Scope of Work
Scope of Work
4.Submit Detailed Erection Engineering document(Detailed Splice design,Erections cleat and lifting Lugs designs,if required).
5.Submit Erection Engineering drawings.
6.Submit fabrication drawings with BOQ.
East Canopy
1.Submit Design Basis report,Design of East Canopy using Staad pro(Ensuring Serciveability & Check Utilization ratio for limit
state for replaced members).
Note: Decide erection splice location if required.
2.Submit Detailed member design document and Connection Design document with Ideastatica files/Design of pedestal. Will be updated soon
3.Submit Engineering Drawings.
4.Submit Detailed Erection Engineering document(Detailed Splice design,Erections cleat and lifting Lugs designs,if required).
5.Submit Erection Engineering drawings.
6.Submit fabrication drawings with BOQ.
West Canopy
1.Submit Design Basis report,Design of West Canopy with cable analysis using Staad pro(Ensuring Serciveability & Check
Utilization ratio for limit state for replaced members).
Note: Decide erection splice location if required.
2.Submit Detailed member design document and Connection Design document with Ideastatica files. Will be updated soon
3.Submit Engineering Drawings.
4.Submit Detailed Erection Engineering document(Detailed Splice design,Erections cleat and lifting Lugs designs,if required).
5.Submit Erection Engineering drawings.
6.Submit fabrication drawings with BOQ.