = 4.046
Rigid (Eksisting) Gorong gorong
( eksisting)
Bahu Jalan
Tepi Jalan TL Tiang Lampu /
Listrik
As Jalan
STA 5+400
Batas lahan Tenan Pohon Cemara /
Gorong Ø 80 cm ( double )
Sawit
Titik Simpan ( TB 1 )
X = 197090.684 Titik Simpan ( TP )
Y = 9566711.807
Z = 4.275
X = 197095.728
Y = 9566726.963
Z = 4.078
STA 5+020
Gorong Ø 80 cm ( double )
X =197401.674
Y = 9566326.567
Z = 3.183
X = 197428.962
Y = 9566352.873
Z = 3.161
Awal Proyek Efektif
( Sta 4+355
1 : 5.750
PETA SITUASI JALAN
ALINYEMEN HORIZONTAL
DAN
ALINYEMEN VERTIKAL
BP

10
-5

5
4+350

4350.0

0,70%
10.0

4+360
4360.0
10.0

4+370
4370.0
10.0

4380.0
4+380
10.0

4390.0
4+390
10.0

4+400

0,00 %
4400.0

(
Awal Proyek Efektif
10.0

4+410
4410.0
10.0

4+420
4420.0
10.0

4+430
4430.0
10.0

4+440
4440.0
10.0

4+450

4450.0
10.0

4+460

0,90 %
4460.0
10.0

4470.0
4+470
10.0

4480.0
4+480
10.0

4490.0
4+490

Sta 4+355
10.0

4+500

4500.0
10.0

4+510
4510.0
10.0

4+520 4+600
4520.0
10.0

4+530
4530.0
10.0

4+540
4540.0
10.0

4+550

4550.0
10.0

0,00 %

4+560
4560.0
10.0

4570.0
4+570
10.0

4580.0
4+580
10.0

4+590
4590.0
10.0

4+600

4600.0
10.0

4+610
4610.0
10.0

4+620
4620.0
4+700
10.0

4+630
4630.0
10.0

4+640
4640.0
10.0

4+650

4650.0
10.0

4660.0
4+660
10.0

4670.0
4+670 4+750
10.0

4+680
4680.0
10.0

4+690
4690.0
10.0

4+700

4700.0
10.0

4+710
4710.0
10.0

4+720
4720.0
4+800
10.0

4+730
4730.0
10.0

4+740
4740.0
10.0

4+750

4750.0
10.0

4760.0
4+760
10.0

4+770
4770.0
10.0

4+780
4780.0
10.0

4+790
4790.0
10.0

4+800

4800.0
10.0

4+810
4810.0
10.0

4+820 4+900
4820.0
10.0

4+830
4830.0
10.0

4840.0
4+840
10.0

4+850

4850.0
10.0

4860.0
4+860
10.0

4+870
4870.0
10.0

4+880
4880.0
10.0

4+890
4890.0
10.0

4+900

4900.0
10.0

4+910
4910.0
10.0

4+920
4920.0
10.0

4930.0
4+930
10.0

4940.0
4+940
10.0

4+950

4950.0
10.0

4+960
4960.0
10.0

4+970
4970.0
10.0

4+980
4980.0
10.0

4+990
4990.0
10.0

5+000

5000.0
10.0

5+010
5010.0
10.0

5020.0
5+020
10.0

5030.0
5+030
10.0

5040.0
5+040
10.0

5+050

5050.0
10.0

5+060
5060.0
5+150
10.0

5+070
5070.0
10.0

5+080
5080.0
10.0

5+090
5090.0
10.0

5+100

5100.0
10.0

5110.0
5+110
10.0

5120.0
5+120
10.0

5130.0
5+130
10.0

5+140
5140.0
10.0

5+150

+ 0,07 %

5150.0
10.0

5+160
5160.0
10.0

5+170
5170.0
10.0

5+180
5180.0
10.0

5+190
5190.0
10.0

5+200

5200.0
10.0

5210.0
5+210
10.0

5220.0
5+220
10.0

5+230
5230.0
10.0

5+240
5240.0
10.0

5+250

5250.0
10.0

5+260
5260.0
10.0

5+270
5270.0
10.0

5+280
5280.0
10.0

5290.0
5+290
10.0

5+300

5300.0
10.0

5310.0
5+310
10.0

5+320
5320.0
10.0

5+330
5330.0
10.0

5+340
5340.0
10.0

5+350

5350.0
10.0

5+360
5360.0
10.0

5+370
5370.0
5+450
10.0

5380.0
5+380
10.0

5390.0
5+390
10.0

5+400

5400.0
10.0

5+410
5410.0
10.0

5+420
5420.0
10.0

5+430
5430.0
10.0

5+440
5440.0
10.0

5+450

5450.0
10.0

5+460
5460.0
10.0

5470.0
5+470
10.0

5480.0
5+480
10.0

5490.0
5+490
10.0

5+500

5500.0
10.0

5+510
5510.0
10.0

5+520
5520.0
10.0

5+530
5530.0
10.0

5+540
5540.0
10.0

5+550

5550.0
10.0

5560.0
5+560
10.0

5570.0
5+570
10.0

5580.0
5+580
1.42 %
10.0

5+590
5590.0
10.0

5+600

5600.0
10.0

5+610
5610.0
10.0

5+615
5620.0
10.0

5+625
5+630

5630.0
Titik Simpan ( TB 1 )
U - Ditch

Pasangan Batu

Titik Simpan ( TP )

Muka Jalan Eksisting


Batas lahan Tenan

Bahu Jalan
Beton (Eksisting)
ALINYEMEN HORIZONTAL

Top Galian / Scrapping

Top Base A
Top Beton Rigid

Tepi Jalan
As Jalan
ALINYEMEN VERTIKAL
DAN

TL

Boks ( eksisting)
Gorong gorong
Tiang Lampu /
H = 1 : 5000

Pohon Cemara /
V = 1 : 500

Drainase

Listrik

( eksisting)
Sawit
L4
355
L4
340
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.00 % 1.79 %
0.18 % 0.16 % 0.00 %
4.00
2.00
BP
4+350 4+360 4+370 4+380 4+390 4+400 4+410 4+420 4+430 4+440 4+450 4+460 4+470 4+480 4+490 4+500 4+510 4+520 4+530 4+540 4+550
4+355

4350.0

4360.0

4370.0

4380.0

4390.0

4400.0

4410.0

4420.0

4430.0

4440.0

4450.0

4460.0

4470.0

4480.0

4490.0

4500.0

4510.0

4520.0

4530.0

4540.0

4550.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
H = 1 : 1000

4.429

4.407

4.232

4.213

4.205

3.967

3.701

3.667

3.675

3.733

3.633

3.595

3.651

3.693

3.654
4.175

4.095

4.073

4.073

4.003

4.004
V = 1 : 100

4.456

4.532

4.532

4.532

4.532

4.532

4.532

4.532

4.532

4.532

4.532

4.397

4.263

4.247

4.231

4.216

4.200

4.200

4.200

4.200
4.429
4.429
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4 + 355 s/d 4 + 550
L5
-4
730
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.00 %
4.00
2.00
BP
4+550 4+560 4+570 4+580 4+590 4+600 4+610 4+620 4+630 4+640 4+650 4+660 4+670 4+680 4+690 4+700 4+710 4+720 4+730 4+740 4+750

4710.0

4720.0

4730.0

4740.0

4750.0
4550.0

4560.0

4570.0

4580.0

4590.0

4600.0

4610.0

4620.0

4630.0

4640.0

4650.0

4660.0

4670.0

4680.0

4690.0

4700.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
H = 1 : 1000

3.654

3.642

3.675

3.759

3.798

3.763

3.733

3.653

3.626

3.634

3.618

3.651

3.645

3.643

3.613

3.606

3.723

3.763

3.813

3.746

3.676
V = 1 : 100

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200
4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4 + 550 s/d 4 + 750
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.00 %
4.00
2.00
BP
4+750 4+760 4+770 4+780 4+790 4+800 4+810 4+820 4+830 4+840 4+850 4+860 4+870 4+880 4+890 4+900 4+910 4+920 4+930 4+940 4+950

4750.0

4760.0

4770.0

4780.0

4790.0

4800.0

4810.0

4820.0

4830.0

4840.0

4850.0

4860.0

4870.0

4880.0

4890.0

4900.0

4910.0

4920.0

4930.0

4940.0

4950.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0
H = 1 : 1000

3.264

3.443

3.576

3.601

3.678

3.676

3.730

3.788

3.723

3.724
3.754

3.580

3.608

3.495

3.598

3.630

3.463

3.283
3.676

3.650

3.496
V = 1 : 100

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200
4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200
4.200
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4+750 s/d 4 + 950
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.00 % 0.07 %
4.00
2.00
BP
4+950 4+960 4+970 4+980 4+990 5+000 5+010 5+020 5+030 5+040 5+050 5+060 5+070 5+080 5+090 5+100 5+110 5+120 5+130 5+140 5+150
5+050

5060.0

5070.0

5080.0

5090.0

5100.0

5110.0

5120.0

5130.0

5140.0

5150.0
4950.0

4960.0

4970.0

4980.0

4990.0

5000.0

5010.0

5020.0

5030.0

5040.0

5050.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

3.589

3.700
3.704

3.676

3.670
H = 1 : 1000

3.724

3.596

3.556

3.650

3.529

3.427

3.477

3.499

3.392

3.652

3.674

3.671

3.626
3.553

3.482

3.452
V = 1 : 100

4.200

4.200

4.200

4.200

4.200

4.200

4.207
4.200

4.200

4.200
4.200

4.200

4.200
4.200

4.200

4.200

4.200

4.200

4.200

4.200

4.200
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4 + 950 s/d 5 + 150
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.07 %
4.00
2.00
BP
5+150 5+160 5+170 5+180 5+190 5+200 5+210 5+220 5+230 5+240 5+250 5+260 5+270 5+280 5+290 5+300 5+310 5+320 5+330 5+340 5+350

5150.0

5160.0

5170.0

5180.0

5190.0

5200.0

5210.0

5220.0

5230.0

5240.0

5250.0

5260.0

5270.0

5280.0

5290.0

5300.0

5310.0

5320.0

5330.0

5340.0

5350.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

3.828

3.775

3.801

3.772

3.802

3.748

3.932

3.956

3.958

3.882
H = 1 : 1000

3.934

3.853

3.832

3.776

3.809

3.942
3.700

3.627

3.777

3.675

3.755
V = 1 : 100

4.207

4.241

4.248

4.255

4.261

4.268

4.275
4.214

4.220

4.227

4.234

4.282

4.289

4.295

4.302

4.309

4.316

4.323

4.330

4.336

4.343
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4 + 150 s/d 5 + 350
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
0.07 %
4.00
2.00
BP
5+350 5+360 5+370 5+380 5+390 5+400 5+410 5+420 5+430 5+440 5+450 5+460 5+470 5+480 5+490 5+500 5+510 5+520 5+530 5+540 5+550

5350.0

5360.0

5370.0

5380.0

5390.0

5400.0

5410.0

5420.0

5430.0

5440.0

5450.0

5460.0

5470.0

5480.0

5490.0

5500.0

5510.0

5520.0

5530.0

5540.0

5550.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

3.948

3.750

3.876

3.950

4.019

4.069

4.112

4.004
3.882

3.938

3.778

3.918

3.887

3.795

3.820

3.933

3.892

3.910
H = 1 : 1000

3.866
3.946

3.892
V = 1 : 100

4.343

4.418

4.425

4.432

4.439

4.445

4.452

4.459

4.466

4.473

4.480
4.350

4.357

4.364

4.370

4.377

4.384

4.391

4.398

4.405

4.411
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 4 + 350 s/d 5 + 550
Akhir Proyek Efektif
( Sta 5+625
Beton (Eksisting) Boks ( eksisting)
Bahu Jalan Gorong gorong
( eksisting)
Tepi Jalan
As Jalan TL Tiang Lampu /
Listrik
Batas lahan Tenan
Muka Jalan Eksisting Drainase
Titik Simpan ( TB 1 )
Pohon Cemara /
Titik Simpan ( TP ) Sawit
Top Beton Rigid
Top Base A
Top Galian / Scrapping
Pasangan Batu
U - Ditch
6.00
2.00 %
4.2
4.00 9%
2.00
BP

5+625
5+550 5+560 5+570 5+580 5+590 5+600 5+610 5+620 5+630

5550.0

5560.0

5570.0

5580.0

5590.0

5600.0

5610.0

5620.0

5630.0
10.0 10.0 10.0 10.0 10.0 10.0 10.0 10.0

3.903

3.845

3.829

3.685

3.763

3.615

3.582

3.560
H = 1 : 1000

3.866
V = 1 : 100

4.480
4.100

4.490

4.490

4.500

4.357

4.214

4.071
4.000
3.853
3.571
3.560
ALINYEMEN HORIZONTAL DAN
ALINYEMEN VERTIKAL
sta 5 + 550 s/d 5 + 615
Gambar
POTONGAN MELINTANG
STA 4+355 STA 4+380
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.532
ELEVASI TOP RIGID 4.36 4.43 4.36 ELEVASI TOP RIGID 4.462 4.462
4.36
4.13 4.232
Muka jalan Eksisting
ELEVASI TOP BASE A 4.06 4.06 ELEVASI TOP BASE A 4.162 4.162
ELEVASI TOP SIRTU 3.78 3.85 3.78 ELEVASI TOP SIRTU 3.887 3.957 3.887 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
3.537 4.303 4.420 4.429 4.385 4.475 3.185 4.429 4.100 4.142 4.213 4.122 4.123 3.848
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 Tiang Listrik/ Lampu
Pohon
STA 4+360 STA 4+390
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.456 4.532
ELEVASI TOP RIGID 4.386 4.386 ELEVASI TOP RIGID 4.462 4.462
ELEVASI TOP BASE A 4.086 4.156 4.086 ELEVASI TOP BASE A 4.162 4.232 4.162
ELEVASI TOP SIRTU 3.811 3.881 3.811 ELEVASI TOP SIRTU 3.887 3.957 3.887
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
4.303 4.173 4.339 4.407 4.367 4.205 3.888 4.385 4.021 4.157 4.205 4.117 3.670 3.705
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
STA 4+370 STA 4+400
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.532 4.532
ELEVASI TOP RIGID 4.462 4.462 ELEVASI TOP RIGID 4.462 4.462
ELEVASI TOP BASE A 4.162 4.232 4.03 ELEVASI TOP BASE A 4.162 4.232 4.162
31 1 : 200
ELEVASI TOP SIRTU 3.887 3.83 3.887 ELEVASI TOP SIRTU 3.887 3.957 3.887
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
4.420 4.117 4.148 4.232 4.087 4.092 4.155 4.475 3.789 4.120 4.175 4.085 4.155 3.693
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 350 s/d 4 + 400
STA 4+410 STA 4+440
CL CL
5.00 5.00
Jalan Dermaga Samudera
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.532 4.532
ELEVASI TOP RIGID 4.462 4.462 ELEVASI TOP RIGID 4.462 4.462
4.232 4.232
Muka jalan Eksisting
ELEVASI TOP BASE A 4.162 4.162 ELEVASI TOP BASE A 4.162 4.162
ELEVASI TOP SIRTU 3.887 3.957 3.887 ELEVASI TOP SIRTU 3.887 3.957 3.887 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
ELEVASI EKSISTING 3.185 3.681 4.038 4.095 4.037 3.773 3.537 ELEVASI EKSISTING 3.630 3.964 4.003 3.875 3.573 3.398
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 Tiang Listrik/ Lampu
Pohon
STA 4+420 STA 4+450
Jalan Rencana
CL CL
5.00 5.00
Jalan Dermaga Samudera
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.532 4.532
ELEVASI TOP RIGID 4.462 4.462 ELEVASI TOP RIGID 4.462 4.462
ELEVASI TOP BASE A 4.162 4.232 4.162 ELEVASI TOP BASE A 4.162 4.232 4.162
ELEVASI TOP SIRTU 3.887 3.957 3.887 ELEVASI TOP SIRTU 3.887 3.957 3.887
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.503 4.030 4.073 4.005 3.682 3.585 3.339 3.689 3.943 4.004 3.912 3.705 3.455
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
STA 4+430
STA 4+460
CL CL
5.00 5.00
Jalan Dermaga Samudera Jalan Dermaga Samudera
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.532 4.532
ELEVASI TOP RIGID 4.462 4.462 ELEVASI TOP RIGID 4.462 4.462
ELEVASI TOP BASE A 4.162 4.232 4.162 ELEVASI TOP BASE A 4.162 4.232 4.162
32 1 : 200
ELEVASI TOP SIRTU 3.887 3.957 3.887 ELEVASI TOP SIRTU 3.887 3.957 3.887
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.563 4.037 4.048 3.923 3.777 3.638 3.373 3.837 3.967 3.900 3.612 3.525
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 410 s/d 4 + 460
PEKERJAAN PENETRASI
PADA LOKASI GETOUT JALAN JETTY
EKS BUKIT SUNUR
Muka aspal Eksisting
Muka jalan Eksisting
CL
As Jalan Eksisting
Tiang Listrik/ Lampu
Pohon
STA 4+450
CL Jalan Dermaga Samudera ( Get In)
5.00
4.00
3.00
2.00
bidang persamaan
reference level
0.00
4.532
ELEVASI TOP RIGID 4.462 4.462
ELEVASI TOP BASE A 4.162 4.232 4.162
ELEVASI TOP SIRTU 3.887 3.957 3.887
EL. TOP LANTAI UDITCH
3.339 3.689 3.943 4.004 3.912 3.705 3.455
ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
32 1 : 150
POTONGAN MELINTANG
Sta 4 +450
STA 4+500
STA 4+470
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.397 4.23
ELEVASI TOP RIGID 4.327 4.327 ELEVASI TOP RIGID 4.16 4.16
4.097 3.93
Muka jalan Eksisting
ELEVASI TOP BASE A 4.027 4.027 ELEVASI TOP BASE A 3.86 3.86
ELEVASI TOP SIRTU 3.752 4.097 3.752 ELEVASI TOP SIRTU 3.58 3.66 3.58 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
ELEVASI EKSISTING 3.705 3.602 3.345 3.701 3.703 3.573 3.278 ELEVASI EKSISTING 3.061
3.571
3.675 3.737 3.733 3.505 3.009 2.841
JARAK (m) JARAK (m) Tiang Listrik/ Lampu

0.50
0.50
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Pohon
STA 4+480
STA 4+510
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.26 4.22
ELEVASI TOP RIGID 4.19 4.19 ELEVASI TOP RIGID 4.15 4.15
ELEVASI TOP BASE A 3.89 3.96 3.89 ELEVASI TOP BASE A 3.85 3.92 3.85
ELEVASI TOP SIRTU 3.61 3.69 3.61 ELEVASI TOP SIRTU 3.57 3.64 3.57
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.810 3.722 3.388 3.667 3.612 3.923 4.159 4.231 3.065 3.120
3.421 3.567 3.633 3.635 3.460 3.029
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) JARAK (m)

0.50
3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.50 3.00 3.00 3.00 3.00 3.00
STA 4+490
STA 4+520
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.25 4.2
ELEVASI TOP RIGID 4.18 4.18 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.88 3.95 3.88 ELEVASI TOP BASE A 3.83 3.9 3.83
33 1 : 200
ELEVASI TOP SIRTU 3.6 3.67 3.6 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.855 3.886 3.347 3.675 3.636 4.528 3.829 4.023 2.953 2.888
3.440 3.566 3.595 3.596 3.217 2.979
ELEVASI EKSISTING ELEVASI EKSISTING

0.50
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 1.00 2.00 3.50 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 470 s/d 4 + 520
STA 4+530 STA 4+560
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.2 4.2
ELEVASI TOP RIGID 00 000 00 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
3.9 3.9
Muka jalan Eksisting
ELEVASI TOP BASE A 3.83 3.83 ELEVASI TOP BASE A 3.83 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
ELEVASI EKSISTING 2.891 3.051 3.727 3.628 3.651 3.631 3.751 3.923 ELEVASI EKSISTING 2.898 2.713 3.491 3.603 3.642 3.657 3.758 3.183
JARAK (m) 1.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 2.00 1.00 3.00 3.00 3.00 3.00 3.00 Tiang Listrik/ Lampu
Pohon
STA 4+540 STA 4+570
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
2.881 2.657 3.660 3.598 3.693 3.751 3.695 3.615 2.388 3.077 3.069 3.541 3.671 3.675 3.727 3.660 3.588 2.757 2.96
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 2.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 2.50 1.00 3.00 3.00 3.00 3.00 2.00 1.00 3.00
STA 4+550 STA 4+580
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
34 1 : 200
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.042 3.045 3.435 3.578 3.654 3.731 3.698 3.510 3.841 3.828 3.752 3.759 3.748 3.489 3.058
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 2.00 1.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 530 s/d 4 + 580
STA 4+590 STA 4+620
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
3.9 3.9
Muka jalan Eksisting
ELEVASI TOP BASE A 3.83 3.83 ELEVASI TOP BASE A 3.83 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
4.006 3.906 3.858 3.798 3.759 3.758 3.506 3.183 3.238 3.371 3.636 3.653 3.651 3.939 3.538
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 Tiang Listrik/ Lampu
Pohon
STA 4+630
STA 4+600
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.429 3.608 3.763 3.763 3.786 3.889 3.854 2.984 2.968
3.348 3.426 3.688 3.626 3.651 3.368 2.936
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) JARAK (m)

0.50
3.00 3.00 3.00 3.00 3.00 3.00 2.00 2.00 3.00 3.00 3.00 3.00 3.00
STA 4+610 STA 4+640
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
35 1 : 200
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
3.411 3.521 3.769 3.733 3.719 3.891 3.871 2.848 2.896 3.134 3.526 3.634 3.561 3.348 2.761
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 2.00 1.50 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 590 s/d 4 + 640
STA 4+650
STA 4+680
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
3.9 3.9
Muka jalan Eksisting
ELEVASI TOP BASE A 3.83 3.83 ELEVASI TOP BASE A 3.83 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
2.829 2.798 3.413 3.602 3.618 3.573 3.410 2.736 2.903 2.769
3.170 3.361 3.540 3.643 3.597 3.376 2.895
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) JARAK (m) Tiang Listrik/ Lampu

0.50
3.00 3.00 3.00 3.00 3.00 3.00 3.00 2.50 2.00 3.00 3.00 3.00 3.00 3.00
Pohon
STA 4+660
STA 4+690
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
2.837 2.741 3.275 3.422 3.530 3.651 3.641 3.940 2.730 2.709 2.693 2.736 3.460 3.410 3.559 3.613 3.590 3.363 2.955
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 2.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 2.00 1.00 1.50 3.00 3.00 3.00 3.00 3.00
STA 4+670 STA 4+700
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
36 1 : 200
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
2.725 2.730 3.269 3.411 3.526 3.645 3.639 3.765 2.720 2.667 2.765 2.723 3.240 3.472 3.587 3.606 3.587 3.357 2.900
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 2.00 1.00 2.00 3.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 2.00 1.00 1.50 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 650 s/d 4 + 700
STA 4+710 STA 4+740
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
Muka aspal Eksisting
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
3.9 3.9
Muka jalan Eksisting
ELEVASI TOP BASE A 3.83 3.83 ELEVASI TOP BASE A 3.83 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55 CL
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH As Jalan Eksisting
2.903 2.775 3.393
3.509 3.667 3.723 3.675 3.677 3.255 3.068 3.508 3.643 3.746 3.750 3.522 3.295
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) JARAK (m) Tiang Listrik/ Lampu
0.50

3.00 1.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
Pohon
STA 4+720
STA 4+750
Jalan Rencana
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
2.627 2.631 3.275 3.528 3.693 3.763 3.768 3.631 3.360 3.008 3.435 3.582 3.676 3.722 3.861 3.558
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 2.00 1.00 1.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
STA 4+730
STA 4+760
CL CL
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
bidang persamaan bidang persamaan
reference level reference level
0.00 0.00
4.2 4.2
ELEVASI TOP RIGID 4.13 4.13 ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83 ELEVASI TOP BASE A 3.83 3.9 3.83
37 1 : 200
ELEVASI TOP SIRTU 3.55 3.62 3.55 ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH EL. TOP LANTAI UDITCH
2.940 3.093 3.811 3.740 3.813 3.771 3.760 3.237 3.398 3.392 3.485 3.650 3.648 3.640 3.628
ELEVASI EKSISTING ELEVASI EKSISTING
JARAK (m) 4.00 1.00 3.00 3.00 3.00 3.00 3.00 JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
POTONGAN MELINTANG
Sta 4 + 710 s/d 4 + 760
PEKERJAAN PENETRASI
PADA LOKASI GETOUT JALAN JETTY
EKS BUKIT SUNUR
Muka aspal Eksisting
Muka jalan Eksisting
CL
As Jalan Eksisting
Tiang Listrik/ Lampu
STA 4+760
Pohon
CL Beton K400 t = 30 cm
> AC - WC t = 4 cm
> AC - BC t = 5 cm
5.00 Base Coarse A t = Varies
> Beton K400 t = variasi
5.02%
4.00 3.5%
Jl. Rigid Eksisting Menuju DCK01 & Direksi Keet
3.00 3.89
10.00
2.00 Rencana Ramp
bidang persamaan
reference level
0.00
4.2
ELEVASI TOP RIGID 4.13 4.13
ELEVASI TOP BASE A 3.83 3.9 3.83
ELEVASI TOP SIRTU 3.55 3.62 3.55
EL. TOP LANTAI UDITCH
3.398 3.392 3.485 3.650 3.648 3.640 3.628
ELEVASI EKSISTING
JARAK (m) 3.00 3.00 3.00 3.00 3.00 3.00
38 1 : 150
POTONGAN MELINTANG
Sta 4 + 770 s/d 4 + 820

You might also like