You are on page 1of 7

HORIZONTAL: 1:1000 Meters

VERTICAL: 1: 250 Meters


SCALE:
SECTION A-B
STRUCTURE (A)
PROPOSED INTAKE
E

PIPELINE ELEVATION
STATIONING
S

346.38 346.38 344.88

HYDRAULIC GRADE LINE

PROVINCE OF ALBAY
W

PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES

DEVELOPMENT PROJECT
346.06 342.57 341.07

NATURAL GRADE ELEVATION

MUNICIPALITY OF MANITO
345.74 337.07 337.98

345.42 335.75 336.66

C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg


345.10 333.00 333.91

344.78 332.20 330.70

PROJECT TITLE:
NGL
HGL

344.46 333.32 331.82


PIPE
HGL

344.14 332.75 333.66

343.82 331.73 332.64

343.50 330.73 331.64

MANITO, ALBAY
CONSTRUCTION OF LEVEL II
343.18 329.27 330.18

WATER SYSTEM FOR THE EASTERN BRGYS. OF


342.86 326.20 327.11

342.54 322.45 323.36

342.22 319.13 320.04

341.90 314.28 315.19


S
W

SHEET CONTENT :
341.58 310.26 311.17
N

341.26 305.91 306.82

340.94 301.06 301.97


PLAN AND PROFILE

340.62 297.56 298.47

340.30 293.40 294.31

339.98 292.85 293.76


1
Install 1 unit 16

339.67 291.42 292.33


PREPARED BY :

339.35 289.44 290.35


NGL
PIPE

339.03 288.26 289.17


ENGINEERING ASSISTANT
HGL

JOVANNE A. DAZAL
" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.

338.71 288.39 289.30

338.39 289.19 290.10

338.07 291.18 292.09


CHECKED BY:

337.75 293.30 294.21


MUNICIPAL ENGINEER

337.43 294.03 294.94


ENGR. LOUIE VIC O. LUNA

337.11 295.94 296.85

336.79 298.20 299.11

336.47 301.56 301.56


1
Install 1 unit 16

336.15 303.72 304.63


RECOMMENDING APPROVAL:

335.83 307.70 308.61


MPDC/MPMIU HEAD

335.51 311.90 312.81


ENGR. DINDO L. ABELLANO
NGL
" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.

PIPE
HGL

335.19 315.09 316.00

334.87 313.94 314.85


APPROVED BY:

334.55 314.92 315.83

334.23 315.85 316.76

333.91 314.76 315.67


MUNICIPAL MAYOR

333.59 313.36 314.27


MAYOR JOSHUA MARI C. DAEP

E S
333.27 311.39 312.30

332.95 309.99 310.90


N W
5
45

332.63 308.02 308.93


SHEET NO.

332.31 306.73 307.64


Install 1 unit 2" dia. Blow-off Valve

END OF 6" DIA. GI PIPE S-40 AND


START OF 6" DIA. HDPE PIPE AT
RCBC CROSSING

W
END OF 6" DIA. HDPE PIPE AND

S
START OF 6" DIA. GI PIPE S-40 AT
RCBC CROSSING

N
E
PROPOSED
WATER TREATMENT FACILITY
AND RESERVOIR (B)

SECTION A-B HGL

NGL Install 1 unit 2" dia. Blow-off Valve

PIPE

END OF 6" DIA. HDPE PIPE AND


START OF 6" DIA. GI PIPE S-40 AT END OF 6" DIA. GI PIPE S-40 AND
RCBC CROSSING START OF 6" DIA. HDPE PIPE AT
RCBC CROSSING
SCALE:
VERTICAL: 1: 250 Meters
HORIZONTAL: 1:1000 Meters

STATIONING
332.63 308.02 308.93

330.71 304.62 305.53

330.39 303.52 304.43

330.07 303.14 304.05

329.11 299.54 300.45

324.96 299.74 300.65


324.91 307.95 303.95
333.59 313.36 314.27

331.03 303.48 304.39

329.75 302.70 303.61

329.43 301.97 302.88

328.79 297.44 298.35

328.47 295.54 296.45

328.15 293.08 293.99

327.51 288.71 289.62

326.56 291.37 291.37

326.24 293.81 293.81

325.60 295.01 295.92

325.28 297.81 298.72


333.27 311.39 312.30

332.95 309.99 310.90

332.31 306.73 307.64

331.99 308.29 309.20

331.67 306.89 307.80

331.35 304.85 305.76

327.83 290.85 291.76

327.19 287.25 288.16

326.88 286.39 287.30

325.92 294.25 295.16


NATURAL GRADE ELEVATION

PIPELINE ELEVATION

HYDRAULIC GRADE LINE


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENT : PREPARED BY : CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
PHILIPPINE RURAL
DEVELOPMENT PROJECT
C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg
CONSTRUCTION OF LEVEL II
6
MUNICIPALITY OF MANITO WATER SYSTEM FOR THE EASTERN BRGYS. OF PLAN AND PROFILE
PROVINCE OF ALBAY MANITO, ALBAY JOVANNE A. DAZAL ENGR. LOUIE VIC O. LUNA ENGR. DINDO L. ABELLANO MAYOR JOSHUA MARI C. DAEP 45
ENGINEERING ASSISTANT MUNICIPAL ENGINEER MPDC/MPMIU HEAD MUNICIPAL MAYOR
HORIZONTAL: 1:1000 Meters
VERTICAL: 1: 250 Meters
SCALE:
SECTION B-B1

PIPELINE ELEVATION
STATIONING
303.04303.04 303.95

HYDRAULIC GRADE LINE

PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES
302.72301.91 302.82

DEVELOPMENT PROJECT
NATURAL GRADE ELEVATION

MUNICIPALITY OF MANITO
302.08300.41 301.32

301.76298.51 299.42

301.44296.99 297.90

C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg


301.12295.75 296.66

PROJECT TITLE:
300.80294.73 295.64

300.48293.36 294.27

300.16292.72 293.63
1
Install 1 unit 16

299.84291.78 292.69

MANITO, ALBAY
CONSTRUCTION OF LEVEL II
299.52290.10 291.01

299.20287.67 288.58

WATER SYSTEM FOR THE EASTERN BRGYS. OF


" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.

PIPE
NGL
HGL

298.88287.33 288.24

298.56287.42 288.33

298.24288.22 289.13
1
Install 1 unit 16

SHEET CONTENT :
297.92289.94 290.85

297.60291.88 292.79

297.28293.27 294.18
" dia. Orifice Air Release Valve
w/ 1" Inlet; CWP=175 psi.

PLAN AND PROFILE


S
296.96294.34 295.25
E
296.64294.62 295.53
W
N
296.33294.37 295.28

296.01293.84 294.75
PREPARED BY :

295.69292.79 293.70

295.37291.64 292.55
ENGINEERING ASSISTANT
JOVANNE A. DAZAL

295.05290.03 290.94

294.73289.60 290.51

294.41289.39 290.30
CHECKED BY:

294.09289.27 290.18

293.77288.45 289.36
MUNICIPAL ENGINEER
ENGR. LOUIE VIC O. LUNA

293.45287.46 288.37

293.13285.92 286.83
S
W
292.81284.16 285.07 E
N
292.49283.14 284.05
RECOMMENDING APPROVAL:

292.17282.55 283.46
MPDC/MPMIU HEAD

291.85282.84 283.75
ENGR. DINDO L. ABELLANO

291.53283.34 284.25
NGL

PIPE

291.21284.08 284.99
APPROVED BY:
HGL

290.89284.55 285.46

290.57284.74 285.65

290.25284.88 285.79
MUNICIPAL MAYOR

289.93284.99 285.90
MAYOR JOSHUA MARI C. DAEP

289.61285.05 285.96

289.29285.33 286.24
7
45

288.97285.66 286.57
SHEET NO.

288.65286.00 287.01
HORIZONTAL: 1:1000 Meters
VERTICAL: 1: 250 Meters
SCALE:
SECTION B-B1

PIPELINE ELEVATION
STATIONING
289.29285.33 286.24

HYDRAULIC GRADE LINE

PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES

DEVELOPMENT PROJECT
288.97285.66 286.57

NATURAL GRADE ELEVATION

MUNICIPALITY OF MANITO
288.65286.00 287.01

288.33286.00 288.96

C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg


288.01286.00 290.24

287.69286.00 291.16

PROJECT TITLE:
287.37286.00 291.56

287.05286.00 289.78

286.73286.00 287.81

286.41284.89 285.80

MANITO, ALBAY
NGL

CONSTRUCTION OF LEVEL II
PIPE
286.09283.07 283.98
HGL

WATER SYSTEM FOR THE EASTERN BRGYS. OF


285.77281.83 282.74

285.45280.87 281.78 S
W
285.13279.91 280.82 E
N
284.81279.23 280.14

SHEET CONTENT :
284.49278.57 279.48

284.17277.92 278.83

283.85277.70 278.61
PLAN AND PROFILE

283.54277.64 278.55

283.22277.69 278.60

282.90277.66 278.57

282.58276.91 277.82
PREPARED BY :

282.26275.81 276.72

281.94274.64 275.55
ENGINEERING ASSISTANT
JOVANNE A. DAZAL
CWP=175 PSI

281.62274.25 275.16

281.30275.21 276.12
Combination Valve w/ 1" inlet;

280.98275.55 276.46
CHECKED BY:
Install 1 unit 5/64" dia.Orifice Air/Vacuum

280.66277.65 278.56
MUNICIPAL ENGINEER

280.34277.92 278.83
ENGR. LOUIE VIC O. LUNA

280.02277.22 278.13

279.70275.79 276.70
NGL

PIPE

279.38274.53 275.44
HGL

279.06273.28 274.19
RECOMMENDING APPROVAL:

278.74271.76 272.67
MPDC/MPMIU HEAD

S
E W
ENGR. DINDO L. ABELLANO

278.42270.21 271.12
N
278.10268.98 269.89

277.78267.30 268.21
APPROVED BY:

277.46264.97 265.88

277.14262.16 263.07

276.82259.85 260.76
MUNICIPAL MAYOR

276.50257.77 258.68
MAYOR JOSHUA MARI C. DAEP

276.18255.70 256.61

275.86254.07 254.98
8
45

275.54252.97 253.88
SHEET NO.
VERTICAL: 1: 250 Meters
HORIZONTAL: 1:1000 Meters
SCALE:
SECTION B-B1

PIPELINE ELEVATION
STATIONING
275.54252.97 253.88

HYDRAULIC GRADE LINE

PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES

DEVELOPMENT PROJECT
275.22251.62 252.53

NATURAL GRADE ELEVATION

MUNICIPALITY OF MANITO
274.90249.62 250.53

274.58247.68 248.59

C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg


274.26246.13 247.04

273.94244.81 245.72

PROJECT TITLE:
273.62243.59 244.50

NGL
273.30243.00 243.91

PIPE
HGL

272.98242.71 243.62

272.66241.83 242.74

MANITO, ALBAY
CONSTRUCTION OF LEVEL II
272.34239.95 240.86

WATER SYSTEM FOR THE EASTERN BRGYS. OF


272.02239.40 240.31

271.70239.02 239.93
S

271.38239.04 239.95
E W
271.06238.66 239.57
N

SHEET CONTENT :
270.74237.42 238.33

270.43236.31 237.22

270.11236.12 237.03
PLAN AND PROFILE

269.79236.18 237.09

269.47236.45 237.36
Install 1 unit 2" dia. Blow-off Valve

269.15236.34 237.25

268.83236.13 237.04
PREPARED BY :

268.51234.94 235.85

268.19234.17 235.08
ENGINEERING ASSISTANT
JOVANNE A. DAZAL

267.87232.58 233.49

267.55231.09 232.00
CHECKED BY:

267.23229.81 230.72

266.91228.48 229.39
MUNICIPAL ENGINEER

266.59226.85 227.76
ENGR. LOUIE VIC O. LUNA

266.27225.48 226.39

265.95225.30 226.21

265.63223.23 224.14
RECOMMENDING APPROVAL:

265.31223.93 224.84
Install 1 unit 2" dia. Blow-off Valve

264.99227.04 227.95
MPDC/MPMIU HEAD
ENGR. DINDO L. ABELLANO

264.67229.81 230.72

264.35226.16 227.07

264.03219.70 220.61
APPROVED BY:

263.71219.48 220.39

263.39219.25 220.16

263.07219.42 220.33
MUNICIPAL MAYOR

262.75219.29 220.20
MAYOR JOSHUA MARI C. DAEP

262.43219.86 220.77

262.11218.84 219.75
9
45
SHEET NO.

261.79217.76 218.67
HORIZONTAL: 1:1000 Meters
VERTICAL: 1: 250 Meters
SCALE:
SECTION B-B1

PIPELINE ELEVATION
STATIONING
262.75219.29 220.20

HYDRAULIC GRADE LINE

PROVINCE OF ALBAY
PHILIPPINE RURAL
REPUBLIC OF THE PHILIPPINES

DEVELOPMENT PROJECT
262.43219.86 220.77

NATURAL GRADE ELEVATION

MUNICIPALITY OF MANITO
262.11218.84 219.75

261.79217.76 218.67

C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg


261.47216.68 217.59

261.15216.33 217.24

PROJECT TITLE:
260.83215.79 216.70

260.51215.26 216.17

260.19215.34 216.25

259.87215.68 216.59

MANITO, ALBAY
CONSTRUCTION OF LEVEL II
259.55215.95 216.86

WATER SYSTEM FOR THE EASTERN BRGYS. OF


259.23215.08 215.99

258.91213.12 214.03
NGL

258.59210.90 211.81
PIPE
HGL

258.27207.81 208.72

SHEET CONTENT :
257.95204.53 205.44 S
257.64201.84 202.75
E
W
257.32199.25 200.16 N
PLAN AND PROFILE

257.00196.76 197.67

256.68195.66 196.57

256.36195.20 196.11

256.04192.03 192.94
PREPARED BY :

255.72191.32 192.23

255.40190.75 191.66
ENGINEERING ASSISTANT
JOVANNE A. DAZAL

255.08190.21 191.12

254.76189.69 190.60

254.44189.26 190.17
CHECKED BY:

254.12188.80 189.71
Install 1 unit 2" dia. Blow-off Valve

S
MUNICIPAL ENGINEER

E
253.80187.98 188.89
ENGR. LOUIE VIC O. LUNA
Install 1 unit 2" dia. Blow-off Valve

W
253.48187.82 188.73
N

253.16188.90 189.81

252.84190.56 191.47

252.52193.04 193.95
RECOMMENDING APPROVAL:

252.20195.52 196.43
MPDC/MPMIU HEAD
ENGR. DINDO L. ABELLANO

251.88197.92 198.83
S

251.56198.88 199.79 W
N
251.24198.42 199.33
APPROVED BY:

250.92197.26 198.17

250.60195.92 196.83

250.28195.11 196.02
MUNICIPAL MAYOR

249.96194.00 194.91
MAYOR JOSHUA MARI C. DAEP

249.64192.75 193.66

249.32192.20 193.11
10
45
SHEET NO.

249.00191.88 192.79
BPT
B1
W
W
S

N
S
N
E

E
SECTION B-B1
HGL

BREAK
PRESSURE
TANK (B1)

NGL

SCALE:
VERTICAL: 1: 250 Meters PIPE
HORIZONTAL: 1:1000 Meters

STATIONING

244.53199.23 200.14

244.21199.91 200.82

243.89200.27 201.18

243.57201.05 201.96

243.25202.59 203.50

242.93204.14 205.05

242.61205.76 206.67

242.29207.40 208.31

241.97209.15 210.06

241.65210.91 211.82

241.33212.73 213.64

241.01213.39 214.30

240.69213.52 214.43

213.60213.60 214.51
249.96194.00 194.91

249.64192.75 193.66

249.32192.20 193.11

249.00191.88 192.79

248.68191.67 192.58

248.36191.33 192.24

248.04191.16 192.07

247.72191.63 192.54

247.40192.65 193.56

247.08192.95 193.86

246.76193.19 194.10

246.44193.38 194.29

246.12193.42 194.33

245.80193.77 194.68

245.48194.65 195.56

245.16196.47 197.38

244.84198.29 199.20
NATURAL GRADE ELEVATION

PIPELINE ELEVATION

HYDRAULIC GRADE LINE


REPUBLIC OF THE PHILIPPINES PROJECT TITLE: SHEET CONTENT : PREPARED BY : CHECKED BY: RECOMMENDING APPROVAL: APPROVED BY: SHEET NO.
PHILIPPINE RURAL
DEVELOPMENT PROJECT
C:\Users\User\Documents\Newo\WATER SYSTEM\manito LOGO.jpg
CONSTRUCTION OF LEVEL II
MUNICIPALITY OF MANITO WATER SYSTEM FOR THE EASTERN BRGYS. OF PLAN AND PROFILE
PROVINCE OF ALBAY MANITO, ALBAY JOVANNE A. DAZAL ENGR. LOUIE VIC O. LUNA ENGR. DINDO L. ABELLANO MAYOR JOSHUA MARI C. DAEP 45
ENGINEERING ASSISTANT MUNICIPAL ENGINEER MPDC/MPMIU HEAD MUNICIPAL MAYOR

You might also like