LAPORAN KEUANGAN

By Owner

Estimasi Nilai Anggaran Project 83.634.298,21 100,00%


Nilai Actual Project 82.924.061,00 99,15%
Estimasi Sisa Anggaran 710.237,21 0,85%

Uang Masuk Perhitungan Management Fee 10%


Keterangan Nominal % Estimasi Mfee Berjalan 8.292.406
Dana Masuk 83.635.000 100,00% Pengambilan Mfee 8.292.406
Sisa Dana Masuk 710.939 Plus Sisa Mfee Berjalan 0

Uang Keluar (By Owner) Uang Keluar (By Kontraktor)


Keterangan Nominal % Keterangan Nominal %
Material 55.848.561 66,78% Material 17.350.200 0,00%
Operasional 53.500 0,06% Operasional 3.200.000 0,00%
Subcon 500.000 0,60% Subcon 0 0,00%
Upah 26.522.000 31,71% Upah 7.350.000 0,00%
Sewa Alat 0 0,00% Sewa Alat 0 0,00%
Invent Kontraktor 0 0,00% Invent Kontraktor 0 0,00%
Admin bank 0 0,00% Admin bank 0 0,00%
Total 82.924.061 99,15% Total 27.900.200 0,00%