Professional Documents
Culture Documents
Manito-PRDP-Profile New Source
Manito-PRDP-Profile New Source
PIPELINE ELEVATION
STATIONING
S
PROVINCE OF ALBAY
W
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
DEVELOPMENT PROJECT
346.06 342.57 341.07
MUNICIPALITY OF MANITO
345.74 337.07 337.98
PROJECT TITLE:
NGL
HGL
MANITO, ALBAY
CONSTRUCTION OF LEVEL II
343.18 329.27 330.18
SHEET CONTENT :
341.58 310.26 311.17
N
JOVANNE A. DAZAL
" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.
PIPE
HGL
E S
333.27 311.39 312.30
W
END OF 6" DIA. HDPE PIPE AND
S
START OF 6" DIA. GI PIPE S-40 AT
RCBC CROSSING
N
E
PROPOSED
WATER TREATMENT FACILITY
AND RESERVOIR (B)
PIPE
STATIONING
332.63 308.02 308.93
PIPELINE ELEVATION
PIPELINE ELEVATION
STATIONING
303.04303.04 303.95
PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
302.72301.91 302.82
DEVELOPMENT PROJECT
NATURAL GRADE ELEVATION
MUNICIPALITY OF MANITO
302.08300.41 301.32
301.76298.51 299.42
301.44296.99 297.90
PROJECT TITLE:
300.80294.73 295.64
300.48293.36 294.27
300.16292.72 293.63
1
Install 1 unit 16
299.84291.78 292.69
MANITO, ALBAY
CONSTRUCTION OF LEVEL II
299.52290.10 291.01
299.20287.67 288.58
PIPE
NGL
HGL
298.88287.33 288.24
298.56287.42 288.33
298.24288.22 289.13
1
Install 1 unit 16
SHEET CONTENT :
297.92289.94 290.85
297.60291.88 292.79
297.28293.27 294.18
" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.
296.01293.84 294.75
PREPARED BY :
295.69292.79 293.70
295.37291.64 292.55
ENGINEERING ASSISTANT
JOVANNE A. DAZAL
295.05290.03 290.94
294.73289.60 290.51
294.41289.39 290.30
CHECKED BY:
294.09289.27 290.18
293.77288.45 289.36
MUNICIPAL ENGINEER
ENGR. LOUIE VIC O. LUNA
293.45287.46 288.37
293.13285.92 286.83
S
W
292.81284.16 285.07 E
N
292.49283.14 284.05
RECOMMENDING APPROVAL:
292.17282.55 283.46
MPDC/MPMIU HEAD
291.85282.84 283.75
ENGR. DINDO L. ABELLANO
291.53283.34 284.25
NGL
PIPE
291.21284.08 284.99
APPROVED BY:
HGL
290.89284.55 285.46
290.57284.74 285.65
290.25284.88 285.79
MUNICIPAL MAYOR
289.93284.99 285.90
MAYOR JOSHUA MARI C. DAEP
289.61285.05 285.96
289.29285.33 286.24
7
45
288.97285.66 286.57
SHEET NO.
288.65286.00 287.01
HORIZONTAL: 1:1000 Meters
VERTICAL: 1: 250 Meters
SCALE:
SECTION B-B1
PIPELINE ELEVATION
STATIONING
289.29285.33 286.24
PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
DEVELOPMENT PROJECT
288.97285.66 286.57
MUNICIPALITY OF MANITO
288.65286.00 287.01
288.33286.00 288.96
287.69286.00 291.16
PROJECT TITLE:
287.37286.00 291.56
287.05286.00 289.78
286.73286.00 287.81
286.41284.89 285.80
MANITO, ALBAY
NGL
CONSTRUCTION OF LEVEL II
PIPE
286.09283.07 283.98
HGL
285.45280.87 281.78 S
W
285.13279.91 280.82 E
N
284.81279.23 280.14
SHEET CONTENT :
284.49278.57 279.48
284.17277.92 278.83
283.85277.70 278.61
PLAN AND PROFILE
283.54277.64 278.55
283.22277.69 278.60
282.90277.66 278.57
282.58276.91 277.82
PREPARED BY :
282.26275.81 276.72
281.94274.64 275.55
ENGINEERING ASSISTANT
JOVANNE A. DAZAL
CWP=175 PSI
281.62274.25 275.16
281.30275.21 276.12
Combination Valve w/ 1" inlet;
280.98275.55 276.46
CHECKED BY:
Install 1 unit 5/64" dia.Orifice Air/Vacuum
280.66277.65 278.56
MUNICIPAL ENGINEER
280.34277.92 278.83
ENGR. LOUIE VIC O. LUNA
280.02277.22 278.13
279.70275.79 276.70
NGL
PIPE
279.38274.53 275.44
HGL
279.06273.28 274.19
RECOMMENDING APPROVAL:
278.74271.76 272.67
MPDC/MPMIU HEAD
S
E W
ENGR. DINDO L. ABELLANO
278.42270.21 271.12
N
278.10268.98 269.89
277.78267.30 268.21
APPROVED BY:
277.46264.97 265.88
277.14262.16 263.07
276.82259.85 260.76
MUNICIPAL MAYOR
276.50257.77 258.68
MAYOR JOSHUA MARI C. DAEP
276.18255.70 256.61
275.86254.07 254.98
8
45
275.54252.97 253.88
SHEET NO.
VERTICAL: 1: 250 Meters
HORIZONTAL: 1:1000 Meters
SCALE:
SECTION B-B1
PIPELINE ELEVATION
STATIONING
275.54252.97 253.88
PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
DEVELOPMENT PROJECT
275.22251.62 252.53
MUNICIPALITY OF MANITO
274.90249.62 250.53
274.58247.68 248.59
273.94244.81 245.72
PROJECT TITLE:
273.62243.59 244.50
NGL
273.30243.00 243.91
PIPE
HGL
272.98242.71 243.62
272.66241.83 242.74
MANITO, ALBAY
CONSTRUCTION OF LEVEL II
272.34239.95 240.86
271.70239.02 239.93
S
271.38239.04 239.95
E W
271.06238.66 239.57
N
SHEET CONTENT :
270.74237.42 238.33
270.43236.31 237.22
270.11236.12 237.03
PLAN AND PROFILE
269.79236.18 237.09
269.47236.45 237.36
Install 1 unit 2" dia. Blow-off Valve
269.15236.34 237.25
268.83236.13 237.04
PREPARED BY :
268.51234.94 235.85
268.19234.17 235.08
ENGINEERING ASSISTANT
JOVANNE A. DAZAL
267.87232.58 233.49
267.55231.09 232.00
CHECKED BY:
267.23229.81 230.72
266.91228.48 229.39
MUNICIPAL ENGINEER
266.59226.85 227.76
ENGR. LOUIE VIC O. LUNA
266.27225.48 226.39
265.95225.30 226.21
265.63223.23 224.14
RECOMMENDING APPROVAL:
265.31223.93 224.84
Install 1 unit 2" dia. Blow-off Valve
264.99227.04 227.95
MPDC/MPMIU HEAD
ENGR. DINDO L. ABELLANO
264.67229.81 230.72
264.35226.16 227.07
264.03219.70 220.61
APPROVED BY:
263.71219.48 220.39
263.39219.25 220.16
263.07219.42 220.33
MUNICIPAL MAYOR
262.75219.29 220.20
MAYOR JOSHUA MARI C. DAEP
262.43219.86 220.77
262.11218.84 219.75
9
45
SHEET NO.
261.79217.76 218.67
HORIZONTAL: 1:1000 Meters
VERTICAL: 1: 250 Meters
SCALE:
SECTION B-B1
PIPELINE ELEVATION
STATIONING
262.75219.29 220.20
PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
DEVELOPMENT PROJECT
262.43219.86 220.77
MUNICIPALITY OF MANITO
262.11218.84 219.75
261.79217.76 218.67
261.15216.33 217.24
PROJECT TITLE:
260.83215.79 216.70
260.51215.26 216.17
260.19215.34 216.25
259.87215.68 216.59
MANITO, ALBAY
CONSTRUCTION OF LEVEL II
259.55215.95 216.86
258.91213.12 214.03
NGL
258.59210.90 211.81
PIPE
HGL
258.27207.81 208.72
SHEET CONTENT :
257.95204.53 205.44 S
257.64201.84 202.75
E
W
257.32199.25 200.16 N
PLAN AND PROFILE
257.00196.76 197.67
256.68195.66 196.57
256.36195.20 196.11
256.04192.03 192.94
PREPARED BY :
255.72191.32 192.23
255.40190.75 191.66
ENGINEERING ASSISTANT
JOVANNE A. DAZAL
255.08190.21 191.12
254.76189.69 190.60
254.44189.26 190.17
CHECKED BY:
254.12188.80 189.71
Install 1 unit 2" dia. Blow-off Valve
S
MUNICIPAL ENGINEER
E
253.80187.98 188.89
ENGR. LOUIE VIC O. LUNA
Install 1 unit 2" dia. Blow-off Valve
W
253.48187.82 188.73
N
253.16188.90 189.81
252.84190.56 191.47
252.52193.04 193.95
RECOMMENDING APPROVAL:
252.20195.52 196.43
MPDC/MPMIU HEAD
ENGR. DINDO L. ABELLANO
251.88197.92 198.83
S
251.56198.88 199.79 W
N
251.24198.42 199.33
APPROVED BY:
250.92197.26 198.17
250.60195.92 196.83
250.28195.11 196.02
MUNICIPAL MAYOR
249.96194.00 194.91
MAYOR JOSHUA MARI C. DAEP
249.64192.75 193.66
249.32192.20 193.11
10
45
SHEET NO.
249.00191.88 192.79
BPT
B1
W
W
S
N
S
N
E
E
SECTION B-B1
HGL
BREAK
PRESSURE
TANK (B1)
NGL
SCALE:
VERTICAL: 1: 250 Meters PIPE
HORIZONTAL: 1:1000 Meters
STATIONING
244.53199.23 200.14
244.21199.91 200.82
243.89200.27 201.18
243.57201.05 201.96
243.25202.59 203.50
242.93204.14 205.05
242.61205.76 206.67
242.29207.40 208.31
241.97209.15 210.06
241.65210.91 211.82
241.33212.73 213.64
241.01213.39 214.30
240.69213.52 214.43
213.60213.60 214.51
249.96194.00 194.91
249.64192.75 193.66
249.32192.20 193.11
249.00191.88 192.79
248.68191.67 192.58
248.36191.33 192.24
248.04191.16 192.07
247.72191.63 192.54
247.40192.65 193.56
247.08192.95 193.86
246.76193.19 194.10
246.44193.38 194.29
246.12193.42 194.33
245.80193.77 194.68
245.48194.65 195.56
245.16196.47 197.38
244.84198.29 199.20
NATURAL GRADE ELEVATION
PIPELINE ELEVATION