Transmission Line Anchor Chainage from X_UTM Y_UTM Bed Level

Right Bank, m (mPWD)

TL-1 (Jamuna) 1 0 778164.5 2699234 12.69


2 400.39 778564.7 2699246 11.63
3 1242.79 779406.7 2699272 9.5
4 2090.21 780253.8 2699298 12.29
5 2920.84 781084 2699323 6.71
6 3746.62 781909.4 2699348 4.98
7 4575.5 782737.9 2699374 5.23
8 5324.61 783486.7 2699397 4.43
9 6101.2 784262.9 2699420 -5.94
10 6853.32 785014.7 2699443 Main land
11 7264.02 785425.2 2699456 Main land
TL-2 (Jamuna) 1 0 778217 2698441 12.16
2 353.69 778569.5 2698470 12.37
3 1128.83 779342.2 2698531 11.77
4 1961.5 780172.2 2698597 10.68
5 2804.8 781012.9 2698665 12.81
6 3679.93 781885.2 2698734 5.64
7 4499.42 782702.1 2698799 7.92
8 5311.52 783511.6 2698864 7.15
9 6118.7 784316.3 2698928 -15.09
10 6863.77 785059 2698987 Main land
11 7263.89 785457.8 2699019 Main land
Bed Level
(MSL)

12.23
11.17
9.04
11.83
6.25
4.52
4.77
3.97
-6.4
Main land
Main land
11.7
11.91
11.31
10.22
12.35
5.18
7.46
6.69
-15.55
Main land
Main land