You are on page 1of 1

Document No.

UAE045/501-UNEC-
UNEC LLC
Inspection & Test Plan: THGN-PW-MST-0003
Rev. No. : 2
MAF Tilal Al Ghaf Phase A LLC Method statement for Cone Penetration Test (CPT) Date : 25/01/2021
Page : 1page
ITP Clause Inspection Description Type of Reference Testing Requirement/ Acceptance Criteria Inspection Points Verifying / Control Data
No. Inspection Document Forms- responsibility
Arif &
UNEC Bin ITA
Toak
All the documents to have a minimum status of Code B
Relevant drawings, ITP's and Method Review
1 Submittals (Approved with comments) _ H H Submittal
Statement are submitted and approved document

Coordinates are marked as per drawings / sketch


Surveying IR- Setting out-
2 Reference ccordinates are marked Visual R H H
Visual Surveyor

-CPT is conducted on marked location


Submittals / -All equipments are calibrated
3 Execution of Test Visual R H H IR as per item-2
Visual -Depth of test to exceed fill Depth

LEGEND : H-Hold point, W-Witness Point, R- Review Documents UNEC - MAIN CONTRACTOR ITA - Independent Testing Agency
S-Surveillance Inspection, P-Progressive Inspection Arif & Bin Toak- Supervision consultant

PQ03DMP(0.00)