1 2 3 4 5 6 7 8

A B C D E F G

A A
B
A A

C1 C2 C1

B B
B
SECTIONAL ELEVATION

A B C D E F G

C SECTION B-B C

PB1 C1 C1 PB1 C2 PB1 C2 PB1 C2 PB1 C2 PB1 C2 PB1 C1 C1 PB1

F1 F2 F2 F2 F2 F2 F1

D
LAYOUT OF FOOTING PLAN D

A B C D E F G

C1 C1 C2 C2 C2 C2 C2 C1 C1
COLUMN C1 COLUMN C2

E E
SECTION A-A LEGEND:-

NOTES:-

F F

G G

DETAILS OF FOUNDATION F1 DETAILS OF FOUNDATION F2

CLIENT: DESIGN CONSULTANT: APPROVED BY: SP STATUS DETAIL PROJECT REPORT


Feedback Infrastructure Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from
F DBAC Services Private Limited
15th Floor, Tower 9B
CHECKED BY: AT PROJECT: Junction with Ludhiana-Malerkotla (SH-11) near Bhogiwal village to Junction with
NATIONAL HIGHWAYS AUTHORITY OF INDIA Ludhiana-Moga road (NH-5) near Mullanpur Dakha (Km 225+770 to km 260+860)
H (Ministry of Road, Transport & Highways)
DLF Cyber City Phase-III, H
Gurgaon 122 002 DESIGNED BY: RK on EPC mode under Bharatmala Pariyojna in the state of Punjab
Government of India
G - 5 & 6, Sector - 10, Dwarka TITLE:
New Delhi - 110075 The information contained herein is Confidential & Property of Feedback Infra PREPARED BY: VN DIMENSION DETAIL DRAWING OF BOUNDARY WALL
Private Limited and not for Publication. The Information is Issued on the
Understanding that no part thereof shall be Copied or Communicated to a Third SCALE: @ A2 DATE: REV. SHEET:
Party without Authorization in Writing from Feedback Infra Private Limited DRG NO.: FIPL-DK-MISC-005
DATE REV DESCRIPTION OF REVISIONS BY AS SHOWN SEPTEMBER-2020 0 (01 OF 02)

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

F F H H SECTION F-F SECTION H-H

D D D D
B B

D E E D D G G D

SECTION E-E SECTION G-G


REINF. DETAILS OF COLUMN C1 REINF. DETAILS OF COLUMN C2
C C

SCHEDULE OF REINF.:-

SECTION A-A SECTION B-B SECTION C-C

D C C D

A A B B

E C C E
SECTION D-D
REINF. DETAILS OF PLINTH BEAM PB1
FOOTING DETAIL F-1 FOOTING DETAIL F-2

F J LEGEND:- F

NOTES:-

G G

REINF. DETAILS OF PRECAST PANEL SECTION J-J

CLIENT: DESIGN CONSULTANT: APPROVED BY: SP STATUS DETAIL PROJECT REPORT


Feedback Infrastructure Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from
F DBAC Services Private Limited
15th Floor, Tower 9B
CHECKED BY: AT PROJECT: Junction with Ludhiana-Malerkotla (SH-11) near Bhogiwal village to Junction with
NATIONAL HIGHWAYS AUTHORITY OF INDIA Ludhiana-Moga road (NH-5) near Mullanpur Dakha (Km 225+770 to km 260+860)
H (Ministry of Road, Transport & Highways)
DLF Cyber City Phase-III, H
Gurgaon 122 002 DESIGNED BY: RK on EPC mode under Bharatmala Pariyojna in the state of Punjab
Government of India
G - 5 & 6, Sector - 10, Dwarka TITLE:
New Delhi - 110075 The information contained herein is Confidential & Property of Feedback Infra PREPARED BY: VN REINFORCEMENT DETAIL DRAWING OF BOUNDARY WALL
Private Limited and not for Publication. The Information is Issued on the
Understanding that no part thereof shall be Copied or Communicated to a Third SCALE: @ A2 DATE: REV. SHEET:
Party without Authorization in Writing from Feedback Infra Private Limited DRG NO.: FIPL-DK-MISC-005
DATE REV DESCRIPTION OF REVISIONS BY AS SHOWN SEPTEMBER-2020 0 (02 OF 02)