Kelana Putra received a total of 897,597 in income for the period of May 21, 2023 to June 20, 2023 from PT. ASIETEX SINAR INDOPRATAMA. This included 810,000 in salary and 26,000 in overtime pay. Kelana had a deduction of 61,597 for BPJS healthcare contributions, resulting in a total payment received of 836,000. Kelana was sick for 1 day and had 2 days of approved leave during this period. This payslip was generated and sent electronically to KELANA0077@GMAIL.COM on April 7, 2023 at 8:31.
Kelana Putra received a total of 897,597 in income for the period of May 21, 2023 to June 20, 2023 from PT. ASIETEX SINAR INDOPRATAMA. This included 810,000 in salary and 26,000 in overtime pay. Kelana had a deduction of 61,597 for BPJS healthcare contributions, resulting in a total payment received of 836,000. Kelana was sick for 1 day and had 2 days of approved leave during this period. This payslip was generated and sent electronically to KELANA0077@GMAIL.COM on April 7, 2023 at 8:31.
Kelana Putra received a total of 897,597 in income for the period of May 21, 2023 to June 20, 2023 from PT. ASIETEX SINAR INDOPRATAMA. This included 810,000 in salary and 26,000 in overtime pay. Kelana had a deduction of 61,597 for BPJS healthcare contributions, resulting in a total payment received of 836,000. Kelana was sick for 1 day and had 2 days of approved leave during this period. This payslip was generated and sent electronically to KELANA0077@GMAIL.COM on April 7, 2023 at 8:31.
Bagian : QC DPF C Periode :21-May-2023 s/d 20-Jun-2023 Golongan : M1 NIK / Nama :230610001 \KELANA PUTRA PTKP : TK0 PENDAPATAN : POTONGAN : Uang Saku : 810,000 BPJS T.kerja : 61,597 Lembur : 26,000 BPJS T.Kerja : 61,597
Total Pendapatan : 897,597 Total Potongan : 61,597
KETERANGAN : sakit : 1 L1 : 2.00
Harap tidak membalas email ini, slip ini dihasilkan secara elektronik, tidak diperlukan tanda tangan dan dikirimkan secara otomatis ke alamat email: KELANA0077@GMAIL.COM
Transfer Ke Rek. BCA 3780531974 Total Terima :836,000