Professional Documents
Culture Documents
NZEB Brochure v2 1
NZEB Brochure v2 1
guide to
NZEB
Effective solutions
to achieving NZEB
standard in Ireland www.xtratherm.ie
02 The NZEB Guide
Contents
3.
Xtratherm and the drive for NZEB
— NZEB Where we are
— NZEB Targets
6.
The Part L Performance Targets
— Prioritising the Fabric First Approach
— Thermal Bridging - The difference is in the detail
— Ventilation Strategy
— Secondary Heating
8.
Achieving NZEB Compliance for
Typical New Dwellings
— Detached: Scheme Development
— Semi-Detached: Scheme Development
— Apartment: Scheme Development
— Detached: Self Build
10.
Xtratherm product solutions to achieve NZEB
— CavityTherm CT/PIR — XtroLiner Sarking XO/SK (T&G)
— CavityTherm Flex CT/PIR Flex — XtroLiner Pitched Roof XO/PR
— Hyfloor Strip Foundation System — Safe-R FireLine Thermal Laminate SR/TB-FL
— XtroWall Plus 110 XO/XWP — Safe-R Close R XTCLSR
— Hyfloor XT/HYF (T&G)
30.
Specification Choice Questions for Self Build
— Specification choice for the self builder
— An air-tight build?
— Timber Frame or Traditional Block?
— Is NZEB as far as I can go?
— Double or Triple Glazing?
— Heating Systems?
— Pumped Cavities or Built-in?
— It’s in the detail - who monitors build quality?
— Wood Burning Stove or not?
— Detached Self Build: Compliance Pass and Fail examples
36.
Whole-Dwelling Energy Performance
www.xtratherm.ie 03
Practical solutions
to achieving NZEB
standard in Ireland
What is NZEB?
Nearly Zero Energy Building (NZEB): a building that
has a very high energy performance, as determined
in accordance with Annex I of the EU Energy
Performance of Buildings Directive Recast (EPBD
Recast) 2010/31/EU of 19th May 2010. The nearly
zero or very low amount of energy required should
be covered to a very significant extent by energy
from renewable sources, including energy from
renewable sources produced on-site or nearby.
Part L and European Union (Energy Performance of Buildings) (No. 2) Regulations
2019 Technical Guidance Document Conservation of Fuel
and Energy - Dwellings 0.5 Definitions
Xtratherm and
the drive for NZEB
Since the introduction of Meeting NZEB will require the attainment of
building regulations, it has been excellence in the performance of building envelopes.
Not only in design, but in the delivery on site, to close
recognised that the role played
the gap between intent and actual performance. In
by well insulated buildings was
Ireland our regulatory push has resulted in the delivery
paramount to energy conservation. of excellence both in understanding and build quality
Whether the goal was to reduce within certain sectors of the construction industry, not
our reliance on imported energy, least the drive for better performing self build projects
to reduce energy costs for the where knowledge and technique already meet the
homeowner or ultimately for NZEB standard in many cases.
environmental necessity, the
The following guidance gives examples of compliant
Fabric First approach has
fabric specification. The targets remain substantially
been recognised. unchanged, as those published by Xtratherm after
the 2011 changes to achieve ‘A’ Rated Designs’.
For over 30 years Xtratherm has worked with
The next step to NZEB is already being achieved.
individuals and organisations to develop and promote
better understanding, better evaluation and better
Fabric First must remain the first priority for all.
building techniques for Irish Construction. Whether
Whether the energy we use to heat, light and power
Passive standard, Fabric Energy Efficiency standard
our homes comes from renewable sources or not, it
or Code for Sustainable Homes, we have witnessed
should never be wasted. That energy will be a cost
an enthusiastic drive for better energy
for the homeowner.
performance in buildings.
Xtratherm will continue to provide warranted
To meet these ambitions, Xtratherm have driven
calculations and advice on energy calculation. We
our own technical competencies in energy
will continue to contribute with our expertise in the
calculation and enthusiastically shared that
education of construction professionals and on site
knowledge with construction professionals,
training to improve energy performance, developing
educators and specifiers. This has allowed us
products and processes to reduce energy usage
to develop, in consultation with the construction
and are committed to reducing our own carbon
industry, innovative insulation systems delivering
footprint in Ireland.
detailing and continuity that delivers thermal
performances beyond simple U-Values.
Xtratherm Technical Team
The 2019 Irish Building Reglations sees the
introduction of NZEB standards. It is the most
significant advance in building standards in Ireland
in 30 years. These changes define all the levels
that we must meet as an industry to achieve
Nearly Zero Energy Buildings.
www.xtratherm.ie 05
EPC
Irish building regulations Technical Guidance Document L (TGD L) was
revised in 2019 setting minimum energy performance requirements for
new buildings to achieve Nearly Zero Energy Buildings (NZEB) targets
and ensuring that when buildings are renovated their energy
performance is upgraded.
≤ 0.30
Xtratherm Regulation Guides
CARBON
Guides to Irish Regulation requirements in Part L and Part F are available
CP C
from the Xtratherm website or from the Xtratherm Technical Support team.
Technical Guidance Document (TGD).
RER
≤ 0.20
For all new builds, NZEB is equivalent
to a 25% improvement in energy
performance on the 2011 Building
Regulations. A range of examples are
shown in excel versions of the DEAP
software available in the Domestic
BER Resource page. Key changes to
Part L for NZEB compliance include a:
2. Maximum Carbon
Performance of 0.35
NZEB
Solutions
CavityTherm CT/PIR 12
CavityTherm Flex CT/PIR Flex 14
Hyfloor Strip Foundation System 16
XtroWall Plus 110 XO/XWP 18
Hyfloor XT/HYF (T&G) 20
XtroLiner Sarking XO/SK (T&G) 22
XtroLiner Pitched Roof XO/PR 24
Safe-R FireLine Thermal Laminate SR/TB-FL 26
Safe-R Close R XTCLSR 28
www.xtratherm.ie 11
12 The NZEB Guide
CavityTherm
Built-in Full Fill Cavity Walls
Key Benefits
Engineered HIPs facer provides
wind driven rain protection
Typical U-Values
Block Type
Med 0.33 0.19 0.17 0.15 0.13
Thermal Resistances
100 4.50
110 5.00
The CavityTherm boards have
CavityTherm gas tight facings with one face 125 5.70
CavityTherm Flex
Built-in Full Fill Cavity Walls
CavityTherm Flex is the perfect solution when
insulating fair faced inner block walls or when
block is laid flat resulting in an uneven surface to
accept the insulation. The 25mm flexible fleece layer
absorbs any variations due to block tolerances,
providing a continuous unbroken bond between
insulation layer and block. Achieve passive level
U-Values as low as 0.14 W/m²K with excellent
thermal bridging detailing in cavities less than
150mm wide.
Key Benefits
Engineered HIPs facer provides
wind driven rain protection
Excellent Thermal
bridging values
www.xtratherm.ie 15
Block Type
Med 0.33 0.16 0.13
might have penetrated the
external wall down the Dense 1.13 0.17 0.14
protective facing and back onto
the external leaf. The internal Includes 5mm residual cavity, 25mm flexible fleece, plaster finish.
face has a 25mm flexible fleece
CavityTherm Flex (Inner block 100)
layer to accept discrepancies in
the inner block facing.
125mm 150mm
Block Type
Med 0.33 0.16 0.14
on all four edges to allow the
system to tightly interlock Dense 1.13 0.17 0.14
when installed.
CavityTherm Flex Includes 5mm residual cavity, 25mm flexible fleece, plaster finish.
Thermal Conductivity 0.021 (W/mK)
Length (mm) 1200 Thermal Resistances
Width (mm) 450
Thickness (mm) 125, 150 Thickness (mm) R-Value* (m2 K/W)
125 5.50
150 6.70
Hyfloor Strip
Foundation System
Hyfloor Strip Foundation System, combining engineered floor
insulation with high performance foundation riser panels with
medium density block, achieves both U-Values and PSI value
detailing to achieve NZEB and passive floor performance.
Providing effective insulation, that has been detailed and installed professionally at the initial Typical U-Values
stages of any building project has multiple benefits. Detailing properly at floor level sets
the standard for the thermal performances and installation accuracy of the total building Ground Supported Slab
envelope; get the floor right and good practice is set for the rest of the build. Hyfloor Strip
Foundation System provides U-Value and Thermal Bridging performance to meet NZEB 0.40 0.50 0.60 0.70 0.80 0.90
standards along with assurance of compressive strength at foundation level.
75mm 0.19 0.20 0.20 0.21 0.21 0.21
Thickness (mm)
The inclusion of a medium density 100mm 0.15 0.16 0.16 0.17 0.17 0.17
block (3) provides a full 7.5Kn base for
125mm 0.13 0.13 0.14 0.14 0.14 0.14
loading requirements. At this stage,
(before the outer leaf is built) inspection 150mm 0.11 0.12 0.12 0.12 0.12 0.12
and sign off of this critical junction can
1
ensure compliance with the ACDs. - 65mm screed
3 - Separating Layer Polythene sheet
Traditionally, block work contractors
- Insulation with Perimeter strips
are relied upon to provide this robust - DPM 1200 gauge Polythene or Radon barrier
detailing after riser walls (4) have been - Concrete slab
2 built to DPC level. This normally entails
pushing insulation into a cavity from Suspended Hollow Core Floor
above in contravention of SR325
4 guidance. 0.40 0.50 0.60 0.70 0.80 0.90
Notes For Render 75mm 0.19 0.19 0.20 0.20 0.20 0.21
Thickness (mm)
1. 150mm Hyfloor 100mm 0.15 0.16 0.16 0.16 0.16 0.17
Traditionally, insulating at floor level didn’t receive
2. Hyloor Foundation Strip 125mm 0.13 0.13 0.14 0.14 0.14 0.14
the attention by designers and site operatives
that is now required to meet NZEB or Passive 3. Medium Density Block 150mm 0.11 0.11 0.12 0.12 0.12 0.12
standards; normally within a day, the insulation
4. Riser walls
and all detailing are buried within the structure. - 65mm screed
The real disconnect however is the relationship Where the DPC is folded at wall-floor - Separating Layer Polythene sheet
between the installation of the floor insulation and junctions it doubles in thickness which - Insulation with Perimeter strips
the wall insulation. Typically completed as two pushes out the insulation and causes - DPM 1200 gauge Polythene or Radon barrier
separate skills at different times, and often by issues within the cavity. - 150mm Suspended Hollow Core floor
different teams, without consideration of their effect
Our riser board has a thicker 20mm
on thermal bridging at the wall/floor junction.
fleece which can compensate for
Installing the Hyfloor insulation (1) along with the this while still maintaining the thermal
foundation strip insulation (2) at ground work efficiency of the insulation and integrity
stage ensures a thermally efficient junction. of the cavity offering a simple solution
Foamglas Threshold
to a typically complicated problem.
Thermal Bridging Detailing at thresholds offers particular issues in
achieving the continuity of insulation. Avoiding
thermal bridging, whilst maintaining level
Thermal Bridging, the Y-Value & NZEB thresholds and avoiding water damage and
It might help to view the Y-Value that is used in DEAP to measure the effectiveness degradation needs careful detailing.
of detailing at junctions (basically how continuous the insulation system is) as Xtratherm have solutions using Perinsul by
a PENALTY U-Value. This U-Value is spread over the buildings to account for Foamglas to achieve passive levels for this
additional heat loss at junctions. Lets say you design your building element to difficult junction.
achieve an average U-Value of 0.15W/m²K. The default Y-Value when using the
government published Acceptable Details is 0.08 W/m2K, bringing your average Contact Xtratherm for literature and CPD.
U-Value to 0.023W/m²K Xtratherm Detailing including the Xtratherm Riser can
achieve Y-Value of <0.03. - The typical target to achieve NZEB.
1 2 3 4
Engineered Jointing
1 3 Typical U-Values
Table 1
U-Value calculations to EN ISO:6946
XtroWall Plus Insulation for Partial Fill Cavity Walls
Thickness (mm)
The XtroWall Plus Cavity Wall
Block outer leaf with 215mm
System includes an optional 0.15
Hollow block inner (plastered)
pre-formed corner panel that
Brick outer leaf with 100mm
folds to 90 degrees to effectively 0.15
dense block inner (plastered)
insulate a junction that is normally
vulnerable to thermal bridging Wet plaster finish: increase insulation thickness by 5mm
and cold spots. Wall ties taken as S/S wire at 3 ties per m2
- 19mm render
XtroWall Plus
- 100mm outer leaf blockwork
Length (mm) 1200 2 - Low emissivity unventilated cavity
Width (mm) 450 The XtroWall Plus engineered (0.713 resistance)
Thickness (mm) 110 jointing offers a practical on-site - XtroWall Plus cavity wall partial fill PIR insulation
solution that results in a more - 100mm inner leaf blockwork
Other thicknesses may be available depending on robust continuous layer of - Plaster finish
minimum order quantity and lead time.
insulation, minimising the threat
of thermal bridging and Thermal Resistances
Property & Units improving the overall U-Value
Thickness (mm) R-Value (m2 K/W)
Thermal Conductivity 0.020 (W/mK) of the wall.
110 5.5
Compressive Strength >120 (kPa)
Reaction to Fire Euroclass C-s2, d0 3 Resistance ‘R’ Values
The resistance value of any thickness of Xtratherm insulation can
The textured robust low
be ascertained by simply dividing the thickness of the material
Xtratherm CE Declaration of Performance (DoP) for this emissivity foil facing on XtroWall (in metres) by its lambda value, for example: Lambda 0.020 W/
product is available for download from our website.
Plus improves the thermal mk and thickness 110mm -> 0.110/ 0.020 -> R-Value = 5.5. In
performance of the wall. The accordance with EN 13165, R-Values should be rounded down
residual cavity is the most to the nearest 0.05 (m2K/W).
Specification Clause
effective method of preventing
wind-driven rain penetrating a
Thermal Bridging
The partial fill cavity wall insulation shall be Xtratherm wall from the outside.
XtroWall Plus manufactured to EN 13165 by To achieve good detailing, Acceptable
Xtratherm, comprising a rigid modified Construction Details (ACDs) should be followed
Polyisocyanurate (PIR) core with textured robust low during the planning, design and build process.
Note
emissivity foil facings and engineered shiplapped
A residual cavity is the air space
jointing. XtroWall Plus _ _ _mm with Agrément
that remains when XtroWall Plus Xtratherm PSI Values
declared Lambda value of 0.020 W/mK to achieve a
is placed against the inner Using Acceptable Details
U-Value of _ _ _ W/m2K for the wall element. To be
leaf of the cavity of a wall. The
installed in accordance with instructions issued by Acceptable Details Block Type PSI
recommended residual cavity
Xtratherm. 1.01a GF Dense 1.13 0.164
width required is 40mm in
accordance with Irish Building 1.01b GF Med 0.33 0.088
Xtratherm PIR achieves an A+ rating 1.01b GF Light 0.20 0.065
Regulations, however a reduced
under the BRE Green Guide. 1.23.2 Lintel Close-R Dense 1.13 0.004
cavity may be permissible in
certain circumstances. A 50mm 1.23.2 Lintel Close-R Med 0.33 0.000
Refer to NBS clause F30 155, F30 12
residual cavity is typically required 1.25 Jamb Close-R Dense 1.13 0.004
in Northern Ireland. 1.25 Jamb Close-R Med 0.33 0.000
1.26 Sill Forward Dense 1.13 0.026
1.26 Sill Forward Med 0.33 0.016
1.27.1 Corner Dense 1.13 0.041
1.27.1 Corner Med 0.33 0.036
20 The NZEB Guide
Hyfloor (T&G)
Insulation for Ground Supported and Suspended Floors
Key Benefits
Excellent 0.021 W/mK Lambda value
Typical U-Values
Table 1
U-Value calculations to EN ISO:6946 for
IRL XT/HYF (T&G) Insulation for Ground Supported Floors
2 - 65mm screed
- Separating layer Polythene sheet
4
- Insulation with Perimeter strips
- DPM 1200 gauge Polythene or Radon barrier
3 - Concrete slab
Perimeter/Area Ratio
Thickness (mm)
100mm 0.15 0.16 0.16 0.17 0.17
125mm 0.13 0.13 0.14 0.14 0.14
150mm 0.11 0.12 0.12 0.12 0.12
1
The Hyfloor (T&G) tongue and Table 2
U-Value calculations to EN ISO:6946 for IRL
groove jointing offers a practical XT/HYF (T&G) Insulation for Hollow Core Suspended Floor
on-site solution that results in a
- 65mm screed
more robust continuous layer of - Separating Layer Polythene sheet
insulation, minimising the threat of - Insulation with Perimeter strips
thermal bridging. - DPM 1200 gauge Polythene or Radon barrier
- 150mm Suspended Hollow Core floor
XT/HYF (T&G)
2 Perimeter/Area Ratio
Length (mm) 2400
Width (mm) 1200 Hyfloor (T&G) is lightweight and
0.40 0.50 0.60 0.70 0.80
suitable for use with underfloor
Thickness (mm) 75, 100, 125, 150 75mm 0.19 0.19 0.20 0.20 0.20
heating. Thanks to its thickness to
Thickness (mm)
performance ratio, it allows for 100mm 0.15 0.16 0.16 0.16 0.16
Other thicknesses may be available depending on
minimum order quantity and lead time. reduced insulation thickness. The 125mm 0.13 0.13 0.13 0.14 0.14
boards should be laid staggered 150mm 0.11 0.11 0.12 0.12 0.12
in a break bonded pattern and
Property & Units
fitted tightly at edges and around
Thermal Conductivity 0.021 (W/mK) any service penetrations. Thermal Resistances
Compressive Strength >140 (kPa)
Thickness (mm) R-Value (m2K/W)
Reaction to Fire NPD
75 3.55
3
Xtratherm CE Declaration of Performance (DoP) for this 100 4.75
product is available for download from our website.
Hyfloor (T&G) provides the most
125 5.95
efficient means of floor insulation.
150 7.10
It has the strength and thermal
Specification Clause properties required to reach the Resistance ‘R’ Values
high performance U-Values asked The resistance value of any thickness of Xtratherm insulation can be
for in the Building Regulations. ascertained by simply dividing the thickness of the material (in metres)
The floor insulation shall be Xtratherm Thin-R by its agrément declared lambda value, for example: Lambda
0.021 W/mk and thickness 75mm -> 0.075/ 0.021 ->
XT/HYF (T&G) manufactured to EN 13165 by 4 R-Value = 3.55. In accordance with EN 13165, R-Values should
Xtratherm, comprising a rigid Polyisocyanurate (PIR) be rounded down to the nearest 0.05 (m2 K/W).
Good detailing at the wall/floor
core between low emissivity gas tight facings.
junction is essential to reduce
The XT/HYF (T&G) _ _ _mm with Agrément certified
thermal bridging. By placing an
Thermal Bridging
Lambda value of 0.021 W/mK to achieve a U-Value
upstand of Xtratherm Perimeter
of _ _ _W/m2K for the floor element. To be installed
strip (XT/STR) insulation 25mm To achieve good detailing, Acceptable Construction
in accordance with instructions issued by Xtratherm.
thick around the external and Details (ACDs) should be followed during the planning,
design and build process.
internal wall/floor junctions, a
Xtratherm PIR achieves an A + rating under
robust detail is created.
the BRE Green Guide.
Xtratherm PSI Values*
Using Acceptable Details
Refer to NBS clause M10 290, M10 40,
Acceptable Details Block Type PSI
M13 260, M13 40
1.01a GF Dense 1.13 0.168
1.01a GF Med 0.33 0.064
1.01a GF Light 0.20 0.063
Key Benefits
Robust Tongue & Groove Jointing
Typical U-Values
Table1
U-Value calculations to EN ISO:6946
XO/SK (T&G) Insulation for Sarking
1 Warm Roof Construction
1 - Breather Membrane
XO/SK (T&G) - XO/SK (T&G) over Rafters to reduce
The XO/SK (T&G) tongue and
Length (mm) 2400 groove jointing offers a practical thermal bridging
Width (mm) 1200 on-site solution that results in a
- XO/PR between Rafters
Thickness (mm) 50, 75, 100, 125 more robust continuous layer of
insulation, minimising the threat - Vapour Control
Other thicknesses may be available depending on minimum of thermal bridging and - Plasterboard
order quantity and lead time. improving the overall U-Value
of the roof.
Property & Units Thermal Resistances
Thermal Conductivity 0.021 (W/mK) 2
Compressive Strength >150 (kPa) Detailing with vapour permeable Thickness (mm) R-Value (m2 K/W)
Reaction to Fire Euroclass C-s2, d0 membranes and vapour control
membranes can be more 50 2.35
Xtratherm CE Declaration of Performance (DoP) for this accurately achieved with
75 3.55
product is available for download from our website. insulation in a single plane.
100 4.75
1 Typical U-Values
Table1
U-Value calculations to EN ISO:6946
XO/PR Insulation for Pitched Roof
2
Hybrid Roof
Safe-R Fireline
Thermal Laminate
Insulation for Drylining Walls Fixed with
either Adhesive Dabs or Mechanical Fixing
Key Benefits
Superior Thermal Performance – As low
as 0.020 W/mK
Safe-R Fireline Thermal Laminate on sloped *Safe-R Fireline Thermal Laminate was tested Typical U-Values
roofs (ventilated or hybrid) provides the most to EN1365-2: 2012 to achieve a 45 minute
efficient U-Values with minimal intrusion into fire rating* with the following construction.
Table 1 - Sloped Roofs
valuable living space and the assurance of 45 SR/PR 100mm was fitted between the joists
U-Value calculations to EN ISO:6946
minutes* fire rating. with Pur Pro TEC7 applied between the edge
SR/TB-FL Insulation for Pitched Roof
of the insulation and the joists. The 65mm
In a conventional ventilated roof a 50mm
Safe-R Fireline Thermal Laminate was fixed
clear ventilation gap should be maintained Hybrid Roof
to the joists by countersunk screws ( 5 x
between the insulation and the roofing
120mm) spaced evenly at 400mm centres. SR/PR SR/TB-FL 400mm 600mm
felt. In certain instances where a vapour between under centres centres
Scrim tape and filler were applied at board
permeable membrane is used the ventilation rafters rafters
joints. Intusil Firetherm sealant was applied to
gap may be reduced or dispensed with,
the exposed edge of the roof and wall where 100mm 50mm* 0.15 0.14
check with membrane manufacturer. Refer to
gaps were present. A gypsum-based finish
manufacturer’s guidelines. 120mm 50mm* 0.14 0.13
plaster was applied.
120mm 60mm* 0.13 0.12
Hybrid Roof
- Approved Breather Membrane 25mm Void
- SR/PR between Rafters
- SR/TB-FL under Rafters to reduce thermal bridging
- Vapour Control Layer
- Plasterboard
50 ’ 60 ’ 70 ’ 80 ’ 90 ’
Cavity Wall
Pumped 0.16 0.15 0.14 0.13 0.13
Brick & Block*
Safe-R Close-R
A high performance EN fire-rated cavity
closer providing compliance with structural
and thermal regulations in Ireland.
Safe-R Close-R achieves an excellent fire rating and allows
for the correct placement of wall ties to meet TGD Part A
structural requirements. The superior insulation performance
attains Passive & NZEB standards for thermal bridging.
Key Benefits
Achieved in excess of 4 hour fire rating
in a 150mm cavity when tested to
EN1366-4
These extra structural ties do interrupt the continuity of the insulation layer and increase TGD A - Requirements for additional wall ties
thermal bridging issues at very vulnerable areas, with mould growth normally most at openings and movement joints
evident at reveals. Safe-R Close-R achieves an excellent fire rating and allows for the
correct placement of wall ties to meet TGD Part A structural requirements. The superior Wall ties should be provided in cavity
insulation performance attains Passive & NZEB standards for thermal bridging. walls and should comply with I.S. EN 845-1.
Safe-R Close-R is available with a PVC weatherproof casing that is keyed to accept a
plaster finish.
1
5
25
The Safe-R Cavity Closer shall comprise of a rigid Phenolic core between low
Detail Safe-R Default Safe-R Close-R
emissivity foil facings manufactured to EN 13166 with a declared Lambda value f-Factor
Close-R PSi Value PSi Value
as low as 0.020 W/mK and mineral wool manufactured to EN 13162, with a
declared Lambda value as low as 0.037 W/mK wrapped in a protective red 125mm Cavity
0.006 0.004 0.96
Wall Jamb
sleeve to achieve a minimum 1 hour fire resistance tested to EN 1366/4.
To be installed in accordance with instructions issued by Manufacturer. 150mm Cavity 0.006
0.005 0.97
Wall Jamb
Specification choice
Questions for Self Build...
Traditionally when you made the decision to build your own home
the question of ‘How energy efficient should it be? was up there
with ‘What size? How many bedrooms? What finishes will I choose?’
Specification choice
for the Self Builder
There are a range of compliance options available to the Designer or
Specifier. The Fabric First approach concentrates on achieving
U-Values and Thermal Bridging detailing improvements towards Passive
levels. These measures might be less dynamic than mechanical ventilation
systems or additional renewable technologies, but you only get one
chance at getting the insulation correct. Insulation just ‘sits there’
and quietly reduces energy consumption and lowers running costs.
An air-tight build?
The Government ‘recipe’ within natural ventilation is chosen to Excerpt:
Part L reaches NZEB standard with a ensure adequate background France: Jobert (2012) & Guyot et al. (2015)
reasonable air permeability of 5. This ventilation is achieved naturally and 1287 new dwellings – 68% had non-compliant
ventilation systems.
allows for natural instead of mechanical regulation standards are met. In
ventilation to be used. Pushing air Ireland we are blessed with a mild All of the 21 low-energy houses to Building
Regulations 2012 did not comply fully with
tightness beyond 5 really necessitates climate where most of us sleep with
ventilation requirements:
the requirement for mechanical whole the windows open, it is a matter of
— 55% due to poor on-site installation
house ventilation systems which must preference.
be designed, installed and maintained — 43% due to a poor design
professionally – it is not easy to get right. At the Air Infiltration and Ventilation — 2% due to inappropriate use/maintenance
Symposium in Dublin March 2019 it by end user
In many constructions an Air Tight was illustrated how difficult it is to get UK: Zero Carbon Hub (2016)
regime will be necessary to maximise the desired performances – 33 dwellings – 6 sites to Building Regulations
2010. Not one site complied with Building
the choice of renewable heating https://www.aivc.org/resources/collection-
Regulations on ventilation.
system. Ensure that your Architect papers/volume/27-28-march-2019-quality-
UK: AECOM (2016)
and Engineer are fully competent ventilation-key-achieving-low-energy (search
2 in 55 new dwellings with NV complied
in the design and installation of the for AIVC Dublin) and 1 in 25 new dwellings with MEV
mechanical ventilation systems – complied. Only 16% of MVHR were
maintenance is down to you. Careful installed correctly.
Detached:
Self Build
In this example, we have achieved compliance by using 150mm CavityTherm and 150mm Hyfloor using
calculated Y-Values for the fabric in combination with a heat pump to satisfy the renewable contribution.
PASS
Item U-Value Specification
Detached:
Self Build
Using backstop U-Values and uncalculated default Y-Values, it shows the effect on
the results compared to the previous option while keeping the specification identical.
FAIL
Item U-Value Specification
Whole-Dwelling
Energy Performance
New Dwellings
Primary energy use and the associated carbon dioxide appears in Technical Guidance Document supporting
emissions, as calculated using the Dwelling Energy document Heating and Domestic Hot Water Systems for
Assessment Procedure (DEAP) must not exceed Dwellings (forthcoming). SEAI maintains databases of
specified target values. renewable energy systems products, including information
about their performance characteristics.
In order to achieve the primary energy use rate for
Where the EPC ≤ 0.30 and the CPC ≤ 0.35 the ratio of
NZEB the energy performance coefficient (EPC) of a
primary energy from renewable energy technologies to
dwelling must be no greater than the Maximum Permitted
total primary energy use (known as the Renewable Energy
Energy Performance Coefficient (MPEPC), which is 0.30.
Ratio, or RER) should be at least 0.20, which meets
The EPC is calculated by dividing the primary energy
the EPBD requirement for a ‘significant level of energy
use of the dwelling (calculated using DEAP) by the
provision from renewable energy technologies’ in NZEB.
primary energy use of a reference dwelling defined
The RER is calculated by DEAP, and the requirement is:
in Appendix C of TGD L. Primary energy does not
include energy derived from on-site renewable
energy technologies.
RER ≥ 0.20
An acceptable carbon dioxide emissions rate for NZEB is
achieved if the calculated carbon performance coefficient The contribution of local centralised renewable energy
(CPC) is no greater than the Maximum Permitted Carbon sources supplying a heat distribution system serving
Performance Coefficient (MPCPC), which is 0.35. The all the dwellings in a district, area or block may be
carbon performance coefficient is calculated by dividing included in the RER. Alternatively, a combined heat and
the carbon dioxide emissions (calculated using DEAP) power (CHP) system supplying heat and hot water and
by the carbon dioxide emissions of the same reference contributing thermal energy equivalent to an RER of 0.20
dwelling defined in Appendix C of TGD L. is an acceptable way of meeting the requirement. For
guidance on the design of CHP systems, TGD L refers to
Both requirements must be met, so in summary, the CIBSE Applications Manual AM12 Combined Heat and
whole-dwelling performance requirement for the dwelling Power in Buildings.
as constructed is:
Where a building contains more than one dwelling
(e.g. a terrace of houses or a block of apartments) it is
EPC ≤ 0.30 & acceptable to show that either every individual dwelling
CPC ≤ 0.35 has an EPC ≤ 0.30, a CPC ≤ 0.35 and an RER ≥ 0.20, or
that for all the dwellings in the building the average EPC
≤ 0.30, the average CPC ≤ 0.35 and the average RER ≥
Compliance is achieved easier in dwellings where 0.20. The average EPC, CPC and RER are calculated by
on-site renewable energy technologies are used. multiplying the EPC, CPC and RER calculated for each
Renewable energy technologies are solar thermal dwelling by its floor area, adding the results together
systems, solar photovoltaic systems, biomass systems, (separately) and dividing by the total floor area of the
biofuel systems, heat pumps, wind power generators building. Calculation of the average EPC and CPC should
and other similar small scale systems. Guidance on the exclude any common parts, but calculation of the average
specification of renewable technologies for dwellings RER should include any common parts.
www.xtratherm.ie 37
Our Commitment:
• Bespoke variable mixed loads • Dedicated Merchants Technical Support
of products, including phenolic • On-site support and training for installers
• Flexible delivery times • 3rd Party approved technical calculations
• Direct to site deliveries available • Access to sales opportunities
• Various transport vehicle types available • Training of merchant staff
• Dedicated Sales Support
Our team and products are certified Our technical team can also provide:
in Ireland and the UK and through
— Thermal calculations
the following certifications bodies:
— Technical advice on building
— BRE Thermal bridging modelling
regulations in Ireland and the UK
competency certification
— Technical papers on a variety of topics
— NSAI Thermal modelling
competency scheme — Certified CPD Presentations
Please refer to the Resources section of our website for more details
Get in touch
Meet the team who can help you with your project
info@xtratherm.ie
xtratherm.ie
MANAGEMENT MANAGEMENT
SYSTEMS SYSTEMS