Professional Documents
Culture Documents
CDM Prs 123
CDM Prs 123
1
Agenda
• Introduction
• Objective
• What, why and when to use a Time Impact Analysis (TIA)
• TIA Considerations
• TIA Process (TIA Timing: Prospective Vs. Retrospective)
• Concurrent Delays
• TIA Cost Considerations
• TIA from Subcontractors
• Summary
• Q/A
2
Objective
The objective of a this presentation is to inform staff on the
value and standard use of TIA in the firm, Specifically
highlight: