Professional Documents
Culture Documents
Prior to any installation, it is necessary to visually check the accumulator in order to detect any possible damage
incurred during transport. For optimal operation, the accumulator needs to be located as close as possible to the
<application>. It may be installed vertically, gas valve facing up, or horizontally.
Ma int enance
Any intervention, maintenance,
4
repair must be carried out by a
qualified and trained personnel. 3