Professional Documents
Culture Documents
Monthly Maintenance Monitor PT AAI 2022 Bulan Feb 2023 Ver 2
Monthly Maintenance Monitor PT AAI 2022 Bulan Feb 2023 Ver 2
TOTAL
1 Feb-23 6-Feb-22 7:24 PM
1 Feb-23 9-Feb-22 6:31 PM
TOTAL
JAM
JAM BREAKDOWN FEB
STATION BREAKDOWN 2023
JAN 2023
% JAM
% JAM BREAKDOWN
STATION BREAKDOWN
FEB 2023
JAN 2023
LOADING RAMP 0.00% 36.97%
THRESHING 0.00% 63.03%
% PERBANDINGAN
SELISIH JAN 23 DAN FEB 23
DENGAN JAN 23
0.00
8:43 PM 1:19 1.32 LOADING RAMP
8:46 PM 2:15 2.25 THRESHING
1.32
-1.32
-2.25
-3.57
36.97%
-
63.03% -63.03%
-36.97%
-63.03%
I beam frame tippler sudah banyak yang rusak (wear and tear)
Bolt nut pada scraper bar sering longgar kerana bahagian rantai ada yang rusak
Liner nipis
Plate nipis
Plate nipis
Nipis
Perlu penggantian platform yang baru. Frame dan plat sudah corrosion
/ Impeller fan damage
Liner nipis
Nipis
2" pipe ss bocor. Perlu penggantian pipe baru kerana sudah nipis.
/
Tube bocor
Bocor dan plate nipis
Bocor dan plate nipis
Rusak dan bengkok
L
M
M
H
M
M
H
H
H
H
M
M
M
M
H
M
L
Action/Status
Plat dan stopper perlu diperbaiki (di revise semula quotation) Material sudah dibeli tahun 2022
Wear and tear di bahagian pintu. Perlu di adjust semula. Recommend kerja dilakukan oleh contractor
Planning untuk penambahan safety valve brand lasser
Menunggu approval ( Purchasing Jakarta)
Bahagian gigi gear perlu dikunci rapi oleh operator semasa menutup sterilizer.
Menunggu approval ( Purchasing Jakarta)
Under commisioning
Planning untuk penggantian I beam. Recommend untuk dilakukan oleh contractor (unbudget)
Dilakukan pemantauan mengunci bolt scraper bar dan alignment rantai sebelum proses dimulakan. Planning penggantian dum
Long term planning untuk penukaran rantai dan gear brand Omega
Recond front worm screw (4X sudah recond) (13/1/2023)
Recond cone. (4x recond) (13/1/2023)
Planning penukaran spandek 4pcs temporary. Planning untuk long term menggunakan 2mm plate. Selesai penukaran expende
Done. Penukaran ribbon yang lama selesai dilakukan. (guna barang bekas)
Sementara menggunakan pump hydraulic press 3. Permintaan pembelian barang telah dilakukan
Shaft wear and tear. Penukaran bearing, shaft dan bearing dilakukan
Melakukan pengechekan bolt nut sebelum proses dan menampal body conveyor yang bocor. Menunggu approval dari purcha
Planning untuk fabrication perforated plate ( Menunggu approval Jakarta). Penambahan plat temporary selesai dilakukan
Revise quotation
Fabricate new impeller. Cause damage by imbalance rotation. Fiber stuck infront of rim. Solution to made manhole on front tr
Repair unit. Modifikasi bilah rotor dengan penambahan canvas bahagian hadapan
Menampal body yang bocor
Sedang dilakukan penukaran pipe 1", shaft 1" dan side plate
CAPEX 2023
Penawaran harga. Ms plate 6mm, 8mm untuk bottom tank dan besi siku 65 x 65 x 4mm. Solution sementara menampal permu
Slow firing
Menunggu approval.
Planning converting superheated ke saturated pada 22/3/2023 dan penukaran dust collector cone.
Menggunakan tangki spare genset(bahagian bawah) untuk tekanan minyak balik berjalan lancar. (kemungkinan fuel return pip
Rp 40,000,000 Contractor
Rp 380,000,000
Rp 399,500,000 Contractor
Rp 257,500,000 Contractor
Rp 200,000,000
Rp 200,000,000
Rp 330,000,000
Incinerator
1
Incinerator
2
Kernel
Station
DASARKAN
KET.
Kondisi Alat rusak
Kondisi alat rusak ringan/ aus
EB Press
Station
Kernel KERNEL 1
Station BUNKER 2
KERNEL
BUNKER 1
KERNEL
BUNKER 1
HYDROCYCLONE 1
Threshing
EB Press Station
Station
EB EB
press press
1 2
KERNEL HEATER
1 2 3 1,2,3
1 2 3 KERNEL
SILO 1,2,3
HYDROCYCLONE 2
LTDS 1 AND 2
STAGE
Press
Station
RIPPLE
MILL
DEPERICARPER
2
DESTONER
1 AND 2
DEPERICARPER
1
FF
2ND
Boiler
Station
Chamber Condensate pit
Lori Lori
RECLAIM 1 PUMP
1 TANK
BACK TANK
2
BUFFER
TANK
SKIM
OIL
TANK DESANDER
IT
TANK COND DECANTER
tANK
1,2
IT
TANK COND DECANTER
tANK
1,2
1 SLUDGE
SLUDGE PUMP TANK
2
pot
CSTT T
OIL TRANSFER
PUMP 1,2,3
B TURBINE 2
P
V
TURBINE 1
Engine Room
MAIN PANEL
2
BOILER 1 BOILER 2 FF
3
2ND
4
FD FD
1
ID ID
1
ID ID
SOFTENER 1
AND 2
1 2 3
OVERHEAD
TANK
SAND
FILTER
WATER BASIN
TANK
CLARIFIER WATER
TANK
ALUM,SODA,
POLIMER PUMP
Condensate pit Condensate
pump
Sterilizer Station
Lori
Lori
Lori
Lori
LOADING RAMP
Clarification
PUMP
Station
BACK TANK
BUFFER FEED
TANK TANK
1 2
DECANTER
1,2
DECANTER
1,2
SLUDGE PIT
VACUUM
DRYER 1,2
1
1 SLUDGE PIT
1 2 3 PUMP 1,2
2
3 2
New SPO
OIL TRANSFER tank
PUMP 1,2,3
DEOILING
TANK 2
GENSET 3
GENSET 2
New
exhaust
GENSET 1 chamber
ANEL
4
SOFTENER 1
AND 2
WTP
Station
WATER PUMP 1
WATER PUMP 2
FIRE FIGHTING PUMP 3
3 4 JOCKEY PUMP 4
Sterilizer Station
STORAGE 3
MP
STORAGE 1 STORAGE 2
Store
Lab
Mill Office
PT ANDALAS AGRO INDUSTRI SEHINGGA MARCH 2023
Kinali - Palm Oil Mill
CONVEYOR / ELEVATOR CHAIN PART LIST
ar 75mm, change scraper bar 8 pcs * Change new plate strip 65mm, sprocket 6"8teets 1 set fruit
75mm 10pcs, change scraper bar 8 pcs * Change New Chain 65M Plate Strip 65mm Fruit elevator 01
* Change liner and chain too bucket fibre elevator 19 oktober 2021
NEXT CHANGED CHAIN
MONTH/YEARS
BRAND CHAIN 2009 2010 2011 2012 2013 2014 BRAND OF CHAIN
TRP chain
BROOKS ANDEL 9-May AGUS -11 14-May UK-CHAIN
BROOKS ANDEL 9-Apr 11-Jul UK-CHAIN
UK-CHAIN 12-Oct
BROOKS ANDEL 9-Jul 11-Jan 14-May PRIMER
BROOKS ANDEL 9-May AGUS -11 AGUS -13 UK-CHAIN
UK-CHAIN 12-Oct
UK-CHAIN DES-10 AGUS -13
AGUS -11
UK-CHAIN 14-May
BROOKS ANDEL 9-May AGT -12 BROOKS ANDEL
UK-CHAIN 10-Jul 12-Nov
12-Nov
13-May
20-Sep
JUL_16 13-Sep
19-Mar
17-Jun 19-Oct
UK-CHAIN 17-Jun 19-Apr
17-Oct 6-Mar
12/17/2022
16-Oct
REMARK
POINT
PART
1 2 3 4 5 6 7 8
3 9.80 10.9 14.5 14 14.3 13.9 12 11.9
6 10.10 11.3 13.8 13.8 14.4 14.1 12.2 11.8
9 9.6 11.7 14.3 13.8 14.4 14.1 12 12
9 3
6
Outlet
Door
2) LINER INSPECTION
POINT
PART
1 2 3 4 5 6 7 8
4 6.50 6.20 6.10 6.30 6.10 6.20 6.20 6.20
6 6.30 6.00 6.10 6.10 6.10 6.00 6.30 6.30
8 6.60 6.30 6.20 6.20 6.30 6.10 6.20 6.00
`
`
8 4
6
DATE: 20/12/2022
AVERAGE
SHELL PLATE/BOILER PLATE 15MM
12.66
12.69
12.74
4 5 6 7 8
INLET
Inlet Door
AVERAGE
LINER SIZE
6.23 9MM
6.15
6.24
Planning Maintenance 2023 For EB press
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
A
A
R A R
R A R
B
B
286 286
July Aug Sept Oct November
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
B
B
15/8 running back 600
600
Assumption hr milling
11hr x 6day = 66hr per week A
Rc Planning Recond
B Fail or breakdown
C Planning to check condition and r
Assumption run 11hr milling per day
297 286 264 297 275 297
Dec Jan Feb March April Mei
W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
C
C
R A R C
R A R C
RC BL
S S
nning Recond
RP Replace
or breakdown CH Change
nning to check condition and refer the manual book for recommended (replace) RC Recond
on run 11hr milling per day S Service
OH Overhaul
BL Balancing
AL Alignment
2023
297 286 286 297 286 286 286
Mei Jun July Aug Sept Oct Nov
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
C C
R
R R
R R
RP RP RP
Out of planning
Early / Based on planning
R Breakdown or fail
Remark
286 286 3432 11.9166667
Nov Dec
W4 W1 W2 W3 W4
C
C
286 286
Nov Dec
W4 W1 W2 W3 W4
R
R
C
C
Planning Maintenance 2023 For Digester and Press machine
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15 HM Total
Jan 23
DIGESTER AND PRESS 1 Service W1 W2 W3 W4 W1 W2
Short arm 2000 425 38141
Long arm 2000 425 38141
Expeller arm 2000 425 38141
Digester shaft 5000 425 38141
Bottom plate 2000 425 38141
Press cage 1800 862 38166
Press screw 800 104 38166
Press gearbox bearing 5000 862 38166
Press shaft 5000 862 38166
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15
Jan 23
DIGESTER AND PRESS 2 Service HM Total W1 W2 W3 W4 W1 W2
Short arm 2000 1807 37158
Long arm 2000 1807 37158
Expeller arm 2000 1807 37158
Digester shaft 5000 1807 37158
Bottom plate 2000 1807 37158
Press cage 1800 402 36496
Press screw 800 140 37050
Press gearbox bearing 5000 402 37050
Press shaft 5000 402 37050
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15
HM Total
Jan 23
DIGESTER AND PRESS 3 Service W1 W2 W3 W4 W1 W2
Short arm 2000 2828 42829
Long arm 2000 2828 42829
Expeller arm 2000 2828 42829
Digester shaft 5000 2828 42829
Bottom plate 2000 2828 42829
Press cage 1800 1702 44257
Press screw 800 831 42315
Press gearbox bearing 5000 1702 42315
Press shaft 5000 1702 42315
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15
HM Total
Jan 23
DIGESTER AND PRESS 4 Service W1 W2 W3 W4 W1 W2
Short arm 2000 1194 40711
Long arm 2000 1194 40711
Expeller arm 2000 1194 40711
Digester shaft 5000 1194 40711
Bottom plate 2000 1194 40711
Press cage 1800 248 40377
Press screw 800 628 40377
Press gearbox bearing 5000 628 40377
Press shaft 5000 628 40377
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15
HM Total
Jan 23
DIGESTER AND PRESS 5 Service W1 W2 W3 W4 W1 W2
Short arm 2000 694 9090
Long arm 2000 694 9090
Expeller arm 2000 694 9090
Digester shaft 5000 694 9090
Bottom plate 2000 694 9090
Press cage 1800 481 39365
Press screw 800 478 39365
Press gearbox bearing 5000 481 39365
Press shaft 5000 481 39365
Digester and Press Machine Mill running assumption (hr) 286 264
Jan Feb
Based on 15 HM Total
Jan 23 (Totalizer)
DIGESTER AND PRESS 6 Service W1 W2 W3 W4 W1 W2
Short arm 2000 863 24785
Long arm 2000 863 24785
Expeller arm 2000 863 24785
Digester shaft 5000 863 24785
Bottom plate 2000 863 24785
Press cage 1800 784 31187
Press screw 800 784 31187
Press gearbox bearing 5000 784 31187
Press shaft 5000 784 31187
2023
264 297 275 297 286 286 297
Feb March April Mei Jun July Aug
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
425
425
425
425
425
862
104
862
862
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
1807
1807
1807
1807
1807
402
140
402
402
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
2828
2828
2828
2828
2828
1702
831
1702
1702
264 297 275 297 286 286 297
Feb March April Mei Jun July Aug
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
1194
1194
1194
1194
1194
248
628
628
628
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
694
694
694
694
694
481
478
481
481
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2
863
863
863
863
863
784
784
784
784
Planning to change
Shaft broken or breakdown
Actual
Total
297 286 286 286 286 2950.74
Aug Sept Oct Nov Dec
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
-22.912424
3375.74 4575
938
696
3812.74
3812.74
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
2548.74
2548.74
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
297 286 286 286 286
Aug Sept Oct Nov Dec
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
806
806
806
1756.74
806
1552
172
2322.74
2322.74
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
1306
1306
1306
2256.74
1306
1319
322
2469.74
2469.74
W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4 W1 W2 W3 W4
2087.74
2166.74
2166.74
1 years sep to december
3432 1144 4576
71.496
66.5551353
13.6456212
10.1251091
1398 20.3375036
660 9.60139657
4598 66.8897294
4598 66.8897294
26.185627
11.6380564
11.7253419
22.5778295
2.50218214
18.9991271
18.9991271
18.9991271
18.9991271
19.1882456
4.68431772
1137 16.5405877
1137 16.5405877
1137 16.5405877
1137 16.5405877
1016 14.7803317
16 0.23276113
Wheel Loader Mill running assumption (hr) 286 264
Based on Jan Feb
HM Total
Service Service hr 28 Feb 23 W1 W2 W3 W4 W1
Major 5000 615 38119
Minor 2500 615 38119
Lubrication 250 615 38119
1885
264 297 275
Feb March April
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
P P
2596
1885 1325
1738
2023
75 297 286 286
pril Mei Jun July
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P P P
1981
1229
2023
286 297 286
July Aug Sept
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
A
P P P
2056
86 286 286 286
ept Oct Nov Dec
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P P P
286
Dec
W2 W3 W4
Planning Maintenance 2023 For Decanter
1885
264 297 275
Feb March April
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
P P
2596
1885 1325
1738
2023
75 297 286 286
pril Mei Jun July
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P P P
1981
1229
2023
286 297 286
July Aug Sept
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
A
P P P
2056
86 286 286 286
ept Oct Nov Dec
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P P P
286
Dec
W2 W3 W4
PT. ANDALAS AGRO INDUSTRI. POM
KEY MACHINERY DAILY RUNNING HOURS RECORD
SHIFT 2
TOTAL Acumulatif
Remarks
START STOP HOURS HOURS RH
12 4394 To Service
12 3793
3522 Breakdown
1429
3000 3005 5 10 45
3000 3005 5 10 45
1 217 To Service
37710 37714 4 8 128
FOREMAN ENGINEERING PRODUCTION
MANAGER
14163
12802
1429
Planning Maintenance 2023 For Genset
9824
264 264 260
Feb March April
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
P
P P
P
P P
62 60
Feb March April
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
264
260
74
2023
60 264 260 264
pril Mei Jun July
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P
P P
2023
70 171 170 171
pril Mei Jun July
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P
P P
60 62 60 62
pril Mei Jun July
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P
P
023
264 264 260
July Aug Sept
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
P P
P P P
023
171 171 170
July Aug Sept
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
P
P P P
62 62 60
July Aug Sept
W2 W3 W4 W1 W2 W3 W4 W1 W2 W3
60 264 260 264
ept Oct Nov Dec
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P
P P
P
P P
60 62 60 62
ept Oct Nov Dec
W4 W1 W2 W3 W4 W1 W2 W3 W4 W1
P
Total
264 2624
Dec
W2 W3 W4
Total
171 1706
Dec
W2 W3 W4
17802
P
P
62 680.74
Dec
W2 W3 W4
Out of planning
Early / Based on planning
Breakdown or fail
Remark
RP Replace
CH Change
RC Recond
S Service
OH Overhaul
BL Balancing
AL Alignment