al
W
ry
n da
u
Bo
"
10
Electrical
Level (+2'-0") room
l
Wal
UP
UP Level
(+2'-6")
n d ary Stair-1
Bou
Level
up (+1'-6")
10" Stair-2
Level
Level
(+1'-6")
(+1'-6")
Reception+Lounge
Level(+1'-3") Fire control room Locker
600 sq.ft
910 sq.ft
183 sq.ft
Level
(+1'-6") DN
all
2000 Amp LT, Level (+1'-6")
y W
1000 KVR PFI & GENERATOR
dar
FIRE PUMP HOUSE 2000 KVA TRANSFORMER PANEL AREA GENERATOR ROOM
u n Level (-11'-0")
Level (+0")
Bo
10"
UP
Level (+6") Level (+6")
B I C Y C L E P A R K I N G
Level (+2'-0") Level (+0")
r
10" Boundary Wall
o
DN DN
Level(+1'-6")
d
Level(+1'-6")
Ground Light
i
GRASS
r
6 ' W i d e C o r r i d o r
Stair-2
C o r r i d o r
(27'-2"X12'-4") Stair-3
o
(24'-10"X12'-4")
Ground Light
UP UP
C
Level (+2'-4")
GRASS
e
SDB/SERVER ROOM
(7'-7"X6'-8")
LIFT CORE-2
R O A D
(8'-8"X6'-6") Ground Light
W i d e
i
TOILET AREA
P A R K I N G
W
Ground Light
ELECTRICAL/
6 ' - 6 "
SERVER ROOM
'
(9'-11"X12'-0")
GENERAL STORE AREA TOILET
8
(19'-10"X47'-5")
R C C
Level (+0")
Ground Light
o
d
LOCKER ROOM
ACCESSORIES STORE DISPLAY/MEETING ROOM LOUNGE AND WAITING AREA
(27'-2"X30'-1") STORE AREA
i
AREA (17'-9"X33'-7") (24'-6"X22'-5")
(199'-0"X82'-3")
r
Ground Light
r
o
W I D E
C A R
C
Ground Light
Pebbles
6 ' W i d e C o r r i d o r
d
LIFT CORE-1 LIFT CORE-1 Ground Light
i
(12'-0"X13'-6") (14'-4"X13'-6")
Level (+1'-6")
2 0 '
'
Ground Light
FABRIC TRIMS AND Planter Box
Stair-1 8 INSPECTION AREA
(20'-5"X20'-2")
10" Boundary Wall
5 ' - 0 " W I D E P L A N T E R B O X
UP
UP 4 ' - 1 0 " W I D E P L A N T E R B O X Level (+0'-0")
Level (+1'-6") Stair-4
Level (+1'-6)
Toilet
LOADING & (39'-6"X11'-10") Ground Light
G R A S S Ground Light Ground Light
Level (+0'-0") Ground Light
G R A S S Ground Light
UNLOADING AREA
Guard room
Level (+6")
Utility room
UP UP DN
Level (+3'-6")
GH-2
P L A N T E R B O X Level (+1'-0")
Level (+3") Level (+3") Level (+6")
R C C R O A D
30' W I D E I N T E R N A L R C C R O A D TO YARN STORE SHED
T A N K
Ground Light
R O A D
Ground Light
S E P T I C
G R A S S
Ground Light
10" Boundary Wall
R C C
Ground Light
I N T E R N A L
Ground Light
1 9 0 m³ R A I N W A T E R
Ground Light
S I T E F O R F U T U R E E X T E N S I O N
T A N K (15'X45'X12')
W I D E
Ground Light
Security/
Access Control Room
30'
Ground Light
Change Change
room room
A L
C A N Ground Light
Inventory/
Waiting Space
5' S E
M I -
P A Level
V E (+1'-0")
D W A
L K
W A Level (+6")
Y
M
A
S
T
E
R
B
A
R
I
-
S
R
R O A D
E
E
C A
P
N A
L
U
R
A L
C A N
A P P R O A C H
R
O
A
D
PROJECT: SITE ADDRESS CLIENT ARCHITECTURAL CONSULTANT: ARCHITECT STRUCTURAL ENGINEER: PLUMBING ENGINEER: DRAWN BY: DRAWING TYPE NOTES: COPYRIGHT: ORIENTATION KEY PLAN DRAWING TITLE REVISION NO.
MAHTAB HUSSAIN SIDDIQUE S - 101 Engr.A.K.M. SAIFUL BARI (PEng) Architectural Proposal Drawing This architectural design drawing should be read The scale of Drawing First Submission : This drawing is owned by
PROPOSED MASTER PLAN FOR DAKKHIN VANGNAHATI, 01 03.06.21
VICTORIA INTIMATE LTD. SREEPUR, GAZIPUR, ..\..\..\..\..\..\MW3 logo.png
LIFE FELLOW FIEB-8374,
DMINB-CE-0011,
combined with the structural design drawing
during the construction phase.
is as shown Second Submission : MW3 Design+Partners .
Any unauthorized copying,
N SCALE
B.M. ANISUR RAHMAN R-133 ELECTRICAL ENGINEER: Drawing Submission Structural Presentation Drawing Read the drawing first Third Submission :
BANGLADESH. HAMS GROUP This drawing should be followed by an experienced changing & distribution of
GEO-LOCATION: House #29-31, (7th Floor), Road#08
CDA-0128
engineer on the site during construction phase,
prior to construction. Fourth Submission :
this drawing is strictly prohibited. 02 14.08.21
SHEET NO LD-01
Block:E, Niketon, Gulshan-1, Dhaka-1212
MEHEDI AMIN AA-239 Plumbing Construction Drawing otherwise this design drawing is not responsible for
Fifth Submission :
24.1942, 90.4580 MD. FAISHAL HASAN any type of improper construction work.
For any confusion please All other drawings before the last revised drawing © Unauthorized duplication TOTAL BUILT AREA
Tel:+88029840957 contact with us. is inapplicable for any action NOT IN SCALE
MD. RAKIBUL HASAN AH-402 MIEB-A-18446 Electrical For Approval is a violation of applicable laws 03 16.09.21
Website: mw3.com.bd The drawing is prepared as per client's program & site.