1.0 PURPOSE
1.1 This procedure is to explain in detail the steps to be followed for commissioning of
Transformer differential protection devices and schemes and to facilitate effective
control of documents.
2.0 SCOPE
2.1 This procedure applies to commissioning of Transformer differential protection devices
and schemes in 132 kV and 400 kV substations.
3.0 DEFINITIONS
3.1 Approved drawing: The general arrangement, scheme drawings which are approved by
TPE with status code A or B to execute the work at site.
3.2 Approved setting : The approved values, parameters & configuration of the protection
relays issued by PCS to be implemented in the protection
relays before putting the relay in service.
3.3 BI : Binary Inputs.
3.3 BO : Binary Outputs.
3.4 CB : Circuit breaker
3.5 CT : Current Transformer.
3.6 CM-TPC: Commissioning Manager-Transmission Protection Commissioning.
3.7 DO : Drop Off.
3.8 HV : High Voltage.
3.9 IDT : Inter-Distribution Transformer
3.10 LV : Low Voltage.
3.11 LED: Light Emitting Diode.
3.12 M-TPC: Manager- Transmission Protection Commissioning.
3.13 PCS : Protection Calculation Setting, a section of TPD.
3.14 POC : Primary Operating Current.
3.15 PPE : Personal Protective Equipments.
3.16 PU : Pick-Up.
3.17 REF : Restricted Earth Fault.
3.18 RSI : Relay Setting Identifier.
Issue : 2 Rev:0 Date: 05.12.2011 Page 3 of 14
Transmission Power Division.
Transmission Protection Department
Protection Field Services
Transmission Protection Commissioning
Quality Procedure TP/TPD/PFS/TPC/QP-13
5.0 RESPONSIBILITY
5.1 VP-TP : VP-TP is responsible for approval & modification of this procedure.
5.2 M-TPC : M-TPC is responsible for implementation of this procedure.
5.3 CM-TPC : CM-TPC is responsible to plan testing activities as per the details of this
procedure.
5.4 Witness Engineer : Witness engineer is responsible to witness the testing of
relay/scheme
6.0 PROCEDURE
6.1 General.
6.1.1 Ensure the availability of approved setting for the protection device from TPD-PCS.
The RSI number of the setting template to be filled in the test formats
6.1.2 The TPC Witness engineer ensures the calibration certificate of measuring
equipments used for testing are available at site and ensures the availability of
relevant test sheets (given as attachment) prior to performing the site testing. The
testing instruments details shall be recorded in the test report.
6.1.3 Establish a communication between the relay and the computer (lap-top) for
uploading / down loading settings using the appropriate application software and
connecting cables.
6.1.4 Download the default settings from the relay to computer and update the approved
settings with date and time.
6.1.5 Configure the input / output mappings in the application software as per the
approved drawings. The date and time setting to be updated as actual
6.1.6 Upload the updated file to the relay and confirm the relay is healthy.
6.1.7 Relay soft setting and configuration file should be downloaded from the protection
relay finally and saved with the filename provided on the footer of the specific
setting template. A printout of the same shall be signed and attached with the test
report. The setting template sheet, test reports are also to be signed by the
contractor and the witness engineer.
6.1.8 Test report shall be filled during testing and the same shall be signed on the same
day of testing.
6.2 Protection Device testing.
Device - Siemens relay 7UT613 (Refer attachment TP/TPD/PFS/TPC/QP-
13:A01)
6.2.1 General Data and Inspection.
• The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.
• A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
• The jumper settings to be set for the rated voltage, current and correct pick up
voltage of the binary inputs. This is to be done as per Siemens relay 7UT613
manual.
6.2.2 Configuration of Protection functions:
• Relay configuration is done to enable only those protection functions which are
recommended in the relay setting template.
• Transformer data and differential protection settings are entered in the test report.
• Set cross block feature “YES” and time for cross block as 80 milli sec. The
differential trip will be blocked for 80 milli sec.
6.2.9 Testing of Add on Stabilisation for External faults: (Siemens 7UT612)
• The test is carried out to check CT saturation detection during the
duration of add on stabilisation as explained in the test format.
6.2.10 Binary Inputs and Outputs:
• Record the function of BI/BO in the test format. Apply voltage and check the BI is
functioning.
• Each BO to be checked separately by operating the particular function to which it is
assigned. The BO is tested by checking the continuity between contacts using a
multi-meter.
• Each LED indications are to be checked separately by operating the particular
function to which it is assigned. LED resetting operation is checked by manually
resetting the indications.
6.2.11 Other Checks:
• Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.
• Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device - Areva relay Micom P 632(Refer attachment TP/TPD/PFS/TPC/QP-
13:A02)
6.2.12 Relay Data and General Inspection.
• The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.
• A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
6.2.13 LED, Binary Inputs and Outputs:
• Record the function of BI/BO in the test format. Apply voltage and check the BI is
functioning.
• Repeat the test for other phases in HV side. Repeat the same for LV side also.
6.2.19 Testing 2’nd Harmonic restraint.
• 2nd harmonic blocking is set at 15%.
• 16% 2nd Harmonic is generated using the secondary injection kit is applied to HV
side R phase of relay and check differential is blocking. Relay should not trip.
• Reduce harmonics percentage in the injected current till the relay trips. Record the
value in the test format.
• Repeat the test for HV side Y and B phase.
6.2.20 Differential High set (I diff>>)test:
• Inject in R phase a current below “I diff>> setting and observe the tripping time.
The tripping time should be the normal differential tripping time.
• Repeat injection, gradually raising the current till the tripping time is less than the
differential operating current. Record the threshold value of “I diff>>” pickup
current.
• The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time.
6.2.21 Other Checks
• Disturbance recorder and event recorder from the relay are to be down loaded to
the computer (laptop) and the printout to be attached with the test report.
• Confirm operation of trip relay by inserting the appropriate trip link. Also confirm
signals to fault recorder and SCADA system are send from the relay.
Device – Duo Bias M (Refer attachment TP/TPD/PFS/TPC/QP-13:A03)
6.2.22 Relay Data and General Inspection.
• The testing engineer has to fill the General data (Relay Type, Serial No, Firmware
Version, Rated Current etc.) as mentioned in the test format.
• A general visual inspection is carried out to confirm the relay installation and
wirings are carried out as per the approved drawings.
6.2.23 Measurements Checks:
• Differential protection settings are entered in the test report.
• Use the secondary injection test kit to inject 1 amps current in HV side CT’s and
note down the relay display reading. Repeat the current injection in LV side CT’s
and note down the display readings in the test format. Compare with expected
current.
6.2.24 Differential bias characteristic.
• Bias characteristics are checked by injecting a bias current as reference, and then
gradually increasing the operating current till differential pickup. Verify results with
expected and measured operating values. The readings are taken keeping bias
currents at 0, 1, 1.5, 2 and 4 amps for each phase.
6.2.25 Timing Tests:
• Inject current 3 times setting current or as mentioned in test format in R phase and
note down the operating times values in the test format. Repeat the test for other
phases.
6.2.26 Differential High set test:
• The operating time of HIGH SET will be tested by injecting 2 times of high set
differential setting current and record the time. Repeat the test for other phases.
6.2.27 Harmonic Block test
• Inject a current higher than differential setting with a harmonic content of more than
harmonic block settings in red phase and see that the relay blocks tripping and
gives correct LED indication.
• Repeat the Injection in the other Y & B phases.
6.2.28 LED, Binary Inputs and Outputs:
• Record the terminal numbers of BI/BO in the test format. Apply voltage and check
the BI is functioning.
• Each BO to be checked separately by operating the particular function to which it is
assigned. The BO is tested by checking the continuity between contacts using a
multi-meter.
• Each LED indications are to be checked separately by operating the particular
function to which it is assigned. LED resetting operation is checked by manually
resetting the indications.
• Stability test in carried out as per the details given below. A 3 phase 415 Volts shall
be applied on LV (11kV Side) side of Transformer and all three phases of HV Side
shall be shorted and earthed. Actual values of current on HV and LV shall be
compared with the calculated value based on percentage impedance of
transformer. The differential and bias currents will be compared with the primary
current values.
• Identify the IDT for the differential relay under test.
• Isolate tripping to both HV and LV CB’s from differential relay.
• Isolate the section of 11 kV where this IDT-LV is connected by keeping all CB’s in
test position and opening the bus earth switch.
• 132 kV IDT bay is connected to either bus-1 or bus-2 and the connected bus earth
switch is closed. Line isolator and CB is kept closed for IDT.
• Supply 3 phase 415 Volts to one of the outgoing feeder in that section of 11 kV.
Rack in the CB of that bay to service and close CB. 11 kV section is now energised
with 415 V supply.
• Rack in the CB of the incomer where IDT-LV is connected. Close the CB to
circulate a current in primary circuit.
• Record all values of primary and secondary currents including the Differential
current and Restraint currents in the test formats. These are the normal values.
The differential Current shall be zero and Restraint current shall be high. The
currents are recorded while keeping the tap-changer in extreme low tap, middle tap
and high tap.
• Keep the tap changer in middle tap. The R phase of HV side CT shall be reversed
without opening the CT. Record all values of primary and secondary currents
including the Differential current and Restraint currents in the test formats. In this
condition the Differential current shall be predominant and Restraint current shall
be less. If the Differential current is more than the setting, the protections shall
operate. After recording the currents, the R phase shall be normalized. Confirm the
currents are normal values again. The same shall be repeated for Y and B Phase.
• Keeping the tap changer in middle tap, the R phase of LV side CT shall be
reversed now without opening the CT and record all the above values as done for
HV side CT’s. Again in this condition, the Differential current shall be high and
Restraint currents shall be less. If the Differential current is more than the setting
the protections shall operate. After Recording the currents the R phase shall be
normalized and confirm the currents are in order. The same shall be repeated for Y
and B Phase.
• If HV side is provided with 2 sets of CT’s, each set is compared individually with the
LV side CT’s. Also normal values are also taken for each set of CT’s in the
beginning and end of testing.
• After normalizing the CT’s on HV and LV the currents in Diff. Protection shall
measured and confirmed that the Diff current shall be zero and Restraint current
shall be high.
6.4 Risk Assessment & safety precautions.
Safety measures are identified through risk assessment process as follows,
6.4.1 Risk assessment to be carried before the testing activity to identify areas of risk for
both personal and equipment safety while doing the testing activity.
6.5.1 The measurement of the procedure output will be recorded in KPI sheet by
measuring the number of problems and abnormalities noticed after Energization of
substation due to lapses in commissioning activities.
7.0 RECORDS
7.1 The test report shall be signed and kept in concerned file.
7.2 The relay configuration and settings file (soft copy)and signed setting template in
PDF format is submitted to TPD-PCS
8.0 DISTRIBUTION
8.1 VP-TP
8.2 M-TPC
9.0 ATTACHMENTS
REFERENCE DOCUMENT:
SIPROTEC Transformer Differential PROTECTION 7UT612: ……………………….…………..
1- GENERAL DATA
Ordered MLFB: Serial No.
Built in MLFB: Ordered Version: Built-in Version:
Ordered rated current IN: 1A Ordered rated auxiliary voltage (DC): 110 V DC
Built-in rated current IN: 1A Built-in rated auxiliary voltage (DC): 110 V DC
Software used: DIGSI 4.5/4.6
TP/TPD/PFS/TPC/QP-13:A01 Page 1 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUBSTATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI: ………………………………………
3- Transformer Data:
Transformer Data Primary Winding Secondary Winding
UN 132 kV 12kV
PN 50 MVA 50 MVA
IN (calculated) 218.7 A 2405.7
CT Ratio 300/1 3200/1
4- Settings of Diff. Protection:
I diff > : I/ In = t diff > delayed :
I diff >> : I/ In = t diff >> delayed :
2nd. Harmonic : Slope 1:
5th. Harmonic : Slope 2:
Vector Group: Base Point 1:
Base Point 2:
5- Measurements Checks:
Primary I diff. I Rest.
Tested Secondary
Tested Winding Measured Measured Measured
Phases Injected (A)
(A) (I/In) (I/In)
R 1.0
Y Winding side 1 1.0
B 1.0
R 1.0
Y Winding side 2 1.0
B 1.0
Trip Time
Obtained Trip
Current Current 4 x Idiff
Expected Trip Value at
Relay Injection on Injection on
Phases Value Increasing
Settings CT-1 CT-2
CT Side 1 current on CT Inj. TIME
(A) (A)
Side-1 (A) (Sec)
TP/TPD/PFS/TPC/QP-13:A01 Page 3 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUBSTATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Final Settings Tests of DIFFERENTIAL RELAY Type: 7UT612.
RSI: ………………………………………
Measured
Set Cross-block Frequency/
Injected Cross-block Result with LED
time Phase Harmonics
Current (A) time indication
(ms) (Hz)
(ms)
R 1.0 50
100 Y 0.30 100
B 1.0 50
9- Testing of Add on Stabilization for External faults :
- I-ADD ON STAB setting: 3xI/In and Set duration of ADD-on stabilization: 10 Cycles.
200
BO 1 F6 – F7
BO 2 F8 – F9
BO 3 F10 – F11
BO 4 F12 – F13
BO 5 F14 – F15
Watch Dog F3 – F5
F4 – F5
Note: check status of Watch Dog contacts while the relay is energized and de-energized.
10- BINARY INPUTS
Binary Output Terminal No. Assigned for Test Result
BI 1 F14 – F15
BI 2 F16 – F15
BI 3 F17 – F18
I. OTHER CHECKS:
A) Check Operation & Resetting Of All Front Panel LED's :…………
B) Trip Relay Operation And All Alarms : …………
C) DR, ER's Downloaded and print out attached/ Final setting print out attached: ………..
Signature
Name
TP/TPD/PFS/TPC/QP-13:A01 Page 5 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
1- RELAY DATA
2- GENERAL INSPECTION
Visual inspection/ Correctness of Installation and wiring
Sr.No. on module, case and cover are identical
Relay case connected to a local earth bar
Installation & wiring correct to relevant drawings
Wiring and installation checks
Wiring and installation checks
Check for correct voltage polarity/Record the level at rear of the relay
3- LED CHECK
Check the operation of all LED’s on the relay front panel.
LED No. Allocation Result
LRD H1 Healthy
LED H2 Out of Service
LED H3 Alarm
LED H4 Main Gen Trip Signal
LED H5
LED H6
LED H7
LED H8
LED H9
LED H10
LED H11
LED H12
LED H13
LED H14
LED H15
LED H16
LED H17 Edit Mode
TP/TPD/PFS/TPC/QP-13:A02 Page 1 of 4
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
5- MEASUREMENT CHECK :
Winding HV CT ratio: ………………, Winding LV CT ratio:…………..
HV Side LV Side
Injected Expected Measured Injected Expected Measured
Current Current Current Current Current Current
Amps Amps Amps Amps Amps Amps
IR
IY
IB
TP/TPD/PFS/TPC/QP-13:A02 Page 2 of 4
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IR
IY
IB
TP/TPD/PFS/TPC/QP-13:A02 Page 3 of 4
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Signature
Name
TP/TPD/PFS/TPC/QP-13:A02 Page 4 of 4
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Final Settings Tests of Differential Relay Type DUOBIAS-M
1. GENERAL DATA
2- GENERAL INSPECTION
4. METERING CHECK
RELAY DISPLAY
WINDING PHASES I-APPLIED RELAY CURRENT
L1 L2 OPERATE REST.
W1 W2
TP/TPD/PFS/TPC/QP-13:A03 Page 1 of 3
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Final Settings Tests of Differential Relay Type DUOBIAS-M
0 1 1.5 2 4
PHASES
5 C. HIGHEST ELEMENT
TP/TPD/PFS/TPC/QP-13:A03 Page 3 of 3
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
Final Settings Tests of Differential Relay Type DUOBIAS-M
TP/TPD/PFS/TPC/QP-13:A03 Page 4 of 3
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
RELAY SETTING
I-DIFF > Setting : I/Inob I-DIFF >> Setting : I/Inob
Calculated I POC : Amps
Slope 1 : Slope-2 :
Base point 1 : Base Point-2 :
Primary
CT Phases
Current Enter details of measured current in mA at Relay Panel
Ratio Injected
(Amps)
XA (mA) X87 (mA) X64 (mA)
21 23 25 27 25 27
1 2 3 4
22 24 26 28 26 28
R–E
Y–E
B–E
HV (A) LV (kA) HV LV
R Y B R Y B Q1 Q3 Q5 Q6 R1 R3 R5 R6
R–E
Y–E
B–E
Y–E
B–E
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–E
Y–E
B–E
TP/TPD/PFS/TPC/QP-13:A04 Page 1 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Primary
CT Phases
Current Enter details of measured current in mA at Relay Panel
Ratio Injected
(Amps)
Y–B
B–R
BUS-1TR. DIFF & REF 300/1 (132 KV T1.1 SIDE)
R–Y
Y–B
B–R
Y–B
B–R
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–Y
Y–B
B–R
TP/TPD/PFS/TPC/QP-13:A04 Page 2 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
CT Phases Primary
Enter details of measured current in mA at Relay Panel
Ratio Injected Current (A)
XA (mA) X87 (mA) X64 (mA)
21 23 25 27 25 27
1 2 3 4
22 24 26 28 26 28
R–E
Y–E
B–E
BUS-2TR. DIFF & REF 300/1 (132 KV T1.2 SIDE)
R–E
Y–E
B–E
Y–E
B–E
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–E
Y–E
B–E
TP/TPD/PFS/TPC/QP-13:A04 Page 3 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Primary
CT Phases
Current Enter details of measured current in mA at Relay Panel
Ratio Injected
(Amps)
Y–B
B–R
BUS-2TR. DIFF & REF 300/1 (132 KV T1.2 SIDE)
R–Y
Y–B
B–R
Y–B
B–R
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–Y
Y–B
B–R
TP/TPD/PFS/TPC/QP-13:A04 Page 4 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Primary
CT Phases
Current Enter details of measured current in mA at Relay Panel
Ratio Injected
(Amps)
Y–E
B–E
HV (A) HV LV
R Y B R Y B Q1 Q3 Q5 Q6 R1 R3 R5 R6
R–E
Y–E
B–E
Y–E
B–E
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–E
Y–E
B–E
TP/TPD/PFS/TPC/QP-13:A04 Page 5 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
Primary
CT Phases
Current Enter details of measured current in mA at Relay Panel
Ratio Injected
(Amps)
XA (mA) X87 (mA) X64 (μA) (11KV)
5 7 9 11 25 27
9 10 11 12
6 8 10 12 26 28
R–Y
Y–B
B–R
HV (A) HV LV
R Y B R Y B Q1 Q3 Q5 Q6 R1 R3 R5 R6
R–Y
Y–B
B–R
Y–B
B–R
SEQ (HV) (A) SEQ (LV) (kA)
I1 I2 3I0 I1 I2 3I0
R–Y
Y–B
B–R
TP/TPD/PFS/TPC/QP-13:A04 Page 6 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION SENSITIVITY TESTS
TP/TPD/PFS/TPC/QP-13:A04 Page 7 of 7
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION STEBILITY TESTS
RELAY SETTING
I-DIFF > Setting : I/Inob I-DIFF >> Setting : I/Inob
Calculated I POC : Amps
Slope 1 : Slope-2 :
Base point 1 : Base Point-2 :
TP/TPD/PFS/TPC/QP-13:A05 Page 1 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION STEBILITY TESTS
TP/TPD/PFS/TPC/QP-13:A05 Page 2 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10 Tap position: 10 Tap position: 10
132KV BUS-2 CT : REVERSE
R - REVERSE Y- REVERSE B - REVERSE
11KV CT : NORMAL
R Y B N R Y B N R Y B N
Primary
11 KV (A) --- --- ---
Current
132 KV (F87T)
Secondary mA
current 11 KV (F87T)
mA
Line current
--- --- ---
(H.V) (A)
Line current (L.V)
--- --- ---
(KA)
Relay Display
Differential
--- --- ---
current
Restraining
--- --- ---
current
Relay current
HV REF (mA)
Operation
Relay current
LV REF (mA)
Operation
11kV Reversal
Tap position: 10 Tap position: 10 Tap position: 10
132KV BUS-1 CT : NORMAL
R - REVERSE Y- REVERSE B - REVERSE
11KV CT : REVERSE
R Y B N R Y B N R Y B N
Primary
11 KV (A) --- --- ---
Current
132 KV (F87T)
Secondary mA
current 11 KV (F87T)
mA
Line current
--- --- ---
(H.V) (A)
Line current (L.V)
--- --- ---
(KA)
Relay Display
Differential
--- --- ---
current
Restraining
--- --- ---
current
Relay current
HV REF (mA)
Operation
Relay current
LV REF (mA)
Operation
TP/TPD/PFS/TPC/QP-13:A05 Page 3 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION STEBILITY TESTS
Tap position: 10 Tap position: 10 Tap position: 10
132KV BUS-2 CT : NORMAL
R - REVERSE Y- REVERSE B - REVERSE
11KV CT : REVERSE
R Y B N R Y B N R Y B N
Primary
11 KV (A) --- --- ---
Current
132 KV (F87T)
Secondary mA
current 11 KV (F87T)
mA
Line current
--- --- ---
(H.V) (A)
Line current (L.V)
--- --- ---
(KA)
Relay Display
Differential
--- --- ---
current
Restraining
--- --- ---
current
Relay current
HV REF (mA)
Operation
Relay current
LV REF (mA)
Operation
Normalising
TP/TPD/PFS/TPC/QP-13:A05 Page 4 of 5
TRANSMISSION POWER DIVISION
PROTECTION DEPARTEMENT/ COMMISSIONING SECTION
SITE TEST REPORT
CONTRACT NO: NAME OF SUB STATION:
Main Contractor Name of Bay:
Consultant: Equipment:
Manufacturer SCADA No: Dt.
IDT Differential PROTECTION STEBILITY TESTS
Signature
Name
TP/TPD/PFS/TPC/QP-13:A05 Page 5 of 5