1-Always follow cable management procedure.
2-Hosekeeping to be done
Slip of material while lifting injury to person 1 4 4 PA 1 4 4
3-Area to be barricaded.
4-Right tools to inspected and use.
Unloading material
Implemented
3 outside Potroom near 1-Barricading and supervision by WG/PA/AO
entry 2-Area cleaned of obstruction.
Hit By Technological Vehicle Seriuos injury to workmen 1 3 3 PA 1 3 3
3-Swing area cleared of unauthoriseed entries.
4-Demarcate and cordon off work area.
Implemented
Cut from sharp edges Injury to workmen 1-Proper PPE's to be use for handling of materials. 2 1 2 PA 2 1 2
Electrocution/ Short circuit Seriuos injury to workmen 1- Welding connection should be given by AAP PA Implemented
due to electric shock E&I department inside potroom.
2- No body earthing & RCCB should be provided
for welding machine job should be done as per the
clearance given from operation side.
3- Daily checklist of welding machine should be
filled up before welding.
4-Adequate PPE's should be used by welder.
5- Only training and authorized person should be
engaged with the job.
6- Nonmagnetic safety shoes,Safety helmet,welding
apron with leg & elbow guard , face shield ,HF
cartridge type nose mask,leather handgloves for
welidng should be provided.
7-All activity should be carried out in presence of
proper supervision.
8-During up/down movement the bucket locking
valve should be closed after placement to prevent
fall hazard due the unstable movement of bucket.
Also proper training must be given for usage of
bucket.
SN Basic step of the Job Hazard(s) associated with the step Existing control measure to mitigate hazard Existing / Base Additional control measure Responsible Implementation Residual Risk
Impact Risk Official to Status
P S Risk implement P S Risk
Electrocution/ Short circuit Seriuos injury to workmen 9- Only insulated tools must be used for the job. PA Implemented
due to electric shock 10- All job must be carried out with the cordination
of operation team only.
11-Welding return path should done through
welding cable only and it shold be continued up to
the job (Fixed in 3 Mtr Distance)
12 -Training on hot and height work,Usages of
PPE's should be provided.
13-Display board of work at height in progress at
boath end must be ensured.
14-Emergency contact no are FIRE-8018043000,
1 4 4 1 4 4
AMBULANCE-8018043300 in case of emergency all
should assemble near emergency assembly point.
15- Poly carbo shocket should be provided.
16-Dadicated fire watcher should be available with
fire extinguisher.
17- No one will be standing inside the barricaded
area and below the welding area during the
welding job.
1.Slip and trip Workman 1.Unwanted materials to be removed from height 1 2 2 PA Implemented 1 2 2
2.Poor housekeeping basis.
8 Housekeeping 3.Falling objects 2.Unwanted materials to be removed from work
place.