120/208 4 wire
This bank is used to supply a three phase four wire service of 120/208 volts when only two different phase wires
are available. One of the transformers will need to be twice the KVA capacity as the others as it will have full line
current on both coils. The tank straps connected to the smaller transformers X2 bushings will need to be removed.
One of the X2’s will become a secondary phase wire. The other is removed to prevent secondary neutral current
from flowing on the case grounding system.
This connection is not a very efficient use of transformers but is useful in a temporary application or emergency.
OSHA Required Tailgate Discussion
Topics
• Hazards Associate with the job
• Work Procedures Involved
• Special Precautions
• Energy Source Controls
• PPE Required
Work Procedures Hazards associated with the Special
Involved job Precautions
Energy Source Personal Protective
Controls Equipment
X2
Remove
tank strap
Connect all primary H2 bushings
together and then connect them
to the system neutral.
H2
Connect all primary H1 bushings
of the center and left
transformers to the left cutout.
H1
Connect all primary H1 bushings
of the right side transformers to
the cutout.
H1
Connect the center transformers X2
and the larger right hand transformers
X2 together and then to the service
neutral.
X2
X2
Neutral
Connect the Larger right hand
transformers X3 to the far left
transformers X1. This wire should be
isolated from everything else.
X1 X3
Neutral
Connect one of the service lines to the
left transformers ungrounded X2
bushing.
X2
Neutral
Line
Connect one of the service lines to the
center transformers X1 bushing.
X1
Neutral
Line
Connect one of the service lines to the
larger right hand transformers X1
bushing.
X1
Neutral
Line
With the cutouts open, connect the
primary jumpers to different phases.
Neutral
Line
Close the cutouts, test
voltage and rotation.
Neutral
Line