SPB
COREHOLE RECORD
COREHOLE No.
Gammon | overs: se00F 2000 sHeeT 4 of 4
PROJECT Redovelopment of Shek Kip Mei Estate Phase 1 - Design (Sita Formation)
METHOD Rotary CO-ORDINATES WORKS ORDER No. 038
e05470.72
MACHINE & No. D1 N921897.8 DATE tom 30/11/2001 to 30/tt7200%
FLUSHING MEDIUM Water ORIENTATION 37045" | GROUND LEVEL + 19.18 mPD
val 2] 0] 02
a) flee) Heese) le
aileelralelgil ity rs ’ Descbton
SES S| m Beez|s2) 2 EF &
[ray es TENFORCEVENT sl br TT wah Do
4 CONCRETE cover, (RETANING WALL)
Haan se SRY Say ay aS
{carte Sad wih some stronguar fe ave!
E fete ea SEodrock rogers UL)
- pea
Eels p+ al E
| poe
E sw
: fo | | CONCRETE POSTINGS
S122) CONCRETE THORONG TAVERT
| » - 3 3
F aa
5 |
| Hae a aT ay wT
E othaestasoa——————
; i
i
E | E
Seusnsteian ak vtwemae RENARKS
Coons 8 Penaamremaorte | Lecce wicsu | 1. teratn ease om veel ere hres
Sire teem down suns
wionwmasieasinge — E Pemesty et crcxeo weuna
avr T, seomnenptorin
Erasmo Vcrrormemcien [ATE suas _H.K.H.A. CONTRACT NO. : 160 OF 2000
CONTRACTOR : GAMMON CONSTRUCTION LIMITED
PROJECT : REDEVELOPMENT OF SHEX. KIP MEI ESTATE PHASE { DESIGN SITE FORMATION) |
WORKS ORDER NO. : 38 HOLENO.: CH4
BOXNO.: 1 OF 1
DEPTH: 0.00 m.TO 14.60 m
DATE OF THE PHOTOGRAPH : 5/12/2001 a —
a 5a.