You are on page 1of 22

Inspection 4

Industry LLC

Home
General
Third Party Inspection
Vendor Inspection
Factory Acceptance Test
Inspection and Test Plan
Commodity Inspection
Industrial Inspection
Quality Control
Plant Inspection
Coating Inspection
Pre-Shipment Inspection
Vendor List
Fix Equipment
Pressure Vessel
Heat Exchanger
Piping System
Industrial Valve
Steam Boiler
Storage Tank
Process Heater
Rotary Equipment
Centrifugal Pump
Centrifugal Compressor
Reciprocating Compressor
Gas Turbine
Steam Turbine
Fan & Blower
E & I Equipment
Electric Generator
Electric Motor
Power Transformer
Control Panel
Switchgear
Power Cable
I4I Academy
I4I Academy Courses
Aramco API Classroom
API CPD Hours
API SIFE Training
API 510 Training
API 570 Training
API 653 Training
API 571 Training
ASME Training Course
ASME IX Training
Quality Control Training
CWI Endorsement Training
I4I Academy Contact
Get in Touch
About Us
Contact Us
Blog
Privacy Policy

Online API 570 Training


Course - Piping Inspector
with Money Back Guarantee

YouTube 8K
I4I Academy provides online API 570
training course - API 570 Piping Inspector -
for Exam Preparation and is available all
over the world. Our Students Pass Rate in
the API 570 Exam is 95.23%

With our money back guarantee, if you


do not pass your API 570 exam, we will
refund your money back to you, no
questions asked. However, you must
perform all course assignments! 

1:06

Online API 570 Training


Prep Course 
Full Package 

Pass the API 570 Exam on First Try 


More than 30 Hours Video Sessions
(In-Person Style & PPT Voice Over
Style both are available) 
Comprehensive Course Handout 
1000 Practice Exam Question (Quiz
Question Banks) 
Timed Final Exam (Mock-up Exam)
Online Comfort, log on and work on
the course whenever you want
60 Hours PDH (Profesional
Development Hour) Toward 9 Year
Certificate Renewal for American
Welding Society (AWS) Certified
Welding Inspectors 
60 Hours CPD (Continuing
Professional Development) Hour
Toward 3 year API 510, API 570, and
API 653 Recertification (Applicable
after Jan 2023)
60 Hours Training credit Toward 6-
Year Certificate Renewal for Candian
Welding Bureau Certified welding
Inspectors 
Instructor Support (If help needed
during the study)
4 Month Access
I4I Academy Certificate 
48 Hours Money Back Guarantee

When you completed each video session


and reviewed the corresponding handout,
then you are connected to the practice
question portal. You are going to answer the
questions for each code section. The
system lets you know if your answer is
correct or wrong and provides you with code
reference that question being taken.

You are going to take a final exam at the end


of the course (50 questions open book and
100 questions close book similar to API 510
exam) and receive a certificate from I4I
Academy (if you passed the exam). You can
take the exam multiple times until you pass
the exam. 

This online API 570 training course with the


video training sessions and practice exam
questions will prepare you to take the API
570 Piping Inspector exam and pass the
exam.
Question?  Contact I4I Academy, or Call 1
(949) 383-0564

Check Out Our Youtube Channel Videos

One-Time Payment  499.00


USD

Any problem with the enrollment process?


If the credit card payment fails, let us know
to fix it. Contact Us!

Risk-Free (Money-back
Guarantee): You can return this
training course up to 48 hours
from the time of payment!

With our money back guarantee, if


you do not pass your API 570 exam,
we will refund your money back to
you, no questions asked. However,
you must perform all course
assignments! 

If you had a little time to study


and did not pass the API exam,
you can have this course for
another 4 months  without any
additional charge!

However, if you think you do not need API


570 training and only need practice exam
questions, you may purchase only API 570
Practice Test and Exam Question Package. 
Highly recommend getting the API 570
training full package since you might
struggle with ASME B31.3, IX questions and
API 570 Problems Solving. 

Half Package: 

1000 Practice Exam Questions


Timed Final Exam (Mock-up Exam)
4 Month Access

One-Time Payment  349.00


USD

A sample Video for ASME B31.3 -


Impact Testing Exemption

9:20
Another Sample Video 

Impact Testing on ASME B3…


B3…
A sample Video for API 570 Problem
Solving Practice

2:56
Another Sample Video for Calculation
Problem 

API 570 Short Long Term Co…


Co…

Exam Portal Demo Presentation for


API 570 Open Book Question 
1:59
Exam Portal Demo Presentation for
ASME IX Open Book and Close Book
Questions

3:39
I4I Academy Certificate for API 570
Training Prep Course

Testimony

Khshayar. Y  Cologne - Germany

I took two online video training courses by


Inspection 4 Industry LLC; API 570 Training Course
and API 510 Training Course. 
Bob Rasooli has prepared videos in which he
describes all main and essential aspects of related
standards and exams in the best possible way. He
explains everything in detail and covers all subject
of the API 510 and API 570 exams. Undoubtedly
Bob Rasooli is one of the best in teaching and
preparation training for API exams. In addition to
videos, each course consists of numerous
questions and examples which helped me a lot to
pass both of my exams. I highly recommend these
training courses.

James. P  Houston - USA

If you want to learn API 570 deeply, take Bob's


course. His video lessons are fantastic. His ASME
IX, B31.3 and API 570 lessons are awesome. There
are almost 1000 practice questions which if you
practice enough, you will feel very comfortable in
the API exam while you are taking the exam. 

Alejandro. G Ciudad del Carmen, Mexico 

I recently completed the API 570 training course,


and it was a fantastic experience! Bob Rasooli, the
instructor, was incredibly knowledgeable and did an
excellent job explaining the course material. His
teaching style made complex concepts easy to
understand, and he was always available to answer
any questions. The course content was
comprehensive and well-organized, covering all the
necessary topics for the API 570 exam. The
practice questions and mock exams were
particularly helpful in preparing me for the real test.
Thanks to this course and Bob's guidance, I passed
the API 570 exam with confidence. I highly
recommend this training course to anyone seeking
API 570 certification; it's a valuable resource that
ensures you're well-prepared for the exam.

Mohammed. A , Dukhan,Qatar 

must say, the API 570 course I took was


outstanding, and the videos were simply amazing,
particularly the ASME Section IX videos. The
instructor's explanations were clear, and the way
complex concepts were broken down in those
videos was incredibly helpful. The course content
was thorough, covering all the relevant topics for
the API 570 exam. The ASME Section IX videos
were a standout feature, making the welding
requirements easy to understand and apply. Thanks
to this comprehensive training and the fantastic
video content, I felt well-prepared and confident
when sitting for the API 570 exam. I highly
recommend this course to anyone pursuing API
570 certification; it's a top-notch resource with
excellent instructional videos that truly make a
difference in your success.

4I Academy API 570 Prep C…


C…

I4I Academy API 570 Prep C…


C…

I4I Academy API 570 Prep C…


C…

API 570 Training Course -


ASME Related Standard
Following items are covered in ASME B31.3
(Process Piping)
B31.3 Scope and Exceptions
Owner Responsibility
Fluid Category, i.e. Category D, Normal
Fluid Service, Category M Fluid
Service, High Pressure Fluid Service,
Sever Cyclic Service
ASME B36.10 Dimension of Steel Pipe
Wall thickness Calculation of Stright
Pipe, i.e. pressure design thickness,
Min Required Thickness,
Determination of Pipe Schedule
Mill Tolerances Consideration
Joint Quality Factor
Blank Wall Thickness Calculation
Impact Test Requirement( evaluation
for exemption and test performance
requirements)
Pre- Heating Requirements
Post Weld Heat Treatment
Requirements
Inspection, Examination and Testing
Visual Inspection and Volumetric
examination (RT & UT)
Welding Inspection Acceptance
Criteria
Supplementary Examination
NDE Personnel Qualification
Requirements
Leak Testing Requirements
(Hydrostatic and Pneumatic)
Closure Weld Requirements
Thermal Expansion

Following items are covered in ASME


Section IX (Welding Qualifications)

WPS, PQR and WPQ Definition as per


Section IX
Manufacturer Responsibility Regarding
Welding
P, F, A numbers / Group Number
Essential, non-essential and
supplementary essential variables
SFA Specification and AWS
Classification
Write and Qualify a WPS Without
Impact Testing Requirements 
Discuss Welding variable ( Joint
Design, Base Material, Wall Thickness
Range, Filler Metal, Position, Pre-heat
Temp, Interpass Temp, PWHT Temp
and Holding Time,  Gas or Flux,
Electrical Characteristics, Technique,
etc.)
Welder and Welding Operator
Performance Qualification
Qualifying with the Volumetric Method
or Mechanical Testing / Requirements
Qualified Positions, Pipe diameter, Wall
Thickness, etc.  
Standard WPS's
Write and review a WPS with Impact
Test Requirements

Following items are covered in ASME


Section V (Nondestructive Examination)

Article 1 - General Requirements

Procedural Requirements
Personnel Qualification Requirements 

Article 2 - Radiography 

Backscatter Requirements
Density Limitation
Image Quality Indicator requirements
and selection
Radiography Techniques /
Requirements
Geometric Unsharpness Requirements
Reporting Requirements
Article 6 - Liquid Penetrant Examination

Detectable discontinuities
Surface Cleaning Requirements
Temp Limitation 
Control of Contaminations
Penetrant Types (Visible and
Fluorescent)
Type and Categories (Water washable,
Post emulsifying, Solvent removable)
Developer Application Requirements
Evaluation Requirements
Black light Requirements

Article 7 - Magnetic Particle Examination

Detectable discontinuities
Cleaning Requirement 
Temp Limitation
Surface
Contrast Enhancement Requirements
Different techniques i.e. Yoke, Prod
and corresponding requirements
Visible and Fluorescent Types
Calibration requirements
Lifting of weight requirements
Method of examination
Magnetizing Intensity Requirements
(Gaussmeters, Pie-Shaped Magnetic
Particle Field Indicator, Artificial Flaw
Shims )

Article 10 - Leak Testing

Testing Medium Requirements


Pressure Gage Requirements
Temp Limitation 
Leak Testing Techniques

Article 9 - Visual Examination 


Direct Visual Examination
Requirements
Light Intensity
Annual vision Test Requirements
Remote Visual Inspection

SE-797 UT Thickness Measurement

Article 4 - Ultrasonic Testing

Only Definition and understanding of


A, B and C Scan 

ASME B16.5 Pipe Flanges and Flanged


Fittings - Almost Entire Documents

API 570 Training - API


Included Standard and
Recommended Practices
API STD 570, Piping Inspection Code:
Inspection, Repair, Alteration, and Rerating
of In-Service Piping Systems - Entire
Document

API RP 574, Inspection Practices for Piping


System Components - Entire Document

API RP 577, Welding Inspection and


Metallurgy - Entire Document 

API RP 578, Material Verification Program


for New and Existing Alloy Piping Systems -
Entire Document

API RP 571, Damage Mechanisms Affecting


Fixed Equipment in the Refining Industry

Section 2 Terms and Definitions


3.3 Amine Stress Corrosion Cracking
3.8 Atmospheric Corrosion
3.9 Boiler Water and Stream
Condensate Corrosion
3.14 Caustic Corrosion
3.15 Caustic Stress Corrosion
Cracking
3.17 Chloride Stress Corrosion
Cracking
3.22 Corrosion Under Insulation
3.27 Erosion/Erosion – Corrosion
3.31 Galvanic Corrosion
3.37 Hydrochloric Acid Corrosion
3.43 Mechanical Fatigue (Including
Vibration-induced Fatigue)
3.45 Microbiologically Influenced
Corrosion
3.57 Soil Corrosion
3.58 Sour Water Corrosion (Acidic)
3.61 Sulfidation

ASME PCC-2, Repair of Pressure Equipment


and Piping

Article 201: Butt-Welded Insert Plates


in Pressure Components
Article 206: Full Encirclement Steel
Reinforcing Sleeves for Piping
Article 209: Alternatives to Postweld
Heat Treatment
Article 210: In-Service Welding on to
Carbon Steel Pressure Components or
Pipelines
Article 211: Weld Buildup, Weld
Overlay, and Clad Restoration
Article 212: Fillet Welded Patches
Article 304: Flaw Excavation and Weld
Repair
Article 305: Flange Repair and
Conversion
Article 306: Mechanical Clamp Repair
Article 501: Pressure and Tightness of
Piping and Equipment
Article 502: Nondestructive
Examination in Lieu of Pressure
Testing for Repairs and Alternations

Return to I4I Academy 

Did you find this article useful? Click on


below Like button!

New! Comments
Have your say about what you just read!
Leave me a comment in the box below.

Facebook Twitter

Search
this
Site! More
than 600
Articles!
inspection-for-industry.com
Copyright © 2012-2013 Inspection-for-Industry.Com

You might also like