WORK EXECUTION PLAN

Installation Fire Fighting Pipe At Cliff


WORK PLAN

BY PT KRAKATAU DAYA LISTRIK


Method Of Works
1. Preparation Works
➢ Install Temporary support from scaffolding
➢ Prepare base crane 50T from sheet metal
➢ Loading & Unloading pipe 10” fire fighting to work area ( AIS Area )
➢ Install permanent support of pipe at foundation
➢ Prepare lifting gear such as chain block and wire sling/sling belt for
➢ Prepare 12 metres pipe 10” length of Fire Fighting Pipes

2. Construction Works
➢ Scaffolding Plan for temporary support and Sleeper Pipe
Method Of Works
Method Of Works

➢ Tie up pipe ( Double choker ) with sling belt 45 ➢ Tie up pipe with chain block ( 2-3 points ) that already prepared
degrees. Make sure inside of pipe already clean and before at temporary support. Using double chocker method for tie
blowed. Stringing fire fighting pipe using crane 50T up the pipe for preventation pipe slide down. Release the hook of
and put it slowly and careful on support of pipe. crane and the pipe already hold by chain block.
Method Of Works

➢ Slowly release the chain blocks together and pipe will slide down. Please make sure, when pipe slide down there are people will
choose as guide man to control the pipe moved. This method will continue until pipe reach the elevation.
Method Of Works

➢ Doing this method for remaining pipe line. When second pipe already at positioning, please welding the joint and continued to
next pipe.
Mobile crane 50 ton Boom truck
Load chart crane 50 ton
Plate 1200X6000X10

Fence

272
50
R20
000
SWL Point: Crane 50 ton
Boom length : 27,25 m
Max radius : 20 m
El.+27,962 SWL Manufaktur :3 Ton

Load calculation
Spool pipe FF Material Weigth : 0,75 Ton
Spool pipe FF Mobile crane 50 ton Multyply Factor : 1,05 Ton
Pipe sleeper Fence
El.+21,416 Pipe sleeper Weigth : 0,79 Ton
Lifting appliance weigth (Wa) : 0,1 Ton
Weigth of hook (Wh) : 0,6 Ton
Weigth of aux.hook (Wah) : 0 Ton
Other (Wot) : 0 Ton
Safety factor (Fs) : 2

Total weigth of load (Wt) : 1,48 Ton


El.+14,773 Utilization Rate : 49,3 %

Allowable : yes

20000
El.+8,080

Top view Side view


Scale 1:300 Scale 1:250
Mobile crane 50 ton
Mobile crane 50 ton
Plate
1200X6000X10
Webbing sling 3 ton Webbing sling 3 ton
6000

1250 6000 6000 Webbing sling 3 ton


Plate 1200X6000X10
Chain block
Mobile crane 50 ton (Adjustable)
Shackle 3 ton Spool pipe FF
6000

2580 Webbing sling 3 ton


Plate 1200X6000X10 Spool pipe FF

Plate laying Arangement sling


2580 Scale 1:20 Scale 1:200

Rigging & lifting plan pipe FF at stiff


El.+27,962

Detail-2
Ladder scaffold
El.+21,416 (existing)

Detail-1

El.+14,773
B
Spool pipe Spool pipe
Scaffolding, 600 C
temporary support

480
750
Pipe sleeper
El.+8,080

200
Concrete
H beam 200x200

Detail - 2
Scale 1:50

3000 6100 6700 8000


Top view
Side view Scale 1:300
Scale 1:300 A Ladder scaffold Spool pipe
(existing)

Pipa scaffold Ashiba 1200x250


Pipa scaffold Teflon sheet
thk 6 mm
Clamp scaffold H beam 200x200
H beam 200x200
1600

Teflon sheet
2000
500 800

thk 6 mm
Chain block 3 ton Ashiba 1200x250 Concrete
Base plate
Spool pipe
Pipe sleeper 1250 Concrete

Potongan - C
Scale 1:25

Potongan - B
Scale 1:25
Detail - 1
Scale 1:75 Potongan - A
Scale 1:75
Scaffolding plan & detail sleeper pipe
2. 3.
1.
S-11

Chain block
S-12

S-11

Webbing sling
Chain block
Wire sling
Chain block S-10

Spool pipe
Webbing sling
S-11 Spool pipe
Chain block
S-10
Chain block
Webbing sling

S-9

Chain block

1. transfer the pipe used crane 50 ton to position


2. pick up the pipe with chain block 3 ton

4. 5. 6.
Chain block
S-10
S-10
Chain block
Spool pipe Webbing sling
S-9

Spool pipe

Webbing sling
Chain block Chain block

S-9 Webbing sling Webbing sling


S-9
Spool pipe
S-8

Webbing sling

3000 6100

Simulation instalation pipe FF with sliding methode