Open Wye-Wye

120/208 4 wire
This bank is used to supply a three phase four wire service of 120/208 volts when only two different phase wires
are available. One of the transformers will need to be twice the KVA capacity as the others as it will have full line
current on both coils. The tank straps connected to the smaller transformers X2 bushings will need to be removed.
One of the X2’s will become a secondary phase wire. The other is removed to prevent secondary neutral current
from flowing on the case grounding system.

This connection is not a very efficient use of transformers but is useful in a temporary application or emergency.
OSHA Required Tailgate Discussion
Topics
• Hazards Associate with the job
• Work Procedures Involved
• Special Precautions
• Energy Source Controls
• PPE Required
Work Procedures Hazards associated with the Special
Involved job Precautions
Energy Source Personal Protective
Controls Equipment

A safe job begins with a thorough inspection of…

Be sure to record your emergency


Tools Beofcertain all ofarea,
your be
tools
Be aware your work sure to cover
location and post in are a location
in good shape.
anything you can reach touch or fall into. And
everyone on the crew knows.
anything that can reach touch or fall into you!
Have your PPEEquipment
and First AidMake kit sure your trucks are all in
Discuss all PPE needed for the job and wear your
available
working order take time to preflight
Working PPE.
in Be sure
traffic toofinspect
exposes you your
to equipment
hazards that prioryour
to use.
BeSlips
suretrips
yourand
AED falls
is
equipment are some
accessible.
and the
insure there are no surprise.
mostare Identify
difficult
common alllook
to control.
injuries, voltages
Give
for theyouvehicles
are exposed
plentyto. Be sure to
of time
hazards seehave
tocould and
thatLine/Structure all
cause of
avoid your
this.you!
Be Arc-Flash
LookFollow
over
protective
the
the manual gear on.
sure to inspectofand traffic
wear Identify
control
your for
fallayour
dedicated
area. observer structure. Are
line and
there any potential hazards? (Broken
arrest harness.
insulators, damaged wire, clearances over
roads or from trees?)
Hang the required hardware
Note the side that has two
cutouts is opposite the system
neutral. You only need two
cutouts.
Parallel two of the transformers
internally. Leave one series
internally. This transformer will
need to be twice the KVA as the
others.
Ground all of the transformer cases
as well as the transformer cluster.
Remove the tank strap from the
X2 bushing of the smaller left
and center transformers.

X2

Remove
tank strap
Connect all primary H2 bushings
together and then connect them
to the system neutral.

H2
Connect all primary H1 bushings
of the center and left
transformers to the left cutout.

H1
Connect all primary H1 bushings
of the right side transformers to
the cutout.

H1
Connect the center transformers X2
and the larger right hand transformers
X2 together and then to the service
neutral.

X2
X2

Neutral
Connect the Larger right hand
transformers X3 to the far left
transformers X1. This wire should be
isolated from everything else.

X1 X3

Neutral
Connect one of the service lines to the
left transformers ungrounded X2
bushing.

X2

Neutral

Line
Connect one of the service lines to the
center transformers X1 bushing.

X1

Neutral

Line
Connect one of the service lines to the
larger right hand transformers X1
bushing.

X1

Neutral

Line
With the cutouts open, connect the
primary jumpers to different phases.

Neutral

Line
Close the cutouts, test
voltage and rotation.

Neutral

Line