You are on page 1of 3

PT.

BERKAH MANIS MAKMUR


No. Dok. F/EC/01-02
FORM No. Rev. 00
Tgl. Eff. 06 September 2022
BILL OF QUANTITY (BOQ) Halaman 1 dari 1

Document Number : -
Work Request Number : - Job Location : Cikande
Section : WFG Drawing Name :-
Job name : Pekerjaan Box Culvert Pre-Cast WIKA Drawing Number :-

Material Labor Cost


No. Item Name Specification Qty Unit Remarks
Price/Unit Total Price Price/Unit Total Price
A PEKERJAAN BOX CULVERT TYPE 1 (AREA DEPAN)
1 Pekerjaan Galian Termasuk heavy equipment 31.25 m3 Rp - Rp -
2 Urugan pasir tebal 10 cm 1.25 m3 Rp - Rp -
3 Box Culvert Pre-Cast Spesial for load 60 Ton Clear Size 2.00 x 2.00 m Ex. Wika 5.00 unit Rp - Rp -
4 Install & Handling Pemasangan Box Culvert 1.00 ls Rp - Rp -
5 Pelat jembatan beton K-300 tebal 25 cm Size 5 m x 8 m x 0.25 m 10.00 m3 Rp - Rp -
6 Tulangan jembatan DB 13 Ex. Master steel ulir SNI 417.44 kg Rp - Rp -
7 Bekisting / perancah 4.00 m2 Rp - Rp -
8 Struktur Bore Pile Ꝋ50 Deep 12 m
- Setting & moving drill equipment 6.00 titik Rp - Rp -
- Drilling borepile Dia. 50 cm, Deep 12 m 72.00 m' Rp - Rp -
- Bobok kepala tiang borepile 6.00 titik Rp - Rp -
- Tulangan DB16 Ex. Master steel ulir SNI 1,024.42 kg Rp - Rp -
- Tulangan DB10 Ex. Master steel ulir SNI 473.71 kg Rp - Rp -
- Ready Mix Mutu K-350 14.13 m3 Rp - Rp -
9 Pilecap / Plate dudukan Box tebal 20 cm
- Tulangan DB10 Ex. Master steel ulir SNI 161.75 kg Rp - Rp -
- Ready Mix Mutu K-350 3.00 m3 Rp - Rp -
- Bekisting / Perancah 2.00 m2 Rp - Rp -
10 Urugan pasir kanan - kiri tebal 1 m 12.50 m3 Rp - Rp -
Sub Total Rp - Rp - Rp -
B PEKERJAAN BOX CULVERT TYPE 2 (AREA SAMPING KIRI)
1 Pekerjaan Galian (Pelebaran sungai sisi depan) Termasuk heavy equipment 332.74 m3 Rp - Rp -
2 Pekerjaan Levelling & Embankment Termasuk heavy equipment 493.69 m2 Rp - Rp -
3 Urugan pasir tebal 10 cm 40.88 m3 Rp - Rp -
4 Box Culvert Pre-Cast Spesial for load 60 Ton Clear Size 2.00 x 2.00 m Ex. Wika 13.00 unit Rp - Rp -
5 Box Culvert Pre-Cast Clear Size 2.00 x 2.00 m Ex. Wika 144.00 unit Rp - Rp -
Elbow Box Culvert Custom, termasuk conecting dgn Box culvert existing
6 Tulangan DB10 & Ready Mix K-350 43.20 m3 Rp - Rp -
BMM
7 Install & Handling Pemasangan Box Culvert Mobile Crane 1.00 ls Rp - Rp -
8 Struktur Bore Pile Ꝋ50 Deep 12 m
- Setting & moving drill equipment 110 titik Rp - Rp -
- Drilling borepile Dia. 50 cm, Deep 12 m 1,315.20 m' Rp - Rp -
- Bobok kepala tiang borepile 109.60 titik Rp - Rp -
- Tulangan DB16 Ex. Master steel ulir SNI 18,781.09 kg Rp - Rp -
- Tulangan DB10 Ex. Master steel ulir SNI 8,684.71 kg Rp - Rp -
- Ready Mix Mutu K-350 258.11 m3 Rp - Rp -
9 Pilecap / Plate dudukan Box tebal 20 cm Rp - Rp -
- Tulangan DB10 Ex. Master steel ulir SNI 8,121.36 kg Rp - Rp -
- Ready Mix Mutu K-350 98.64 m3 Rp - Rp -
- Bekisting / Perancah 71.76 m2 Rp - Rp -
10 Concrete Pump estimasi 7 tahap pengecoran 7.00 tahap Rp - Rp -
11 Urugan pasir kanan - kiri - atas tebal 1 m 731.58 m3 Rp - Rp -
Sub Total Rp - Rp - Rp -
Total Rp - Rp -
Total material cost, equipment and labor (Rp.) Rp -
Engineer Inspector Approver Approver

Date : Date : Date : Date :


Name : Name : Name : Name :
PT B
EX ST N L S
-C
E
C S E
B C
A
L
B C
B C
T L
S L T

D D

R
C B C
E R
W

E
B C N
S A
C R C

S
E B C
S L T E

B B

DENAH BOX CULVERT PRE-CAST ARS


S ALA -
A A

You might also like