You are on page 1of 105

Observatio

Date Employee Id Employee Name


n No

7/25/2022
52133 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

52728 4/8/2022 0:00 3601000000685 Nafiz Imtiaz Ahmed

9/15/2022
54162 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

55149 12/10/2022 0:00 3601000000685 Nafiz Imtiaz Ahmed

11/24/2022
57038 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM
58545 12/12/2022 0:00 3601000000685 Nafiz Imtiaz Ahmed

1/24/2023
59824 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

2/19/2023
60713 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

3/20/2023
61778 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

62788 11/4/2023 0:00 3601000000685 Nafiz Imtiaz Ahmed

63720 8/5/2023 0:00 3601000000685 Nafiz Imtiaz Ahmed

6/17/2023
64987 3601000000685 Nafiz Imtiaz Ahmed
12:00:00 AM

7/31/2022
52766 17020000005839 Md. Monjur Hossain
12:00:00 AM
4/30/2023
63537 17020000005839 Md. Monjur Hossain
12:00:00 AM

54901 3/10/2022 0:00 17020000006192 Kazi Saifur Rahman

56027 3/11/2022 0:00 17020000006192 Kazi Saifur Rahman

58388 5/12/2022 0:00 17020000006192 Kazi Saifur Rahman

59375 5/1/2023 0:00 17020000006192 Kazi Saifur Rahman

60263 2/2/2023 0:00 17020000006192 Kazi Saifur Rahman

61327 4/3/2023 0:00 17020000006192 Kazi Saifur Rahman

62570 4/4/2023 0:00 17020000006192 Kazi Saifur Rahman


63617 5/5/2023 0:00 17020000006192 Kazi Saifur Rahman

64675 5/6/2023 0:00 17020000006192 Kazi Saifur Rahman

11/24/2022
57027 17020000006923 Suruj Kanti Chowdhury
12:00:00 AM

11/26/2022
57206 17020000006923 Suruj Kanti Chowdhury
12:00:00 AM

58197 3/12/2022 0:00 17020000006923 Suruj Kanti Chowdhury

1/16/2023
59616 17020000006923 Suruj Kanti Chowdhury
12:00:00 AM

2/19/2023
60715 17020000006923 Suruj Kanti Chowdhury
12:00:00 AM

4/17/2023
62941 17020000006923 Suruj Kanti Chowdhury
12:00:00 AM
63733 8/5/2023 0:00 17020000006923 Suruj Kanti Chowdhury

63755 9/5/2023 0:00 17020000006923 Suruj Kanti Chowdhury

1/22/2023
59806 17020000008140 Amit Bhattacharjee
12:00:00 AM

2/18/2023
60745 17020000008140 Amit Bhattacharjee
12:00:00 AM

3/31/2023
62327 17020000008140 Amit Bhattacharjee
12:00:00 AM

4/27/2023
63259 17020000008140 Amit Bhattacharjee
12:00:00 AM

5/26/2023
64200 17020000008140 Amit Bhattacharjee
12:00:00 AM

6/19/2023
65202 17020000008140 Amit Bhattacharjee
12:00:00 AM
1/24/2023
59809 17020000008601 Ahmed Safat Jamil
12:00:00 AM

2/18/2023
60726 17020000008601 Ahmed Safat Jamil
12:00:00 AM

3/30/2023
62281 17020000008601 Ahmed Safat Jamil
12:00:00 AM

4/15/2023
62892 17020000008601 Ahmed Safat Jamil
12:00:00 AM

5/24/2023
64161 17020000008601 Ahmed Safat Jamil
12:00:00 AM

6/25/2023
65296 17020000008601 Ahmed Safat Jamil
12:00:00 AM

7/18/2022
51910 17020000009393 Sukanta Shekhar Paul
12:00:00 AM

8/16/2022
53010 17020000009393 Sukanta Shekhar Paul
12:00:00 AM
53984 6/9/2022 0:00 17020000009393 Sukanta Shekhar Paul

55065 6/10/2022 0:00 17020000009393 Sukanta Shekhar Paul

56058 3/11/2022 0:00 17020000009393 Sukanta Shekhar Paul

58514 8/12/2022 0:00 17020000009393 Sukanta Shekhar Paul

59456 5/1/2023 0:00 17020000009393 Sukanta Shekhar Paul

60463 3/2/2023 0:00 17020000009393 Sukanta Shekhar Paul

61614 12/3/2023 0:00 17020000009393 Sukanta Shekhar Paul

62792 9/4/2023 0:00 17020000009393 Sukanta Shekhar Paul


5/14/2023
63936 17020000009393 Sukanta Shekhar Paul
12:00:00 AM

64828 8/6/2023 0:00 17020000009393 Sukanta Shekhar Paul

7/31/2022
52487 17020000012966 Md. Morshed Alam
12:00:00 AM

8/21/2022
53152 17020000012966 Md. Morshed Alam
12:00:00 AM

9/24/2022
54380 17020000012966 Md. Morshed Alam
12:00:00 AM

10/19/2022
55346 17020000012966 Md. Morshed Alam
12:00:00 AM

11/23/2022
56947 17020000012966 Md. Morshed Alam
12:00:00 AM

12/17/2022
58649 17020000012966 Md. Morshed Alam
12:00:00 AM
7/16/2022
51945 17020000013775 Ariful Islam
12:00:00 AM

52765 5/8/2022 0:00 17020000013775 Ariful Islam

53843 5/9/2022 0:00 17020000013775 Ariful Islam

10/20/2022
55377 17020000013775 Ariful Islam
12:00:00 AM

11/14/2022
56409 17020000013775 Ariful Islam
12:00:00 AM

12/22/2022
58785 17020000013775 Ariful Islam
12:00:00 AM

1/23/2023
59945 17020000013775 Ariful Islam
12:00:00 AM

2/25/2023
61255 17020000013775 Ariful Islam
12:00:00 AM
61470 8/3/2023 0:00 17020000013775 Ariful Islam

62847 10/4/2023 0:00 17020000013775 Ariful Islam

5/18/2023
63993 17020000013775 Ariful Islam
12:00:00 AM

64820 10/6/2023 0:00 17020000013775 Ariful Islam

7/30/2022
52401 17020000013823 Mohammad Jahangir Alam
12:00:00 AM

52804 7/8/2022 0:00 17020000013823 Mohammad Jahangir Alam

9/21/2022
54307 17020000013823 Mohammad Jahangir Alam
12:00:00 AM

11/25/2022
57126 17020000013823 Mohammad Jahangir Alam
12:00:00 AM
12/17/2022
58628 17020000013823 Mohammad Jahangir Alam
12:00:00 AM

59405 6/1/2023 0:00 17020000013823 Mohammad Jahangir Alam

2/13/2023
60596 17020000013823 Mohammad Jahangir Alam
12:00:00 AM

61485 8/3/2023 0:00 17020000013823 Mohammad Jahangir Alam

62609 5/4/2023 0:00 17020000013823 Mohammad Jahangir Alam

5/20/2023
64064 17020000013823 Mohammad Jahangir Alam
12:00:00 AM

64712 6/6/2023 0:00 17020000013823 Mohammad Jahangir Alam

9/15/2022
54198 17020000013898 Shadman Aousaf Abir
12:00:00 AM
9/28/2022
54534 17020000013898 Shadman Aousaf Abir
12:00:00 AM

54938 4/10/2022 0:00 17020000013898 Shadman Aousaf Abir

11/21/2022
56981 17020000013898 Shadman Aousaf Abir
12:00:00 AM

12/17/2022
58666 17020000013898 Shadman Aousaf Abir
12:00:00 AM

1/22/2023
59763 17020000013898 Shadman Aousaf Abir
12:00:00 AM

2/27/2023
61037 17020000013898 Shadman Aousaf Abir
12:00:00 AM

3/24/2023
62219 17020000013898 Shadman Aousaf Abir
12:00:00 AM

62672 3/4/2023 0:00 17020000013898 Shadman Aousaf Abir


63736 7/5/2023 0:00 17020000013898 Shadman Aousaf Abir

64794 7/6/2023 0:00 17020000013898 Shadman Aousaf Abir

9/26/2022
54467 17020000013936 Priyadip Barua
12:00:00 AM

10/30/2022
56059 17020000013936 Priyadip Barua
12:00:00 AM

59507 11/1/2023 0:00 17020000013936 Priyadip Barua

60392 5/2/2023 0:00 17020000013936 Priyadip Barua

3/16/2023
61662 17020000013936 Priyadip Barua
12:00:00 AM

4/26/2023
63113 17020000013936 Priyadip Barua
12:00:00 AM
5/30/2023
64620 17020000013936 Priyadip Barua
12:00:00 AM

6/29/2023
65680 17020000013936 Priyadip Barua
12:00:00 AM

9/21/2022
54411 17020000014009 Masud Rana
12:00:00 AM

55172 11/10/2022 0:00 17020000014009 Masud Rana

11/19/2022
56874 17020000014009 Masud Rana
12:00:00 AM

12/26/2022
58886 17020000014009 Masud Rana
12:00:00 AM

1/29/2023
59982 17020000014009 Masud Rana
12:00:00 AM

2/27/2023
60977 17020000014009 Masud Rana
12:00:00 AM
3/25/2023
62083 17020000014009 Masud Rana
12:00:00 AM

5/17/2023
63970 17020000014009 Masud Rana
12:00:00 AM

6/21/2023
65341 17020000014009 Masud Rana
12:00:00 AM

9/25/2022
54427 17020000014010 Tusher Saha
12:00:00 AM

10/26/2022
55558 17020000014010 Tusher Saha
12:00:00 AM

11/22/2022
56878 17020000014010 Tusher Saha
12:00:00 AM

12/26/2022
58887 17020000014010 Tusher Saha
12:00:00 AM

1/26/2023
59890 17020000014010 Tusher Saha
12:00:00 AM
2/19/2023
60706 17020000014010 Tusher Saha
12:00:00 AM

3/22/2023
61843 17020000014010 Tusher Saha
12:00:00 AM

63574 4/5/2023 0:00 17020000014010 Tusher Saha

63575 4/5/2023 0:00 17020000014010 Tusher Saha

6/26/2023
65347 17020000014010 Tusher Saha
12:00:00 AM

10/31/2022
56092 17020000014081 Md. Salah Uddin
12:00:00 AM

11/27/2022
57340 17020000014081 Md. Salah Uddin
12:00:00 AM

12/29/2022
59003 17020000014081 Md. Salah Uddin
12:00:00 AM
1/29/2023
59989 17020000014081 Md. Salah Uddin
12:00:00 AM

2/28/2023
61235 17020000014081 Md. Salah Uddin
12:00:00 AM

4/29/2023
63606 17020000014081 Md. Salah Uddin
12:00:00 AM

5/31/2023
64665 17020000014081 Md. Salah Uddin
12:00:00 AM

6/26/2023
65363 17020000014081 Md. Salah Uddin
12:00:00 AM

2/25/2023
60895 17020000014136 Debraj Rakshit
12:00:00 AM

3/31/2023
62531 17020000014136 Debraj Rakshit
12:00:00 AM

4/24/2023
63072 17020000014136 Debraj Rakshit
12:00:00 AM
5/31/2023
64666 17020000014136 Debraj Rakshit
12:00:00 AM

1/31/2023
60389 17020000014189 Mujib Shaharear
12:00:00 AM

60387 5/2/2023 0:00 17020000014189 Mujib Shaharear

61399 5/3/2023 0:00 17020000014189 Mujib Shaharear

4/27/2023
63321 17020000014189 Mujib Shaharear
12:00:00 AM

5/23/2023
64263 17020000014189 Mujib Shaharear
12:00:00 AM

6/19/2023
65176 17020000014189 Mujib Shaharear
12:00:00 AM

1/17/2023
59669 17020000014190 Kamran Uddin Siddique
12:00:00 AM
60531 9/2/2023 0:00 17020000014190 Kamran Uddin Siddique

61542 9/3/2023 0:00 17020000014190 Kamran Uddin Siddique

61543 11/3/2023 0:00 17020000014190 Kamran Uddin Siddique

4/13/2023
62849 17020000014190 Kamran Uddin Siddique
12:00:00 AM

63826 11/5/2023 0:00 17020000014190 Kamran Uddin Siddique

64801 10/6/2023 0:00 17020000014190 Kamran Uddin Siddique

1/31/2023
60398 17020000014286 Md. Mahbubul Haque
12:00:00 AM

1/31/2023
60399 17020000014286 Md. Mahbubul Haque
12:00:00 AM
2/28/2023
61396 17020000014286 Md. Mahbubul Haque
12:00:00 AM

61249 2/3/2023 0:00 17020000014286 Md. Mahbubul Haque

4/29/2023
63586 17020000014286 Md. Mahbubul Haque
12:00:00 AM

63585 4/5/2023 0:00 17020000014286 Md. Mahbubul Haque


BSRM Steels (Rolling 2)
Yearly (July'22 to June'23) SOR
Designation Place Of Posting Department

Deputy Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Deputy Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Deputy Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)
BSRM Steels (Rolling- Maintenance
Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Manager Electrical
2) Factory (Electrical)

Material
Senior Executive Raw BSRM Steels (Rolling-
Management &
Materials & Store 2) Factory
Logistics
Material
Senior Executive Raw BSRM Steels (Rolling-
Management &
Materials & Store 2) Factory
Logistics

HR; HSE & Admin


Senior Executive HR; BSRM Steels (Rolling-
(HR; IR &
IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)
HR; HSE & Admin
Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

HR; HSE & Admin


Assistant Manager BSRM Steels (Rolling-
(HR; IR &
HR; IR & Compliance 2) Factory
Compliance)

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory
Senior Manager BSRM Steels (Rolling-
Maintenance
Maintenance 2) Factory

Senior Manager BSRM Steels (Rolling-


Maintenance
Maintenance 2) Factory

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)
Assistant Manager BSRM Steels (Rolling- Maintenance
Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)
Senior Engineer BSRM Steels (Rolling- Maintenance
Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)
Senior Engineer BSRM Steels (Rolling- Maintenance
Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)
Health; Safety &
Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)
Health; Safety &
Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Health; Safety &


Executive Health; BSRM Steels (Rolling-
Environment
Safety & Environment 2) Factory
(Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)
Assistant Executive BSRM Steels (Rolling- Administration
Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Security 2) Factory (Mirsharai)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)
BSRM Steels (Rolling- Maintenance
Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)
BSRM Steels (Rolling- Maintenance
Engineer Electrical
2) Factory (Electrical)

BSRM Steels (Rolling- Maintenance


Engineer Electrical
2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)
Senior Engineer BSRM Steels (Rolling- Maintenance
Electrical 2) Factory (Electrical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Electrical 2) Factory (Electrical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)
Assistant Manager BSRM Steels (Rolling- Maintenance
Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)
Assistant Manager BSRM Steels (Rolling- Maintenance
Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Manager BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)
BSRM Steels (Rolling- Maintenance
Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling- Maintenance


Engineer Mechanical
2) Factory (Mechanical)

BSRM Steels (Rolling-


Technical Analyst Plant Operation
2) Factory

BSRM Steels (Rolling-


Technical Analyst Plant Operation
2) Factory

BSRM Steels (Rolling-


Technical Analyst Plant Operation
2) Factory
BSRM Steels (Rolling-
Technical Analyst Plant Operation
2) Factory

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)
Senior Engineer BSRM Steels (Rolling- Maintenance
Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Senior Engineer BSRM Steels (Rolling- Maintenance


Mechanical 2) Factory (Mechanical)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)
Assistant Executive BSRM Steels (Rolling- Administration
Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)

Assistant Executive BSRM Steels (Rolling- Administration


Facilities Services 2) Factory (Mirsharai)
BSRM Steels (Rolling 2) Limited
Yearly (July'22 to June'23) SOR Report
Description Recommendation

In Finishing Area KAE DB Panel All Circuit breaker power


Power should be looped by
looped by short link cable; which may causes loose connection
Bus bar.
as a result fire/flashing may occurred

Light Power cable of Snigdha Engineering fall down over the Cable should be laid by
walkway which may causes electrification proper channel/tray

Cable hanged in T Line Column-06 to S Line which may occur Need to shift the cable in
accident during heavy crane movement proper channel/Tray

Forklift operated (BSF Contractor) without reverse horn during Every construction vehicle
Sinoko Crane material unloading from container which may should have horn in reverse
cause accident. operation

Currently Stair of T-U Bay crane located in U line-Column 21


Need to fabricate Stair in U
which is far away from exact crane location Column-07. Some
Line between Column-11 &
places of crane platform from C-21 to C-07 life line is also
12 in prior attention.
missing.
In R-S Bay Crane girder Bee nest formed & then can sting
Need to remove/clear bee nest
human body; which may cause major health issues

Need to barricade with


ECR Building 1st floor Cut out has been seen without any
something for avoiding fall
temporary fencing which may cause fall down from 5 mtr level
down

Ladder Step missing in Cooling bed area which occur near miss Need to fixed every step of
accident ladder.

Rain Water entered inside ECR building 0.00 Mtr & 5 .00 Mtr Need to arrest all possible
level which causes slip hazard entrance point of water

Need to arranged the brick in


In front of ECR Transformer room walkway lot of bricks placed proper way so that enough
which may cause slip/trip space will be available for
walkway

HMD Box Support has not fixed properly as a result this heavy Need to fixed support so that
structure fall down which may cause serious injury. no any near miss will happen

Need to provide caution sign


for restricting human
Piping Welding work carried br Sorowar brother's from 9 mtr
movement otherwise welding
level where no any caution provided in 0 mtr level.
material fall from 9 mtr which
may occurred accident.

Plant internal roads are broken due to heavy rain. When rain is
continuing; the holes in the road are submerged in water; so that
Need to repair immediately.
nothing can be understood from above. So anytime accident cab
be happen.
Labor is working in the hole without using area caution tape. An Must be restricted working
accident will happen at any time. area by using caution tape.

Every individual should wear


Cup Brushing without Safety Googles and Face Shield. safety PPE while working
such hazardous work place.

Not wear safety shield and sun glass while doing wielding Need to wear PPE as a part of
works. Safety observation.

Always wear safety belt and


Working at height without safety belt.Location: RS Bay Line. harness while working on
height

Need to wear safety face


Welding works without a face shield. shield while doing any
welding works.

Unsafe act: Working at height without safety belt.Location: Cut


Need to wear safety belt
to length area

Need to wear safety belt or


Without safety belt worked in the height
harness

Need to wear safety belt /


harness while working at the
height area. 4 Contructore
Working at height ; there was no safety belt / harness working
person worked over there 3 of
for civil works at ECR building area ( Rolling 2 site)
them wear the same but 1
worker won’t wear in
view of safety measures .
Need to wear safety gloves
Welding work without Hand Gloves
while doing Weilding

Always wear safety helmet


Working at Rolling 2 project site without wearing safety helmet. as a part of PPE at
project/factory premises.

Heavy weight lifting by


Fabrication Yard lack of lifting facility may call back injury
Human precaution to be
though using crane for heavy weight
followed

Instructed to weld or tie to


Temporary walking stair found risky position in narrow support
protect slip

Instructed to install back the


Safety Railing removed by contractor to remove the shuttering railing soonest ; they
committed ; under followup .

Shutter hanging dangerously overhead ; may fall down any time. To be removed immediately

To put the railing


Stair missing the railing ; may call serious accident
immediately

Should remove the rod ; no


Loose Rod hanging on WTP cooling tower wall ; may fall down
such hanging material should
any time .
be allowed .
Stair temporary step with sand bag is slippery may cause trip
Should be plain step
accident

Throwing debris from Mill floor to zero level without any


Must be barricaded
barricade in zero level.

Earthing cable Insulation damage of SDB-2 happened during


Need to be repaired
excavation work.

The SDB of Sarwar and Brothers has not been made according An accident may happen due
to electrical standard. to this kind of panel.

Fakhri and Sons (Contractor) is doing hot work above cable and it may injure any person
pipe trestle with any safety caution. while walking nearby

Floor Excavation has been done at the entrance of ECR


There must be a safety
Building. But no safety caution signages or barricade is not
barricade or caution signage
available at the site. In that case anyone can fall in the hole while
around the excavated area.
walking nearby.

Electrical devices should not


Circuit Breaker found on wet floor at WTP ECR room. wet
be kept on wet floor as this
electrical device can cause short circuit.
may cause an accident.

They must have to provide


Contractor SNIGDHA is doing welding on shed beam without safety caution tape
providing caution tape guard. surrounding the area of
welding.
Need to complete one line at a
Rolling -2 Factory U bay stairs railing is incomplete in many
time rather than starting all
locations. Contractor Snigdha's work completion process is
lines railing work at the
discreet.Not even a single line found complete.
sametime

Contractor DB wiring found noncompliance. Wiring standard is


Must maintain standard panel
not maintained properly

Must use caution tape


Fakri and sons contractor working at pipeline at wtp area on
underneath the pipe trestle are
pipe trestle with out barricading the are.
for safety

While doing work at ecr transformer room 9 number of rod fall


from 20 feet height while lifting with rooftop crane (Contractor
Must use caution tape
PRANAYAN)of ecr building. People could have died as there
were no caution tape providing boundary to that work place.

Plating condition is very bad that has been placed to cross the
Must use strong plating.
drain in between steels 2 mrss and rolling -2 road .

Contractor person is working without PPE. Must use PPE

Contractor People was welding without PPE at Cooling Bed


Need to use PPE
side.

Contractor People was welding without PPE at Roughing Mill


Need to use PPE
Area.
Contractor People was welding without PPE at WTP side area. Need to use PPE.

Contractor People was welding without PPE at Finishing Mill


Need to use PPE
Area.

Contractor People was welding without PPE at ECR building


Need to use PPE.
area.

Contractor People was welding without PPE at Workshop area. Need to use PPE.

Contractor People was welding without PPE under Cold Shear


Need to use PPE.
area.

Contractor People was welding without PPE at WRM (Wire


Need to use PPE.
Rod Mill) area.

Contractor People was welding without PPE at Furnace entry Need to use PPE during
area. Welding work.

Need to wear Safety Face


Contactor person was welding a material without Safety Face
Shield properly during
Shield at Coil Handling System (Unloading Station).
welding work.
Need to wear Safety Face
Contactor person was welding a material without Safety Face
Shield properly during
Shield at Reheating Furnace Area.
welding work.

Need to wear Safety Face


Contactor person was welding a material without Safety Face
Shield properly during
Shield at DG Compressor Room Area.
welding work.

A Korban Ali contractors welder is welding without safety Told him to put on safety
helmet helmet when welding

Must be wear in safety


SSE worker walking in project site without helmet & safety
protection while work in
shoe.
project site area.

Mofazzal Hossain; I/d no-531; korban Ali contructor labour is To maintain 100% safety in
working project site without helmet. project site.

An AK Contractor's worker is working without helmet & safety Worker must wear helmet &
shoe safety shoe during working

Maintain 100% safety in


I/D No-1058; Rahamat; pronayan contructor labor was found
project site and fine to said
without proper safety while worked in rolling-2 project site.
contractor.

Recommend to disciplinary
A korban Ali contractor helper Mokter Ali; I/D no-409; found
action against him as per
rod cutting work without measure appropriate safety.
safety rules.
use proper PPE during hot
Grinding Work without hand gloves
work

Doing hot work without proper PPE ( Hand gloves; Full sleeve Proper PPE should be used
shirt. Welding shield ) for hot work

Use proper good quality


A non-management employee of rolling 2 unit were Working safety shoes . warrior; a brand
wearing torn safety shoes. name of a shoe company; will
be the good choice.

Use proper PPE during hot


Cup Brushing without hand gloves work. e.g. Welding; grinding;
gas cutting; cup brushing)

should use proper PPE during


Welding work without face shield and hand gloves
welding work.

Proper PPE should be


Grinding work without face shield.
maintained during hot work.

Need to take proper safety


Working at height without safety belt precautions for working at
height.

Wearing hard hat without chin strap Need to use chin strap
Oxygen cylinder is not tied Cylinder need to keep tied

need to use safety belt while


Working at height without safety belt
working at height

Using broken helmet that is covered with tape Need to use proper helmet

Should be increased
Contractor people using Smartphones at the project site monitoring by the security
department at the entry gate

He is asked to wear safety


SSE Contractor labor working without safety helmet.
helmet when working.

A worker from SSE contractors was rod binding without safety Told him to put on helmet &
helmet & hand gloves. gloves immediately.

Warned him & told him to put


A korban Ali contractors worker is working without helmet
on safety helmet.

Told him to put on safety


A SSE contractors worker is working without helmet
helmet immediately
Warn & told him to put on
An SSE worker is working without helmet
helmet

Told him to put on helmet


An SSE worker is Working height without safety helmet
immediately

Told him to put on safety


A korban Ali contractor's worker is working without helmet.
helmet

An SSE worker is working at height without safety belt & Told him to put on helmet &
Helmet Belt

Told him to put on safety


A korban Ali contractors worker is working without helmet
hemet

A korban Ali contractors worker is working without helmet in Told him to put on helmet
roughing mill area immediately

An SSE welder is welding without safety goggles Advice him to put on goggles

The power source needs to be


shut down and use the small
Electrical Cables laying under water height poll for safety so that
the cable will not touch the
water level.
Always needs to wear rubber
During electrical wiring work from Electrical team technician;
hand gloves during electrical
no rubber gloves used.
wiring work

All cables should be


The main breaker cable has been found with a 415V power
connected properly with the
supply at the outside of Korban Ali DB.
tightening condition.

Water split from ECR 1st floor to 150 W flood light which is The flood light needs to move
installed at ground floor ceiling. under a closed ceiling.

Bee foundation at RM2 west side R-S bay crane 108 electric Use chemicals spray for clear
cabin. the area

SDB 2 earthing cable insulation damaged during excavation Need to repair with proper
work insulation.

Contractor Sorowar Brothers doing Hot work without wearing


Wearing hand gloves; face
hand gloves; face shield; glasses at Roughing mill area zero
shield; glasses
meter level

Good condition breaker


Cable burnt due to damaged breaker
should be use

Need to clear the area to


Korban Ali put the Bar in walking way at RM-2 west side T-U
prevent any accident with
bay.
unconscious mind.
To prevent near miss and
unsafe condition always
No caution tape use at the excavation area.
needs to use caution tape at
working area.

Always need to use face


No face shield use during welding (Hot work)
shield during hot work.

Cable needs to be dressed


Power Distribution Box cables are unorganized and can cause
perfectly using cable tray or
accident( electric shock) due to damaged insulation.
conduit.

They should use proper PPE


Contractor people is doing welding; grinding without proper
(welding suite; welding
PPE
helmet)

Need to place ladder with


Ladder is risky. It is not maintaining standard.
proper safety.

Scrap rebar; sheets are kept in front of Rolling mill transformer


Need to remove
room. Anybody can trip for these scraps.

Need to repair the cable


Power socket cable insulation damaged and also the socket laid
insulation and fix the socket
on the floor.So; there is risk of electrocution
at certain height

This rod bundle should be


tied strongly. During lifting
Bundle of rod fell from ECR roof in front of Transformer room.
this bundle no people should
At that time contractor peoples & engineers were working.
be under this area. Concerned
There was heavy chance of major injury.
team should inform others
before the work.
Need barricade around this
Coil conveyor area has huge cut out. Sideways are open. cut out. Also sideways
handrail should be given.

Need to hang the cable on the


Cable is laid on the floor.
top by support

Lifting belt position should be


Improper lifting belt positioned during EOT Crane box in proper way so that box
unloading period by BSF Contractor. remain at balanced & safe
condition.

Gas cutting work at T-Grid line by Snigdha team without taking


Crane girder covering by
Proper safety precaution on the Crane girder which kept under
sheet.
the structure.

T-U Bay Magnet Crane girder lifting time under the Mobile I told BSF team to put bigger
Crane outrigger no long wood/plate was found that's why it size square plate under the
could be down. Mobile crane outrigger.

Found 2nos. vertical rebar on the 5mtr. level floor at Rolling Both Rebar cutting done by
bay. KAEW

I instructed must be wear


Welding without Welding Hand Screen Welding Hand Screen during
Welding Period

Workshop area shuttering sheet under workshop +5mtr. floor


Taken out this hanging sheet
was hanging condition
Furnace exit area there have a cut out in 5 mtr. level but not
covered by Checkered plate
cover

R-S bay Cold shear area +5.00 mtr. level civil floor cut out Covered by putting checkered
found but no safety precaution have been taken. plate.

During cooling bed movable rack assembly near cold shear area I told them to fix hand rail for
there was a big cut out but one side hand rail found missing. safety purpose and done it.

Should move gas cylinder in


moving gas cylinder through unsafe act trolley by tying properly with
chain

Outrigger plate should be


Outrigger plate was fixed on a damaged wooden platform fixed on long good quality
wooden platform

Cold shear chute area was uncovered at +4 mtr Hight. Which Need to cover the area with
might cause fall from Hight. railing .

Must not throw away from 5


Broken bricks throw away from 5 mtr level of ECR building mtr level and if throw away
with out barricading the area. must be barricade the area
with caution tape

Need to fixed on plane


Scaffolding is placed on vulnerable surface and found inclined.
surface and position must be
Just by a rope it is unsafely tied. working unsafely.
vertical
Must use plate under cutting
Gas cutting work without maintaining safety rules
place and fire watcher

Need to use safety googles or


Grinding work with out safety googles or shields
shields

Temporarily caution tape


Main pulpit one side no railing or caution tape found. fixed. By glass it will be
permanent fixed soon.

put a sheet under welding


welding pipe support beside ECR building point so that fire not come at
ECR room.

Working without PPE (Safety helmet) Told them to use proper PPE.

Korban Ali contractor people working on top of drain hole; they Made arrangement of proper
covered hole with thin sheet without proper support below sheet. support for hole covering

I ensured him to wearing


A worker of contractor(Snigdha) working at QR bay without
safety helmet while working
safety helmet.
on site.

Ensured using safety hand


Contractor welder doing welding without safety hand shield
shield while doing welding
I asked them to fixed that
Contractor people using a ladder which is not matched with our
ladder at top & bottom side
safety standard
and add hand rail too

Contractor people (N Islam) working at height without proper Need proper scaffolding when
scaffolding working at height.

One of contractor worker working without safety helmet Need to use safety helmet

One of contractor people (Sorwar and brothers) working without Need to wear safety helmet
safety helmet during working

It is recommended to cover
Contractor (Sorwar & Brothers) welder doing welding at height
motor and pump while doing
(straight top of the pump and motor); but they did not covered
welding nearby or top of the
motor and pump to prevent damages from hot welding slug
motor or pump

Marked portion needs to be


Stair is unsafe. fixed with floor or proper
support.

Rebar Not Dismantled after work. Might cause injury while Need to remove it for safety
passing by the road. purposes.

Need to remove it
Rebar placed in inclined position in walkway to support a
immediately & shift to other
platform . People might get tripped over it.
place other then walkway.
Cable Insulation should be
under checking always & any
Cable caught Fire in the working area. wear & tear should be
informed to concerned
authority.

N Islam Contractor Worker Working on Height Without Safety Told him always wear safety
Belt belt when working on height.

Told him to wear helmet


SSE Contractor Worker Working Without Safety Helmet
during working on site.

SSE Contractor Civil Worker Working in Height Without Safety Told him to wear/ use PPE
Belt when working in height

Korban Ali Contractor Surveyor Working Without Safety


Told him to wear PPE's
Helmet

SSE Contractor worker working without safety helmet at wire


Suggest them to wear PPE
rod mill area

Told them to marking by


STB Contractor Worker Welding at Height Without Groundside
caution tape when this types
Marking (No Caution Tape at Ground Floor)
of work.

Contactor person was welding a material without face shield at Need to wear safety face
fabrication yard. shield properly.
Need to remove the
One ladder kept to climb on sludge thickener top; there is no
scaffolding pipe ; also need to
handrail ; moreover there was a scaffolding pipe support which
provide handrail properly to
causes also a barrier.
climb

Contactor guys are working under cooling bed using scaffolder


Need to weld channel support
but there are no safe channel under the base; this is risky; it may
under the base.
sometimes go down & fallen from that support

This bulldozer tried to go by this narrow space & hit the There are another ways to
structure column. enter in this area at west side.

For lifting rebars at a height ;


Rebars fallen from ECR top floor suddenly; all were working & caution tape should be there;
walking under this area. that area or particular place
need to be isolated.

There are no railing but three people staying on the edge of the Need to tie caution tape or
roof without any support install temporary support .

There should be caution tape


Excavation area is not cautioned; done by SSE
all around that area.

Working with torn safety shoe Need to use proper PPE

Working with torn safety shoe Need to use proper PPE


Work at height without safety belt Need to ware Safety belt.

Work at height without safety belt Must use safety belt

Work at height without climbing Ensure Safety

Work at height without safety belt Ensure the safety belt


Responsible
Location Type Status Deadline Place Of
Posting

Finishing Area BSRM Steels


Korbal Ali Unsafe Condition Close 7 days (Rolling-2)
Engineering DB Factory

BSRM Steels
Just beside U line Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
S-T Bay Column-
Unsafe Condition Close Immediate (Rolling-2)
06
Factory

BSRM Steels
S-T Bay Rolling-
Unsafe Act (Rolling-2)
02
Factory

T-U Bay U Line BSRM Steels


Crane platform Unsafe Condition Close 15 days (Rolling-2)
area Factory
BSRM Steels
R-S Bay Crane-
Unsafe Condition Close Immediate (Rolling-2)
108 (West Side)
Factory

BSRM Steels
ECR building 1 st
Unsafe Condition Close Immediate (Rolling-2)
Floor east side
Factory

BSRM Steels
Cooling Bed Area Near Miss Immediate (Rolling-2)
Factory

BSRM Steels
ECR building Unsafe Condition Open 7 days (Rolling-2)
Factory

BSRM Steels
ECR Room
Unsafe Condition Close Immediate (Rolling-2)
Transformer Area
Factory

BSRM Steels
Rolling-02
Near Miss Immediate (Rolling-2)
Ground level
Factory

BSRM Steels
WTP Pump house Near Miss Immediate (Rolling-2)
Factory

SML plant outside


BSRM Steels
road(near
Unsafe Condition Open Immediate (Rolling-2)
radiation weigh
Factory
scale)
Rolling BSRM Steels
Project(Workshop Unsafe Condition Open Immediate (Rolling-2)
area) Factory

Adjacent of ECR BSRM Steels


Building (new Unsafe Act (Rolling-2)
Rolling 2 project). Factory

New Rolling 2 BSRM Steels


project (ECR Unsafe Act (Rolling-2)
building area) Factory

BSRM Steels
Rolling 2 RS Bay
Unsafe Act (Rolling-2)
area
Factory

Cut to length area BSRM Steels


Rolling 2 project Unsafe Act (Rolling-2)
site. Factory

Cut to length
BSRM Steels
area ; ECR
Unsafe Act (Rolling-2)
building ( Rolling
Factory
2)

BSRM Steels
Rolling 2 ECR
Unsafe Act (Rolling-2)
building
Factory

ECR building BSRM Steels


construction site Unsafe Act (Rolling-2)
civil works Factory
BSRM Steels
ECR building
Unsafe Act (Rolling-2)
Rolling project
Factory

BSRM Steels
Rolling 2 ECR
Unsafe Act (Rolling-2)
building
Factory

BSRM Steels
Fabrication yard Unsafe Act (Rolling-2)
Factory

BSRM Steels
ECR GF Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
+5 meter level
Unsafe Condition Close Immediate (Rolling-2)
RM+IM+FM area
Factory

Under +5 meter BSRM Steels


level in finishing Unsafe Condition Close Immediate (Rolling-2)
mill area Factory

BSRM Steels
Cooling bed exit
Unsafe Condition Close 7 days (Rolling-2)
area
Factory

BSRM Steels
WTP Cooling
Unsafe Condition Close Immediate (Rolling-2)
Tower wall
Factory
BSRM Steels
Bundle evacuation
Unsafe Condition Close 7 days (Rolling-2)
area
Factory

BSRM Steels
Mail pulpit area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Rolling Mill-2
Unsafe Condition Close Immediate (Rolling-2)
(West side)
Factory

BSRM Steels
ST Bay (East
Unsafe Condition Close Immediate (Rolling-2)
Side)
Factory

BSRM Steels
WTP Area Unsafe Act (Rolling-2)
Factory

Entrance point of BSRM Steels


ECR Room. (West Unsafe Condition Close 7 days (Rolling-2)
Side) Factory

BSRM Steels
WTP Area (ECR
Unsafe Condition Close Immediate (Rolling-2)
Room)
Factory

BSRM Steels
Mill Floor (RS
Unsafe Act (Rolling-2)
BAY)
Factory
BSRM Steels
Rolling 2 project
Unsafe Condition Open 15 days (Rolling-2)
U line bay stair
Factory

BSRM Steels
Rolling -2 RS Unsafe Act (Rolling-2)
Factory

BSRM Steels
Rolling -2 project
Unsafe Act (Rolling-2)
wtp area
Factory

BSRM Steels
Ecr transformer
Near Miss (Rolling-2)
room 10
Factory

BSRM Steels
Steesl 2 mrss to
Unsafe Condition Close 7 days (Rolling-2)
Rolling-2 road.
Factory

BSRM Steels
Rolling mill floor Unsafe Act (Rolling-2)
Factory

BSRM Steels
Cooling Bed Area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Roughing Mill
Unsafe Act (Rolling-2)
Area
Factory
BSRM Steels
WTP Side Area. Unsafe Act (Rolling-2)
Factory

BSRM Steels
Finishing Mill
Unsafe Act (Rolling-2)
Area
Factory

BSRM Steels
ECR Building
Unsafe Act (Rolling-2)
Area.
Factory

BSRM Steels
Workshop area
Unsafe Act (Rolling-2)
(Q-R bay)
Factory

BSRM Steels
Under Cold Shear
Unsafe Act (Rolling-2)
area.
Factory

BSRM Steels
WRM (Wire Rod
Unsafe Act (Rolling-2)
Mill) area.
Factory

BSRM Steels
Furnace Entry
Unsafe Act (Rolling-2)
Area.
Factory

Coil Handling
BSRM Steels
System
Unsafe Act (Rolling-2)
(Unloading
Factory
Station).
BSRM Steels
Reheating Furnace
Unsafe Act (Rolling-2)
Area.
Factory

BSRM Steels
DG Compressor
Unsafe Act (Rolling-2)
Room Area
Factory

Korban Ali
BSRM Steels
Construction Site
Unsafe Act (Rolling-2)
on Rolling
Factory
Project-2

BSRM Steels
BSRM Rolling-2
Unsafe Act (Rolling-2)
project site area.
Factory

BSRM Steels
Rolling project;
Unsafe Act (Rolling-2)
korban Ali site
Factory

Cooling Bed BSRM Steels


constracting area Unsafe Act (Rolling-2)
of AK contractors Factory

BSRM Steels
BSRM Rolling-2
Unsafe Act (Rolling-2)
project
Factory

BSRM Steels
Rolling-2 project;
Unsafe Act (Rolling-2)
korban Ali site.
Factory
BSRM Steels
Roughing mill
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Cooling bed area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Rolling 2 project
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Cooling bed area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Beside cooling
Unsafe Act (Rolling-2)
bed area
Factory

Workshop area BSRM Steels


( Rolling 2 Unsafe Act (Rolling-2)
project) Factory

BSRM Steels
Roof top of Pump
Unsafe Act (Rolling-2)
house; Rolling 2
Factory

BSRM Steels
Rolling 2 project
Unsafe Act (Rolling-2)
area
Factory
BSRM Steels
Wire Rod mill
Unsafe Condition Close Immediate (Rolling-2)
area
Factory

BSRM Steels
Exit mill area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Rolling 2 project
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Rolling 2 project
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Rolling Project -
Unsafe Condition Close Immediate (Rolling-2)
SSE Site.
Factory

Pump house
BSRM Steels
construction site
Unsafe Act (Rolling-2)
of Rolling -2
Factory
project

Roughing Mill
BSRM Steels
Area - korban ali
Unsafe Act (Rolling-2)
contractors work
Factory
place

BSRM Steels
SSE Work site Unsafe Act (Rolling-2)
Factory
BSRM Steels
Pump
Unsafe Act (Rolling-2)
House;Rolling-2
Factory

BSRM Steels
Pump House
Unsafe Act (Rolling-2)
Construction Site
Factory

BSRM Steels
Roughing Mill
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Pump House
Unsafe Act (Rolling-2)
Rolling-2
Factory

BSRM Steels
Roughing mill
Unsafe Act (Rolling-2)
area
Factory

BSRM Steels
Roughing Mill
Unsafe Act (Rolling-2)
Area Rolling-2
Factory

Editing Furnace BSRM Steels


Area at Rolling -2 Unsafe Act (Rolling-2)
Project Factory

In front Korban
BSRM Steels
Ali Container at
Unsafe Condition Close Immediate (Rolling-2)
RM-2 Site (South
Factory
side)
BSRM Steels
CMDB at North
Unsafe Act (Rolling-2)
side of RM-2
Factory

In front of
Roughing Mill BSRM Steels
area at RM-2 Site Unsafe Condition Close Immediate (Rolling-2)
(S Bay 3rd Factory
Column)

BSRM Steels
ECR ground floor Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
R-S bay west side Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
RM-2 Site (West
Unsafe Condition Close Immediate (Rolling-2)
side)
Factory

R-S bay Roughing BSRM Steels


mill area 0 meter Unsafe Act (Rolling-2)
level Factory

RM-2 Site BSRM Steels


CMDB (North Unsafe Condition Close 7 days (Rolling-2)
side) Factory

BSRM Steels
RM-2 Site (West
Unsafe Condition Close Immediate (Rolling-2)
side)
Factory
BSRM Steels
RM-2 Site (S-T
Unsafe Condition Close Immediate (Rolling-2)
Bay) 12th column
Factory

Roughing mill R- BSRM Steels


S bay 4-5 Column Unsafe Act (Rolling-2)
at STD 4 Factory

BSRM Steels
Rolling Mill 2 RS
Unsafe Condition Close 7 days (Rolling-2)
Bay R line.
Factory

Rolling Mill -2 BSRM Steels


Mill Bay; WTP Unsafe Act (Rolling-2)
area Factory

BSRM Steels
Cooling bed Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
ECR Transformer Unsafe Condition Close 15 days (Rolling-2)
Factory

BSRM Steels
Cut to length Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
ECR Transformer
Near Miss Immediate (Rolling-2)
room
Factory
BSRM Steels
Coil conveyor
Unsafe Condition Follow Up 7 days (Rolling-2)
area
Factory

Roughing; BSRM Steels


Intermediate; Unsafe Condition Follow Up 7 days (Rolling-2)
Finishing Area Factory

R-S bay West


BSRM Steels
Side during EOT
Unsafe Act (Rolling-2)
Crane materials
Factory
unloading.

BSRM Steels
Rolling-2 T-U
Unsafe Act (Rolling-2)
Bay
Factory

BSRM Steels
T-U Bay of
Unsafe Act (Rolling-2)
Rolling-2
Factory

R-S Bay 5mtr. BSRM Steels


level floor beahind Unsafe Condition Close Immediate (Rolling-2)
stand no.14 Factory

BSRM Steels
Cut to Length
Unsafe Act (Rolling-2)
Area
Factory

BSRM Steels
Workshop Area Unsafe Condition Close Immediate (Rolling-2)
Factory
BSRM Steels
R-S bay furnace
Unsafe Condition Close Immediate (Rolling-2)
exit area
Factory

BSRM Steels
R-S Bay near cold
Unsafe Condition Close Immediate (Rolling-2)
shear
Factory

BSRM Steels
Exit rolling Mill Unsafe Condition Close Immediate (Rolling-2)
Factory

ground floor of S-
BSRM Steels
T bay area at
Unsafe Act (Rolling-2)
BSRM rolling 2
Factory
factory

Cooling bed end BSRM Steels


area of BSRM Unsafe Act (Rolling-2)
Steels (rolling 2) Factory

BSRM Steels BSRM Steels


rolling-2 cooling Unsafe Condition Close 7 days (Rolling-2)
bed area Factory

beside ECR
BSRM Steels
building of BSRM
Unsafe Act (Rolling-2)
Rolling-2 factory
Factory
area

ground floor of S-
BSRM Steels
T bay area at
Unsafe Act (Rolling-2)
BSRM rolling 2
Factory
factory
BSRM Steels
ST Bay column
Unsafe Act (Rolling-2)
no-13; (s-grid)
Factory

BSRM Steels
Cooling tower of
Unsafe Act (Rolling-2)
WTP
Factory

BSRM Steels
Finishing mill of
Unsafe Condition Close Immediate (Rolling-2)
Rolling-2
Factory

Main ECR BSRM Steels


building area of Unsafe Act (Rolling-2)
RM-2 Factory

BSRM Steels
HT Pole of
Unsafe Act (Rolling-2)
Rolling-02.
Factory

BSRM Steels
Intermediate Mill
Unsafe Condition Close Immediate (Rolling-2)
Area; RS bay
Factory

BSRM Steels
QR bay near
Unsafe Act (Rolling-2)
22/23 columns
Factory

BSRM Steels
RS bay; Mill exit
Unsafe Act (Rolling-2)
area
Factory
BSRM Steels
WTP scale pit Unsafe Condition Close Immediate (Rolling-2)
Factory

BSRM Steels
Furnace entry
Unsafe Condition Close Immediate (Rolling-2)
area; Rolling-2
Factory

BSRM Steels
Mill area Unsafe Act (Rolling-2)
Factory

BSRM Steels
Pump house
Unsafe Act (Rolling-2)
(WTP)
Factory

BSRM Steels
Pump house
Unsafe Act (Rolling-2)
(WTP)
Factory

BSRM Steels
Clarifier tank Unsafe Condition Open 15 days (Rolling-2)
Factory

BSRM Steels
U line-13 &14
Unsafe Condition Follow Up 7 days (Rolling-2)
Column
Factory

BSRM Steels
Beside QTB Unsafe Condition Follow Up 7 days (Rolling-2)
Factory
Wire Rod Line- BSRM Steels
Between column Unsafe Condition Close Immediate (Rolling-2)
13 & 14 Factory

Workshop Area BSRM Steels


(Rolling-02 Unsafe Act (Rolling-2)
Project) Factory

BSRM Steels
Beside WTP of
Unsafe Act (Rolling-2)
Rolling-02 Project
Factory

Rolling-02
BSRM Steels
Project- Wire Mill
Unsafe Act (Rolling-2)
Area (Beside
Factory
Cooling Bed)

BSRM Steels BSRM Steels


Limited Rolling- Unsafe Act (Rolling-2)
02 Project Factory

BSRM Steels
BSRM Steels
Limited Rolling-
Unsafe Act (Rolling-2)
02 Project (Wire
Factory
Rod Mill Area)

BSRM Steels
Rolling-02 Mill
Unsafe Act (Rolling-2)
Floor Area
Factory

BSRM Steels
Local Fabrication
Unsafe Act (Rolling-2)
Yard
Factory
BSRM Steels
Sludge thickener
Unsafe Act (Rolling-2)
area near WTP
Factory

BSRM Steels
Under cooling bed
Unsafe Act (Rolling-2)
north side
Factory

Near QTB area at BSRM Steels


Sline 14 no Unsafe Act (Rolling-2)
column. Factory

BSRM Steels
ECR north side Near Miss Immediate (Rolling-2)
Factory

BSRM Steels
Top floor of ECR
Unsafe Act (Rolling-2)
building
Factory

BSRM Steels
Q-R Bay east side Unsafe Act (Rolling-2)
Factory

BSRM Steels
Cut to length area;
Unsafe Act (Rolling-2)
Rolling 2
Factory

BSRM Steels
Cut to length
Unsafe Act (Rolling-2)
area ; Rolling 2
Factory
BSRM Steels
WTP rolling 2 Unsafe Act (Rolling-2)
Factory

BSRM Steels
Workshop area
Unsafe Act (Rolling-2)
Rolling 2
Factory

BSRM Steels
Rolling 2
Unsafe Act (Rolling-2)
roughing mill area
Factory

BSRM Steels
Rolling 2 ECR
Unsafe Act (Rolling-2)
area
Factory
Responsible
Remarks
Department

Electrical, SP

Electrical, SP

Maintenance
(Electrical)

Mechanical, SP

Mechanical, SP
Administration
(Mirsharai)

Civil

Mechanical, SP

Civil Pronoion Contractor

Contractor-
Civil
Pranayan

Maintenance
(Electrical)

Sorowar Brother's
Maintenance
(Mechanical Piping
(Mechanical)
Contractor)

Administration
(Mirsharai)
Civil

Civil

Contractor Name:
Pronayan
Civil
Development
services.

Need to wear safety


Maintenance
belt while working
(Mechanical)
on high
Please advise the
concerned Dept. to
talk with the third
Maintenance party about the
(Mechanical) unsafe act of Need
to wear safety face
shield while doing
any welding works.
Maintenance PPE checklist for
(Mechanical) work order

Maintenance
(Mechanical)

Civil Dept
Civil
( Strategic Project)
Maintenance
Always wear PPE
(Electrical)

Material
Management &
Logistics

Contractor Fokri and


Mechanical, SP
Son's

Civil

Instructed to install
back the railing
Civil soonest ; they
committed ; under
followup .

Civil Inform to civil team

Mechanical, SP

Removed the ROD


Civil
immediately
Civil Civil

Civil

Maintenance
(Electrical)

Maintenance
(Electrical)

immediately told
Mechanical, SP them to place
caution signages

Civil

Maintenance
(Electrical)

Mechanical, SP
Mechanical, SP

Maintenance
(Mechanical)

Has been corrected


Maintenance
and caution tape has
(Mechanical)
been provided

Civil

Civil

Maintenance
(Mechanical)

Administration
(Mirsharai)

Administration
(Mirsharai)
Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Mechanical, SP
Mechanical, SP

Mechanical, SP

Administration
(Mirsharai)

Aware to worker &


site engineer always
Administration put on safety
(Mirsharai) protection while
work in project site
area.

Advice to maintain
Administration
100% safety in
(Mirsharai)
project site.

Warned this worker


Administration & told him to put on
(Mirsharai) helmet & safety
shoe

Informed to all
contractor engineer
Administration
& labor to maintain
(Mirsharai)
100% safety in
project area.

Informed to all
Administration maintain 100%
(Mirsharai) safety before work
in project area.
Civil

Civil

Administration
(Mirsharai)

Civil

Civil

Civil

Civil

Civil
Civil

Civil

Maintenance
(Mechanical)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration told him to put on


(Mirsharai) safety helmet

Administration
(Mirsharai)
Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Administration
(Mirsharai)

Maintenance
(Electrical)
Maintenance
(Electrical)

Maintenance
(Electrical)

Maintenance
(Electrical)

Administration
(Mirsharai)

Maintenance
(Electrical)

Maintenance
(Electrical)

Electrical, SP

Civil
Civil

Maintenance
(Mechanical)

Maintenance
(Electrical)

Maintenance
(Electrical)

Civil

Civil

Civil

Civil
Civil

Civil

Maintenance
(Mechanical)

Maintenance
(Mechanical)

Maintenance
(Mechanical)

Civil

Civil

Civil
Civil

Civil

Maintenance
(Mechanical)

Informed safety
Civil
about the incident

Maintenance
(Mechanical)

Civil

Must not throw


Civil away anything from
height.

Mechanical, SP
Contractor People
Mechanical, SP (Snighdha
Contractor )

Mechanical, SP Mar-23

Belgium glass
Maintenance
agency look after the
(Mechanical)
job that time.

Maintenance Also assign fire


(Mechanical) watcher

Use proper PPE


Maintenance
during working
(Electrical)
time.

Maintenance
(Mechanical)

Maintenance
(Mechanical)

Civil
Civil

Civil

Civil

Maintenance
(Mechanical)

Maintenance
(Mechanical)

Mechanical, SP

Civil

Civil
Civil

Civil

Civil

Civil

Civil

Civil

Mechanical, SP

Mechanical, SP
Mechanical, SP

Civil

Civil

Civil

Civil

Civil

Civil

Civil
Mechanical, SP

Administration
(Mirsharai)

Civil Worker from SSE

Worker from N
Civil
Islam
KRA / KPI : Ensure Safety by giving Safety Observation Target (SOT) of ____ Nos.

Safety Observations (SO)


Month
Target Result Achievement
July, 2022 1 1 100%
August, 2022 1 1 100%
September, 2022 1 1 100%
October, 2022 1 1 100%
November, 2022 1 1 100%
December, 2022 1 1 100%
January, 2023 1 1 100%
February, 2023 1 1 100%
March, 2023 1 1 100%
April, 2023 1 1 100%
May, 2023 1 1 100%
June, 2023 1 1 100%
Total, Yearly 12 12 100%

You might also like