You are on page 1of 23

Week Equipment

1 Rig 01
2 Rig 02
3 Rig 03
4 Rig 04
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
NO DATE DAY MONTH WEEK EQUIPMENT Transportation Accesibility
1 14-Apr-2022 THU APR 15 Rig 01 45
2 14-Apr-2022 THU APR 15 Rig 02 45
3 14-Apr-2022 THU APR 15 Rig 03 30
4 14-Apr-2022 THU APR 15 Rig 04 30
5 16-Apr-2022 SAT APR 16 Rig 01 60
6 16-Apr-2022 SAT APR 16 Rig 02 45
7 16-Apr-2022 SAT APR 16 Rig 03 30
8 16-Apr-2022 SAT APR 16 Rig 04 60 15
9 18-Apr-2022 MON APR 16 Rig 01 75
10 18-Apr-2022 MON APR 16 Rig 02 45 15
11 18-Apr-2022 MON APR 16 Rig 03 30
12 18-Apr-2022 MON APR 16 Rig 04 60 15
13 19-Apr-2022 TUE APR 16 Rig 01 60 7.5
14 19-Apr-2022 TUE APR 16 Rig 02 45 15
15 19-Apr-2022 TUE APR 16 Rig 03 30
16 19-Apr-2022 TUE APR 16 Rig 04 60 15
17 20-Apr-2022 WED APR 16 Rig 01 90 7.5
18 20-Apr-2022 WED APR 16 Rig 02 45
19 20-Apr-2022 WED APR 16 Rig 03 30
20 20-Apr-2022 WED APR 16 Rig 04 60 15
21 21-Apr-2022 THU APR 16 Rig 01 90 7.5
22 21-Apr-2022 THU APR 16 Rig 02 45 15
23 21-Apr-2022 THU APR 16 Rig 03 30
24 21-Apr-2022 THU APR 16 Rig 04 60 15
25 22-Apr-2022 FRI APR 16 Rig 01 90 7.5
26 22-Apr-2022 FRI APR 16 Rig 02 45 15
27 22-Apr-2022 FRI APR 16 Rig 03 30
28 22-Apr-2022 FRI APR 16 Rig 04 60 15
29 23-Apr-2022 SAT APR 17 Rig 01 60 7.5
30 25-Apr-2022 MON APR 17 Rig 01 60
31 26-Apr-2022 TUE APR 17 Rig 01 60 7.5
32 27-Apr-2022 WED APR 17 Rig 01 30 7.5
33 28-Apr-2022 THU APR 17 Rig 01 30
34 23-Apr-2022 SAT APR 17 Rig 02 45 15
35 25-Apr-2022 MON APR 17 Rig 02 30 15
36 26-Apr-2022 TUE APR 17 Rig 02 30 15
37 27-Apr-2022 WED APR 17 Rig 02 30 30
38 28-Apr-2022 THU APR 17 Rig 02 30 15
39 23-Apr-2022 SAT APR 17 Rig 03 60
40 25-Apr-2022 MON APR 17 Rig 03 30
41 26-Apr-2022 TUE APR 17 Rig 03 30
42 27-Apr-2022 WED APR 17 Rig 03 30
43 28-Apr-2022 THU APR 17 Rig 03 30
44 23-Apr-2022 SAT APR 17 Rig 04 60 15
45 25-Apr-2022 MON APR 17 Rig 04 60 15
46 26-Apr-2022 TUE APR 17 Rig 04 60 15
47 27-Apr-2022 WED APR 17 Rig 04 60 15
48 28-Apr-2022 THU APR 17 Rig 04 60 15
Safety Talk Toolbox Meeting Engine Check Fueling Drilling Water problem
60 7.5 7.5
60 7.5 7.5
60 15 15
60 15 15
75 7.5 7.5 75
15
15 15 15 255
15 15 90
60 7.5 7.5 300
30 7.5 7.5 135
60 390
30 15 300
7.5 7.5 7.5 330

15 15 420
15 15 15 300
7.5 7.5 7.5 270
15 10 5 405
450
15 15 15
7.5 7.5 7.5 150
7.5 7.5 315
15 15 15 60
15 15 15
7.5 7.5 7.5 150
10 5 225
15 15 15 270
15 15 270
7.5 7.5 7.5 390
90 7.5 7.5 315
7.5 7.5 7.5 150
7.5 7.5 7.5 405 15
15 15 15
10 5 255
45 10 5 105
10 5 330
10 5 270
10 5 60
15 15 15 165
60 15 15 255
15 15 15 315
15 15 15 405
15 15 15
15 15 15 330
30 15 15 255
15 15 15 300
15 15 15 360
15 15 15 360
Pull out rod Rig Down Waiting Dozer Moving Rig Setting Resting/Lunch
30 165 60
30 165 60
180 75
180 75
75 60
60 60
60
60
60
60
60
60
60
60
60
60 60
60 60
60
60
60
60 90 60 60
30 60
60 60
60
60 90
120 120
105
30 15 30 60
60
60
30 90 120 60
60
75 90 135 60
60
30 90 45 45 60
90 60
60
30 45 165 60 60 60
15 45 75 75 60
60
15 60 75
60
75 90 135 60
30 60
30 60 60
15 15 30 60
60
60
Technical Problem PM Check Mechanical Problem Accessories & Mat

225
90

30
240

30
30
255

360

285
150
120

45
30

150

105
Waiting Supervisor Weather Cond. Permit & others Reporting HOUR VALIDATION
165 VALID
165 VALID
165 VALID
165 VALID
180 VALID
135 VALID
60 VALID
285 VALID
VALID
VALID
VALID
30 VALID
30 VALID
165 VALID
VALID
VALID
30 VALID
VALID
VALID
VALID
VALID
60 VALID
VALID
210 VALID
VALID
VALID
45 VALID
VALID
VALID
VALID
VALID
VALID
105 VALID
VALID
60 VALID
VALID
135 VALID
VALID
VALID
VALID
VALID
VALID
105 VALID
VALID
VALID
VALID
VALID
VALID
WEEK : 16 HOUR
ACTIVITY Rig 01 Rig 02 Rig 03 Rig 04 TOTAL
Transportation 465 225 180 360 1230
Accesibility 30 105 0 90 225
Safety Talk 135 60 75 60 330
Toolbox 30 0 45 45 120
Engine Check 45 35 60 90 230
Fueling 45 25 45 45 160
Drilling 1275 1080 1845 960 5160
Water problem 0 0 0 0 0
Pull out rod 120 150 60 90 420
Rig Down 0 0 0 0 0
Waiting Dozer 0 0 0 0 0
Moving Rig 90 0 0 15 105
Setting 195 60 0 30 285
Resting/Lunch 390 420 405 360 1575
Technical Problem 0 0 0 0 0
PM Check 0 0 0 0 0
Mechanical Problem 180 720 135 210 1245
Access. & Mat 0 0 285 360 645
Waiting Spv. 0 0 0 0 0
Weather Cond. 30 0 0 0 30
Permit & others 210 360 105 525 1200
Reporting 0 0 0 0 0
12960
Percentage (%)

9.49
1.74
2.55
0.93
1.77
1.23
39.81
0.00
3.24
0.00
0.00
0.81
2.20
12.15
0.00
0.00
9.61
4.98
0.00
0.23
9.26
0.00
100
NO DATE DAY MONTH WEEK EQUIPMENT Transportation Accessibility
1 8-Apr-2022 FRI APR 14 D65 KOMATSU 60
2 9-Apr-2022 SAT APR 15 D65 KOMATSU 60
3 11-Apr-2022 MON APR 15 D65 KOMATSU 60
4 13-Apr-2022 WED APR 15 D65 KOMATSU 60
5 14-Apr-2022 THU APR 15 D65 KOMATSU 60
6 16-Apr-2022 SAT APR 16 D65 KOMATSU 60
7 18-Apr-2022 MON APR 16 D65 KOMATSU 60
8 19-Apr-2022 TUE APR 16 D65 KOMATSU 60
9 20-Apr-2022 WED APR 16 D65 KOMATSU 60
10 21-Apr-2022 THU APR 16 D65 KOMATSU 60
11 22-Apr-2022 FRI APR 16 D65 KOMATSU 60
12 23-Apr-2022 SAT APR 17 D65 KOMATSU 60
13 26-Apr-2022 TUE APR 17 D65 KOMATSU 60
14 27-Apr-2022 WED APR 17 D65 KOMATSU 60
15 28-Apr-2022 THU APR 17 D65 KOMATSU 60
Safety Talk Engine Check Fueling Drill Padding Service Pad Made road access
120 90
30 30 210 120
30 30 30 120 180
30 30 30 210
30 15 30 90 315
30 15 15 255 165
30 15 15 330 90
15 15 15 195 135
15 15 15 255 180
15 15 15 315 60
15 15 300 150
30 15 15 180 240
15 15 210 240
15 15 225 225
15 15 15 180 225
Service road access Pulling Rig Resting/lunch Mechanical problem PM Check
90
60
60
30
60
60
60
60
60
60
60
60
60
60
60
Technical Problem Weather Cond. Stand by Others Total Total Pad
240 600
90 600 4
90 600 2
120 60 30 600 1
600 1
600 5
600 7
45 60 600 3
600 5
540 5
600 8
600 2
600 3
600 3
30 600 3
Average (Pad/day) Mechine Hours
2
5
7
4
7
8
8
8
8
8
8
8
8
8
7
NO DATE DAY MONTH WEEK EQUIPMENT Transportation Accessibility
1 5-Apr-2022 TUE APR 14 PC 320 30
2 6-Apr-2022 WED APR 14 PC 320 30
3 7-Apr-2022 THU APR 14 PC 320 30 15
4 8-Apr-2022 FRI APR 14 PC 320 30
5 9-Apr-2022 SAT APR 15 PC 320 30
6 11-Apr-2022 MON APR 15 PC 320 30 15
7 13-Apr-2022 WED APR 15 PC 320 30
8 14-Apr-2022 THU APR 15 PC 320 30
9 16-Apr-2022 SAT APR 16 PC 320 60
10 18-Apr-2022 MON APR 16 PC 320 30
11 19-Apr-2022 TUE APR 16 PC 320 60
12 20-Apr-2022 WED APR 16 PC 320 30 45
13 21-Apr-2022 THU APR 16 PC 320 30 60
14 22-Apr-2022 FRI APR 16 PC 320 30 60
15 23-Apr-2022 SAT APR 17 PC 320 60
16 25-Apr-2022 MON APR 17 PC 320 30
17 26-Apr-2022 TUE APR 17 PC 320 60
18 27-Apr-2022 WED APR 17 PC 320 60
19 28-Apr-2022 THU APR 17 PC 320 30 45
Safety Talk Engine Check Fueling Drill Padding Service Pad Made road access
45 30
60 30 45 30 90
60 30 90 105 90
60 30 30 60 30 90
30 30 60 90 105
45 30 30 60 30 45
30 30 30 60
60 30 30 60 45 105
45
30 30 45 375
15 60
15 30 75 60 120
30 30 30 45 60
30 30 30 60 90
30
45 30 60

15 15 240 105
15 30 30
Service road access Pulling Rig Resting/lunch Mechanical problem PM Check
45 60
60 60
15 60
105
90 60
150 60
45 195 60
90 60
60
60
225 60
45 60 60
105 90 60
90 75
75
225 120 60
120 90
105 60
75 195 60 45
Waiting Sparepart Technical Problem Weather Cond. Stand by Others Total
150 240 600
165 30 600
30 60 15 600
165 600
75 30 600
105 600
90 30 600
60 30 600
405 30 600
30 600
180 600
60 600
30 30 600
75 30 600
165
30 600
330 600
600
45 30 600
Total Pad/Day Total Pulling Rig/Day Mechine Hours
1
1 3
3 7
1 5
1 8
1 6
3 7
1 1 8
8
8
7
1 7
1 8
1 6
1 8
1 8
1 8
8
1 7

You might also like