You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

MATCH LINE
SEE CP303
A A Appro. 10m B 502 A
350 350

MATCH LINE
SEE BELOW
36 37 38 39 40 41 42

CH 90.00m
4AP1 4AR1 4AP2 4N1 JB4

1,339.60 mm
R
B B
P P N

APPROX
R.L. +1.850mCD
SUBZONE C P R P

R.L. +1.225mCD

0.7
3500 14800 NOM
C 4BP1 4BR1 4BP2 C

MATCH LINE
SEE CP305
MATCH LINE
SEE ABOVE

43 44 45 46 47 48
CH 105.00m

CH 120.00m
JB4 4N2 4AP3 4AR2 4AP4
D D

N P P

APPROX
R.L. +1.850mCD
SUBZONE D P R P

E R.L. +1.225mCD
E
UB Counter weight
3500 14800 NOM
ACCESS CUTOUT
4BP3 4BR2 4BP4 SCHEDULED FOR
CONSTRUCTION PRIOR
ZONE 4 ELEVATION TO ANODE INSTALLATION.
DIMENSIONS APPROX.
NOTES:
2100

F F
1. DIMENSIONS & LOCATIONS INDICATIVE ONLY. CONTRACTOR TO CONFIRM 8. SCAN TO AVOID REINFORCEMENT PRIOR TO ANODE AND COMPONENT
ON SITE PRIOR TO WORKS AND ADJUST NUMBER OF ANODE COLUMNS TO SETOUT. POSITIVES, NEGATIVES, REFERENCES AND CABLE CHASES TO
LEGEND TERMINATE AT INDICATED LOCATION. BE MARKED ON CONCRETE AND APPROVED BY SUPERINTENDENT PRIOR
2. HORIZONTAL SPACING OF ANODES TO BE 300mm. TO BREAK OUT.
3. 150mm NOMINAL HORIZONTAL ANODE SPACING FROM EDGE OF SUBZONE. 9. LOCATION OF CABLE CHASE INDICATIVE ONLY.
P POTTED POSITIVE CONNECTION SUBZONE A SPACING NOT TO EXCEED 200mm. 10. ICCP SYSTEM TO BE INSTALLED FOLLOWING REMOVAL OF WHARF
R REFERENCE ELECTRODE SUBZONE B 2500 4. 200mm NOMINAL ANODE SPACING FROM EDGE OF FURNITURE.
OPENINGS/OBSTRUCTIONS. SPACING TO BE WITHIN 150 - 300mm. 11. EXISTING ICCP INSTALLATION TO BE INCORPORATED WITH NEW FENDER
N NEGATIVE CONNECTION CABLE CHASE 5. EACH ANODE CAN BE MOVED ±50mm TO AVOID REINFORCEMENT ICCP SYSTEM. REFER TO SPEC 2021.j019-doc4.
G G
8 BENT NUMBER CONDUCTOR BAR CHASE WITHOUT AFFECTING THE TOTAL QTY OF ANODES SPECIFIED WITHIN ANY 12. EXISTING ICCP INSTALLATION TO BE INSPECTED FOR GROUT
ROW OR COLUMN (NO CREEP). ACIDIFICATION. IF IDENTIFIED, REFER SPECIFICATION 2021.j019-doc4.
PENETRATION FOR JB ACCESS JB JUNCTION BOX (INSTALLED TO 6. REFER DWG CP350 FOR FENDER BEAM SECTION DETAILS AND ANODE 13. FOR DETAILS OF JB REQUIREMENTS REFER SPECIFICATION 2021.j019-doc4.
REVERSE FACE OF FENDER BEAM) TYPES. 14. SCAN TO AVOID REINFORCEMENT PRIOR TO CORING JB ACCESS
ANODE
EXISTING ICCP INSTALLATION 7. REFER DWG CP500 TO CP502 FOR COMPONENT INSTALLATION AND JB PENETRATION.
ISSUED FOR CONSTRUCTION
PENETRATION DETAILS.
CLIENT DRAWING STATUS
REV DATE DESCRIPTION DRAWN APPROVED
PORT OF MELBOURNE ISSUED FOR CONSTRUCTION
PROJECT
SWANSON DOCK DRAWING TITLE
BERTH 1 & 2 FENDER BEAM
REVISIONS

H H
SWANSON DOCK WEST REMEDIATION ZONE 4 ARRANGEMENT
DRAWN DRAWING CHECK REVIEWED SCALE DRAWING No.
CONSULTANT/CONTRACTOR
Beca Port of Melbourne Infracorr Consulting P.GODSON B.GREY A.CZERWINSKI NTS JOB No. PoM PROJECT No. PRECINCT CODE SHEET No. REV
Level 4,Queens Road, Level 19,839 Collins Street, 20 Business Drive,
DESIGNED CERTIFIED APPROVED SHEET SIZE
Melbourne, VIC 3004 Docklands, VIC 3008 Notting Hill, VIC 3168
0 18/08/2021 ISSUED FOR CONSTRUCTION PG AC SCALE IN METRES 2021.j019 P1359 SWA CP304 0
www.beca.com www.portofmelbourne.com www.infracorr.com B.GREY - A.CZERWINSKI A3

1 2 3 4 5 6 7 8 9 10 11 12